Heat anticipator - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Heat anticipator? On this page you'll find 179 study documents about Heat anticipator.

Page 2 out of 179 results

Sort by

HVAC NATE Heat Pump Exam Questions and Answers 100% Pass
  • HVAC NATE Heat Pump Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 19 pages • 2024
  • HVAC NATE Heat Pump Exam Questions and Answers 100% Pass On an R-22 system, line diameters and lengths are typically specified for a vapor pressure drop that does not exceed what? -Answer-6-7PSI or 6F What is the primary purpose of using flux when soldering copper or brass parts? - Answer-Prevent Oxidation The water that results from a defrost cycle of an air to air heat pump(runoff) must? - Answer-Drain off and away from the outdoor coil. Why must the runoff be drained off and away from...
    (0)
  • $12.49
  • + learn more
Esco Heating 208 Questions & 100% Verified  Answers | Latest Update | Already Graded A+
  • Esco Heating 208 Questions & 100% Verified Answers | Latest Update | Already Graded A+

  • Exam (elaborations) • 34 pages • 2024
  • Available in package deal
  • 1. A gas furnace is to be installed in a garage. The burners and ignition sources must be located ______ above the floor. A: 6 inches B: 12 inches C: 18 inches D: 24 inches : C: 18 inches 2. A good description of how hi-metai fan switch operates the blower motor on a gas furnace is: A: temperature on - time off. B: temperature on - time on. C: temperature on- temperature off. D: time on - time off. : C: temperature on- temperature off 3. Redundant gas valves used on gas furnaces ...
    (0)
  • $13.99
  • + learn more
Gas Technician G2 License Exam  Questions And Answers
  • Gas Technician G2 License Exam Questions And Answers

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • Gas Technician G2 License Exam Questions And Answers An inline Ammeter is connected - ANS In series with the device being checked As the length of an Electrical run increases, it may be necessary to - ANS Increase the Wire Size Fuses serving motor circuits should be of - ANS Time Delay Type Millivolt wiring should be isolated from Line Voltage Wiring because - ANS The Line Voltage will induce a voltage into the Millivolt Wiring Which tool is used to determine...
    (0)
  • $12.49
  • + learn more
Practice Exam for NATE Heat Pump Final  Questions and Answers
  • Practice Exam for NATE Heat Pump Final Questions and Answers

  • Exam (elaborations) • 11 pages • 2024
  • Practice Exam for NATE Heat Pump Final Questions and Answers R-22 vapor line diameters and lengths are typically specified for a... - CORRECT ANSWER-Vapor pressure drop that does not exceed a 6-7psi or 6 degrees F The primary purpose of using flux when soldering copper or brass parts is... - CORRECT ANSWER-To prevent oxidation The water that results from a defrost cycle of an air to air heat pump(runoff) must... - CORRECT ANSWER-Drain off and away fro the outdoor coil to prevent excessi...
    (0)
  • $13.49
  • + learn more
HVAC NATE Heat Pump /171 Questions with Correct Answers Assured A+.
  • HVAC NATE Heat Pump /171 Questions with Correct Answers Assured A+.

  • Exam (elaborations) • 19 pages • 2023
  • HVAC NATE Heat Pump /171 Questions with Correct Answers Assured A+. On an R-22 system, line diameters and lengths are typically specified for a vapor pressure drop that does not exceed what? -Ans 6-7PSI or 6F What is the primary purpose of using flux when soldering copper or brass parts? -Ans Prevent Oxidation The water that results from a defrost cycle of an air to air heat pump(runoff) must? -Ans Drain off and away from the outdoor coil. Why must the runoff be drained off and away from ...
    (0)
  • $11.49
  • + learn more
NATE Air Conditioning and Heat Pump Exam Questions and Answers Updated 2024/2025 (GRADED)
  • NATE Air Conditioning and Heat Pump Exam Questions and Answers Updated 2024/2025 (GRADED)

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • NATE Air Conditioning and Heat Pump Exam Questions and Answers Updated 2024/2025 (GRADED) The combined output of a heatpump and its auxiliary heat should not exceed the calculated heat loss of a home by more than ____%. - ANSWER-15% What amount of auxiliary electronic heat is needed when the output of a heat pump on a design day equals 18,800 Btuh and the heat loss of a home is 29,700 Btuh? - ANSWER-3.2 kWh The three processes that transfer heat energy are conduction, convection, and _____...
    (0)
  • $15.99
  • + learn more
Esco Heating 208 Exam Questions and Answers
  • Esco Heating 208 Exam Questions and Answers

  • Exam (elaborations) • 23 pages • 2023
  • Available in package deal
  • Esco Heating 208 Exam Questions and Answers 1. A gas furnace is to be installed in a garage. The burners and ignition sources must be located ______ above the floor. A: 6 inches B: 12 inches C: 18 inches D: 24 inches - ANS ️️ C: 18 inches 2. A good description of how hi-metai fan switch operates the blower motor on a gas furnace is: A: temperature on - time off. B: temperature on - time on. C: temperature on- temperature off. D: time on - time off. - ANS ️️ C: temperature on-...
    (0)
  • $12.49
  • + learn more
HVAC NATE Heat Pump Exam Questions With Correct Answers Updated 2024/2025 (Graded A+)
  • HVAC NATE Heat Pump Exam Questions With Correct Answers Updated 2024/2025 (Graded A+)

  • Exam (elaborations) • 19 pages • 2024
  • HVAC NATE Heat Pump Exam Questions With Correct Answers Updated 2024/2025 (Graded A+) What is the primary purpose of using flux when soldering copper or brass parts? -Ans Prevent Oxidation The water that results from a defrost cycle of an air to air heat pump(runoff) must? -Ans Drain off and away from the outdoor coil. Why must the runoff be drained off and away from the outdoor coil? -AnsExcessive ice can build up on the bottom of the coil and can reduce capacity. What is the component th...
    (0)
  • $17.49
  • + learn more
Electric Heat ESCO - HVAC Excellence Exam || with 100% Correct Answers.
  • Electric Heat ESCO - HVAC Excellence Exam || with 100% Correct Answers.

  • Exam (elaborations) • 7 pages • 2024
  • Before working on an electric furnace the tech should correct answers Review diagram, remove jewelry, and follow safety procedures. ALL OF THE ABOVE. A GFCI circuit breaker correct answers detects current leaks to groound the conductor in an electric heat element is usually made of correct answers Nichrome An example of resistive load is correct answers crankcase heater an example of an inductive load is correct answers motor an electric furnace is marked 208/230 single phase 60Hz...
    (0)
  • $11.39
  • + learn more
NATE Air Conditioning and Heat Pump Exam Questions and Answers Updated 2024-2025 (GRADED A+)
  • NATE Air Conditioning and Heat Pump Exam Questions and Answers Updated 2024-2025 (GRADED A+)

  • Exam (elaborations) • 15 pages • 2024
  • NATE Air Conditioning and Heat Pump Exam Questions and Answers Updated (GRADED A+) The maximum sensible cooling capacity of a heat pump should be within ______% of the calculated sensible heat gain of a structure with a large heating load. - ANSWER- +25% The combined output of a heatpump and its auxiliary heat should not exceed the calculated heat loss of a home by more than ____%. - ANSWER-15% What amount of auxiliary electronic heat is needed when the output of a heat pump on a design d...
    (0)
  • $17.49
  • + learn more