Cpim stuvia - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cpim stuvia? On this page you'll find 23 study documents about Cpim stuvia.

Page 2 out of 23 results

Sort by

CPIM Part 1 Exam Questions With Correct Answers
  • CPIM Part 1 Exam Questions With Correct Answers

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • Supply Chain Management - Answer The design, planning, execution, control, and monitoring of supply chain activities with the objective of creating net value, building a competitive infrastructure, leveraging worldwide logistics, synchronizing supply with demand, and measuring performance globally Value Chain Analysis - Answer An examination of all links a company uses to produce and deliver its products and services, starting from the origination point and continuing through delivery to the ...
    (0)
  • $11.49
  • + learn more
CPIM Part 2 Final Study Guide With Complete Solution
  • CPIM Part 2 Final Study Guide With Complete Solution

  • Exam (elaborations) • 437 pages • 2024
  • Available in package deal
  • Distribution requirements planning (DRP) provides transportation planners with: Answers locations for scheduling deliveries. backhauling information. load optimization information. current and future shipping requirements. - Answer Answer Rationale DRP can convert the schedule of planned orders into transportation data elements such as weight, volume, and number of pallets. current and future shipping requirements. Which is a decision at the operations strategy level related to plann...
    (0)
  • $17.89
  • + learn more
CPIM APICS Exam 1 Questions With Correct Answers
  • CPIM APICS Exam 1 Questions With Correct Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • Inventory is the ____ of Supply Chain - Answer life blood Inventory Turns equation - Answer Annual COGS/ Avrg inventory $ Matrix structure - Answer you can have more than one boss, one product group, Team members come from different teams are also members of the product management office Centralized corp structure - Answer decisions are made at the top Appropriate response to risk (4 Parts) - Answer 1. Try to avoid risk 2. Risk acceptance 3. Risk transfer 4. Risk mitigation Imp...
    (0)
  • $9.99
  • + learn more
CPIM Practice Exam Questions & Answers Accurate 100%
  • CPIM Practice Exam Questions & Answers Accurate 100%

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • A work center is receiving enough work, but it is not performing to plan. To detect problems in this work center, the planner should compare: - Answer actual output to planned output. A company is experiencing a change in demand from steady to sporadic. It currently uses economic order quantity (EOQ) to determine purchase quantities for a key component. Which of the following models should it use in the future? - Answer Period order quantity Which of the following roles of a finished goods...
    (0)
  • $11.49
  • + learn more
CPIM Part 1 Exam Practice Exam Questions With Correct Answers
  • CPIM Part 1 Exam Practice Exam Questions With Correct Answers

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • Which of the following tools is considered an important quality management tool? - Answer Control Chart. The primary use of control charts is to detect assignable causes of variation in a process. In a bill of material, the path that adds up to the greatest number of lead time periods defines the: - Answer Cumulative lead time; cumulative lead time for an items consists of the longest lead time path for a given bill of material. Delivery and demand lead times are subsets of cumulative lead ti...
    (0)
  • $11.49
  • + learn more
CPIM Exam Study Part 1 Section 2 Questions With Verified Answers
  • CPIM Exam Study Part 1 Section 2 Questions With Verified Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • How does enterprise resources planning (ERP) differ from manufacturing resource planning? - Answer ERP does not dwell on manufacturing alone. After an order is released, it turns out that not all of the resources needed are available. What will happen next? - Answer There will be idle capacity at some work centers unless rescheduled. Which of the following are manufacturing order pick lists most likely to exclude? - Answer Floor stock materials issued to the department A shop order pack...
    (0)
  • $10.99
  • + learn more
CPIM - Part 1 Formulas Exam Questions With Correct Answers
  • CPIM - Part 1 Formulas Exam Questions With Correct Answers

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • Planned Backlog - Answer Previous Planned Backlog + Planned Input - Planned Output Actual Backlog - Answer Previous Actual Backlog + Actual Input - Actual Output Throughput Formula - Answer Revenues Received - Variable Costs/ Units of Time Period New Safety Stock - Answer Old Safety Stock x √New Lead Time/Old Lead Time Demand During Lead Time - Answer Units per Period x Lead Time Takt Time - Answer Available Production Time/Rate of Customer Demand Cycle Time Formula - Answer ...
    (0)
  • $9.99
  • + learn more
APICS CPIM Final Formulas With Complete Solution
  • APICS CPIM Final Formulas With Complete Solution

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • order Point Deman * (TL)+ SS utilization - Answer actual output/design capacity slack time - Answer =(current date - due date) - amount of time remaining on operation Saftey stock - Answer customer serice level * sqrt(( theta demand * Lead Time) + ((theata Lead Time * average demand)^2)) carrying cost - Answer =carry cost rate (avg inv) Time Availability - Answer = (Equipment) * (hours in time bucket) Contribution Margin Ratio - Answer Contribution Margin / Sales Payback Peri...
    (0)
  • $9.99
  • + learn more
APICS CPIM Final Formulas With Complete Solution
  • APICS CPIM Final Formulas With Complete Solution

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • Capacity utilization - Answer =Actual output/total output capacity order Point - Answer Deman * (TL)+ SS planned order release - Answer planned receipt/(1- scrap factor) payback period - Answer cost of investment/ annual cash savings Return on Investment (ROI) - Answer profits/(cost of investment) Quick Ratio - Answer current assets-inventory/ liabilities available time - Answer =equipment * (time in time bucket) critical ratio - Answer time remaining untill due date /work r...
    (0)
  • $10.49
  • + learn more
APICS CPIM BSCM Session 8 Test Questions With Verified Answer
  • APICS CPIM BSCM Session 8 Test Questions With Verified Answer

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • to obtain goods and services of the required quality and right cost - Answer Which of the following is an objective of purchasing? a. to keep many sources ofsupply available to ensure competitive pricing b. to control budgetary expenditures ofall employees through sound PO control c. to obtain goods and services of the required quality and right cost d. to ensure that goods are always purchased at the lowest price purchase requisition - Answer In a purchasing system, which of the ...
    (0)
  • $9.49
  • + learn more