AFSB 152 - The Institutes Practice Exam Questions and Answers 2023
- Exam (elaborations) • 24 pages • 2023
-
Available in package deal
-
- $20.99
- 1x sold
- + learn more
AFSB 152 - The Institutes Practice Exam Questions and Answers 2023 
Lansing Construction Company completed major jobs including road grading, bridges, and base and paving work. Which one of the following types of contractors is Lansing? 
• Heavy and highway construction 
• General Engineering contractor 
• General Building contractor 
• Design/build contractor - Correct Answer-Heavy and highway construction 
 
The project owner for a new shopping plaza being built in Highville is the Hig...
-
ARC Study Final Exam 2 Questions & Answers 2024/2025
- Exam (elaborations) • 40 pages • 2024
-
Available in package deal
-
- $11.49
- + learn more
ARC Study Final Exam 2 Questions & Answers 2024/2025 
 
 
What kinds of documents will an architect be approving during Contract Administration? 
 
Shop Drawings 
Specifications 
Product Samples 
RFIs - ANSWERSRFIs 
 
What step is NOT part of the programming process? 
 
Formulating Relationships 
Collecting Data 
Establishing Goals 
Making Assumptions - ANSWERSMaking Assumptions 
 
What is the traditional way of delivering a project? 
 
Fast-Tracking 
Design-Build 
Design-Bid-Build 
Construction...
-
CNST 2341 Final || Questions and 100% Verified Answers.
- Exam (elaborations) • 26 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
AIA 201 
 
3.18 Indemnification 
 
3.18.1 correct answers Contractor shall hold the owner not liable for any harm done by him and shall compensate for any harm loss arising out of or resulting from any extent caused by the neglect or omission of the Contractor or any representative for the contractor is held liable. 
 
AIA 201 
 
3.18 Indemnification 
 
3.18.2 correct answers The person at fault from the contractors or subcontractors side has a claim on them then, they are liable to the indemn...
-
QABA Exam practice questions taken from Relias training_2023_ANSWRED WITH FEEDBACKS.
- Exam (elaborations) • 22 pages • 2022
-
- $12.09
- 8x sold
- + learn more
QABA Exam practice questions taken from Relias training_2023. 
 
*If you have an individual who engages in escape behaviors you should:* 
A. Alternate antecedent interventions daily to see which ones are the most effective. 
B. Provide all antecedent interventions that can prevent escape. 
C. Tailor antecedent interventions to the person you support based on data from the FBA. 
D. Choose 3 antecedent interventions for escape maintained behaviors 
 
*After cleaning up a work area contaminated wi...
-
Building Tech Latest Update Graded A+
- Exam (elaborations) • 221 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
Building Tech Latest Update Graded A+ 
 
What is thermal bridging? 
Thermal bridging occurs when a material with high thermal conductivity creates a path for 
heat flow across a thermal barrier, reducing insulation effectiveness. 
 
What does “constructability” refer to? 
Constructability refers to the ease and efficiency with which a building design can be 
constructed, taking into account construction methods and materials. 
 
What is the purpose of a riser in construction? 
A riser is a v...
Want to regain your expenses?
-
Exam 1- CNST 379 || All Questions Answered Correctly.
- Exam (elaborations) • 15 pages • 2024
-
Available in package deal
-
- $11.99
- + learn more
UNL's new College of Engineering Building (Kiewit Hall) uses which of the following project delivery methods? 
 
a. CMar 
b. design/build 
c. IPD 
d. P3 
e. Design-Bid-Build correct answers a. CMar 
 
It is usually easy for a general contractor to obtain private bid opportunities than it is to obtain public bid opportunities. 
 
True or False correct answers false 
 
An RFP, will typically contain which of the following: (Select all that apply) 
-Type of owner contract to be used 
-Anticipated ...
-
COSC 275 Exam 2 (Palmer) Questions with Correct Answers
- Exam (elaborations) • 11 pages • 2024
-
- $12.99
- + learn more
Hard bid low price Correct Answer-Owner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
 
Competitive sealed proposals Correct Answer-Involves criteria other than price when awarding contract 
Weight given to each criteria that will be considered 
 
Construction Manager at Risk CMAR Correct Answer-Construction manager hired in design phase to assist designer in constructibility. Also gives the owner a good handle on the cost. 
 
Design Build Correct Answer-Only one co...
-
COSC 253 FINAL EXAM REVIEW || WITH 100% VERIFIED SOLUTIONS.
- Exam (elaborations) • 17 pages • 2024
-
Available in package deal
-
- $12.79
- + learn more
A _____________________ code requirement contains detailed information, is simpler to implement, and provides certainty for designers and builders. 
descriptive 
prescriptive 
performance 
functioning correct answers prescriptive 
 
Which statement below is correct regarding the construction manager project delivery method? 
It is best suited for simple, straight forward projects 
The CM is involved in the project prior to construction 
The CM has very limited influence on the project 
It elimin...
-
Construction FE Civil Exam Questions with 100% Verified Correct Answers
- Exam (elaborations) • 18 pages • 2024
-
- $10.99
- + learn more
Construction FE Civil Exam Questions with 100% Verified Correct Answers 
Is the most traditional project delivery method and appeals to those looking for low-cost bids. In this method, the owner contracts designers and builders separately. - Correct Answer Design-bid-build 
 
is a construction project delivery method where the designer and builder work together under a single contract from the beginning of the project in order to ensure unity and collaboration throughout the process. - Correct A...
-
BOMI - Design and Op I Key Concepts Chapters 1-8 Questions And Answers With Verified Solutions
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
0-20 DB Sound Level - Loudness: Very Faint 
Source: Whisper (5) 
100-200 DB Sound Level - Loudness: Deafening 
Source: Generator (5) 
20-40 DB Sound Level - Loudness: Faint 
Source: Quiet Conversation (5) 
4 Primary Project Delivery Methods - - Design Bid Build 
- Design Build 
- CMAR 
- Multiple Prime Contracts (2) 
4 Types of Shifting - Settlement, Upheaval, Sliding, Liquefaction. (4) 
40-60 DB Sound Level - Loudness: Moderate 
Source: Average Conversation (5) 
60-80 DB Sound Level - Loudness:...