High frequency generators - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about High frequency generators? On this page you'll find 308 study documents about High frequency generators.

Page 2 out of 308 results

Sort by

NERC SOS Quiz Questions and Answers 100% Accurate
  • NERC SOS Quiz Questions and Answers 100% Accurate

  • Exam (elaborations) • 34 pages • 2023
  • Available in package deal
  • NERC SOS Quiz Questions and Answers 100% Accurate NERC SOS Quiz Questions and Answers 100% Accurate NERC SOS Quiz Questions and Answers 100% Accurate If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? - ANSWER-Regulation of other services related to control performance 1. It is the obligation of each Balancing Authority to fulfill its c...
    (0)
  • $12.99
  • + learn more
NERC SOS | 326 questions Rated 100% Correct!!
  • NERC SOS | 326 questions Rated 100% Correct!!

  • Exam (elaborations) • 41 pages • 2023
  • Available in package deal
  • If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? - Regulation of other services related to control performance 1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection - Burden A Balancing Authority is performing Overlap Regulati...
    (0)
  • $16.49
  • + learn more
PJM Generation Operation Exam 2024 Questions and Answers
  • PJM Generation Operation Exam 2024 Questions and Answers

  • Exam (elaborations) • 8 pages • 2024
    (0)
  • $12.49
  • + learn more
Short questions and answers  EE1251 Electrical Machines II
  • Short questions and answers EE1251 Electrical Machines II

  • Exam (elaborations) • 16 pages • 2024
  • Short questions and answers EE1251 Electrical Machines II 1. Why almost all large size Synchronous machines are constructed with rotating field system type? The following are the principal advantages of the rotating field system type construction of Synchronous machines: • The relatively small amount of power, about 2%, required for field system via slip-rings and brushes. • For the same air gap dimensions, which is normally decided by the kVA rating, more space is availabl...
    (0)
  • $17.99
  • + learn more
PJM Generation Operation Exam - Questions and Answers
  • PJM Generation Operation Exam - Questions and Answers

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • PJM Generation Operation Exam - Questions and Answers Control center facilities must have a minimum of how many days of fuel for the backup generator? 5 days If PJM ACE shows overgeneration, actual imports are: Less than scheduled Who should a generator contact at PJM to clear an outage ticket? Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: +/-.02 Hz What frequency would PJM set to correct for fast-time error? 59.98Hz What frequency would PJM ...
    (0)
  • $13.49
  • + learn more
PJM Generation Operation Exam 2024 Questions with Correct Answers
  • PJM Generation Operation Exam 2024 Questions with Correct Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • PJM Generation Operation Exam 2024 Questions with Correct Answers Control center facilities must have a minimum of how many days of fuel for the backup generator? - Correct Answer 5 days If PJM ACE shows overgeneration, actual imports are: - Correct Answer Less than scheduled Who should a generator contact at PJM to clear an outage ticket? - Correct Answer Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: - Correct Answer +/-.02 Hz Wha...
    (0)
  • $9.99
  • + learn more
 NERC Additional Test Questions With Correct Answers
  • NERC Additional Test Questions With Correct Answers

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • 1. Balancing Authority A is importing MW and has a tie-Iine flowing into them when the meter fails to zero. Which of the following statements is true? A) The Balancing Authority's frequency will drop B) The Balancing Authority's generators on AGC will decrease output C) The Balancing Authority's frequency will increase D) The Balancing Authority's ACE reading will decrease - Answer B) The Balancing Authority's generators on AGC will decrease output 2. Balancing Authority A has tie-li...
    (0)
  • $10.99
  • + learn more
NERC Certification Practice Questions and Answers (Already GRADED A)
  • NERC Certification Practice Questions and Answers (Already GRADED A)

  • Exam (elaborations) • 13 pages • 2023
  • A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Area...
    (0)
  • $9.99
  • + learn more
NERC book quiz Questions and Answers (100% Correct Elaborations)
  • NERC book quiz Questions and Answers (100% Correct Elaborations)

  • Exam (elaborations) • 29 pages • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? -4MW Net actual interchange minus Net scheduled interchange is what? Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
    (0)
  • $10.49
  • + learn more
NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)
  • NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)

  • Exam (elaborations) • 73 pages • 2023
  • 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of the fo...
    (0)
  • $11.49
  • + learn more