Generators operating - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Generators operating? On this page you'll find 618 study documents about Generators operating.
Page 2 out of 618 results
Sort by
-
PJM Sample Test Review Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $12.39
- + learn more
Real time transmission constraints or contingencies may be alleviated with generators 
operating ______________ 
: off cost out of merit. 
Monitoring ___________ may give insights into system constraints. 
: Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line schedules are 
maintained. 
: PJM calls on synchronized reserves 
If not cancelled by PJM, the minimum generation alert expires at the end of the 
specified ______________. 
: light load period 
2 | P ...
-
PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO 
: TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental 
: Quick-start (hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? 
: 20 MVA 
Minimum MVARs for an aggregate of generators that is required to do reactive testing? 
: 75 MVA 
Power transformer is connected to the g...
-
Inspector Chapter 14 Questions and Answers Already Passed
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Inspector Chapter 14 Questions and 
 
Answers Already Passed 
 
Inspectors should check the FACU to verify: 
Select one: 
 
a. component age. 
b. components are not blocked or obstructed in any way. 
c. changes in occupancy. 
d. all parts are operating properly. D 
 
Multistory facilities should have at least _____ pull station(s) on each floor. 
Select one: 
 
a. 3 
b. 2 
c. 4 
 
d. 1 D 
 
Automatic alarm-initiating devices are more commonly known as: 
Select one: 
 
a. detectors. 
 
b. alarms....
-
PJM Generation Operation Exam 2024 with Verified Solutions
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
PJM Generation Operation Exam 2024 
 
with Verified Solutions 
 
Control center facilities must have a minimum of how many days of fuel for the backup 
generator? 5 days 
 
If PJM ACE shows overgeneration, actual imports are: Less than scheduled 
 
Who should a generator contact at PJM to clear an outage ticket? Master Coordinator 
 
To correct for a slow or fast clock, system frequency schedules are offset by: +/-.02 Hz 
 
What frequency would PJM set to correct for fast-time error? 59.98Hz 
 
...
-
LOG104 Reliability, Availability, and Maintainability (RAM) : LESSON 1; Questions & Answers 100% Verified
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
LOG104 Reliability, Availability, and Maintainability 
(RAM) : LESSON 1; Questions & Answers 100% Verified 
In addition to probability, which of the following are also elements in the measurement of 
reliability? 
Select the three alternatives that apply. Answer-1.** Performance 
2.** Time 
3.*** Operating Conditions2 
Using the data from the truck example, calculate the generators' MTBR (for-cause). After two 
years, the fleet had accumulated 1,000,000 operating hours. There were 100 incide...
As you read this, a fellow student has made another $4.70
-
PJM Generation Dispatcher Sample Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Real time transmission constraints or contingencies may be alleviated with generators 
operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) 
: D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. system voltage 
C. system frefuency 
D. time error 
: A. system constraints 
2 | P a g e 
PJM calls for which of the following to recover the ACE so that tie line schedules are 
maintained ? 
A. IRC ( i...
-
P98 Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED A+)
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
P98 Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED) Fuel-oil is generally used in buildings in stationary equipment for two purposes - Correct 
Answer-fuel emergency generators or to fuel equipment used to heat the building. 
the person supervising the Fuel-Oil Transfer in the Building from one floor to another 
must hold - Correct Answer-P-98 Certificate of Fitness. Certificate of Fitness holders 
must maintain all qualifications and comply with all requirements appl...
-
FF1 Final Exam Study Guide IFSTA Questions and Answers 100% Pass
- Exam (elaborations) • 100 pages • 2024
-
- $13.49
- + learn more
FF1 Final Exam Study Guide IFSTA 
Questions and Answers 100% Pass 
A(An) _____ concept allows all responders to use a similar, coordinated approach with 
a common set of authorities, protections, and resources. - Answer- all hazard 
Which duty is a Fire Fighter I expected to perform? - Answer- Forcing entry into a 
structure 
Which statement describes the difference in the roles of a Fire Fighter I and a Fire 
Fighter II? - Answer- A Fire Fighter I works under the direct supervision of a Fire Fi...
-
Photovoltaic Final Exam Questions And All Correct Answers.
- Exam (elaborations) • 11 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
A photovoltaic cell or device converts sunlight to ___ - Answer DC electrical energy 
 
PV systems operating in parallel with the electric utility system are commonly referred to as ___ systems - Answer interactive 
 
PV systems operating independently of other power systems are commonly referred to as ___ systems - Answer stand alone 
 
photovoltaic applications for spacecraft, remoted power and portable equipment would be considered what type of systems? - Answer stand alone 
 
Whi...
-
Fire apparatus Driver/Operator-Pumper Total force questions and answers
- Exam (elaborations) • 4 pages • 2023
-
Available in package deal
-
- $10.49
- 1x sold
- + learn more
3 items that must have occurred prior to raising the cab correct answer: -All loose items in cab secured 
-All cab doors securely closed 
-Adequate front and overhead clearance 
 
2 true statements about inverters correct answer: - inverters output is limited to less than 1,500 watts 
- Inverters are quiet compared to generators. 
 
3 expectations to the rule that all Personnel should be seated and wearing seatbelts before an emergency vehicle begins moving. correct answer: -loading the hose ...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia