Hoist up raise load - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Hoist up raise load? On this page you'll find 238 study documents about Hoist up raise load.
Page 2 out of 238 results
Sort by
-
Hoisting Hand Signals Exam Questions With Complete Solutions (Verified And Updated)
- Exam (elaborations) • 11 pages • 2024
-
- $10.49
- + learn more
Hoisting Hand Signals Exam Questions With 
Complete Solutions (Verified And Updated) 
Hoist 
(Crane) - answerwith forearm vertical, forefinger pointing up, move hand in small horizontal 
circle 
Lower 
(Crane) - answerWith arm extended downward, forefinger pointing down, move hand in 
small horizontal circle 
Use Main Hoist 
(Crane) - answerTap fist on head; then use regular signals 
Raise Boom 
(Crane) - answerArm extended, fingers closed, thumb pointing upward 
Use Whipline (Auxiliary Hoist) 
...
-
Mechanics Exam Review – NEIEP | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 21 pages • 2024
-
- $12.49
- + learn more
A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What 
is required? - 100 fpm/125 fpm= 12"/ X =15 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What 
should you do? - Replace it with a larger MOV - 630 
On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the brake. What is the 
issue? - Suicide Circuit - 425 
You have an old DC motor and are adding an SCR drive, wh...
-
Mechanics Exam Review – NEIEP | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 21 pages • 2024
-
- $12.49
- + learn more
A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What 
is required? - 100 fpm/125 fpm= 12"/ X =15 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What 
should you do? - Replace it with a larger MOV - 630 
On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the brake. What is the 
issue? - Suicide Circuit - 425 
You have an old DC motor and are adding an SCR drive, wh...
-
NCCCO PT Questions with 100% Verified Correct Answers 2024/2025
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
NCCCO PT Questions with 100% Verified Correct Answers 2024/2025 
Which unsafe condition could result when a wedge socket is attached directly to a load hook, using 6x19 IWRC? 
(A) Spinning of the load (B) Decreased line pull (C) Decreased safe working load (D) Structural failure - Correct Answers (A) Spinning of the load 
 
Which if the following will indicates intemal damage or ultimately core failure in rotation- resistant rope? 
(A) Strand bird caging (B) Dianeter reduction (C) Excessive lu...
-
Category 3 Non-Cab Operated Crane Safety Questions And Answers Updated 2024/2025 | 100% Verified.
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $17.99
- + learn more
Category 3 Non-Cab Operated Crane Safety Questions And Answers Updated 2024/2025 | 100% Verified. A floating crane with a capacity of 200,000lbs. is a 
crane.: Category 1 
2. What is the category of a jib crane with a capacity of less than 20,000 
pounds?: Category 3 
3. An OET, Bridge crane with a capacity of 80,000lbs. is a 
crane.: Category 2 
4. A commercial truck mounted crane with a capacity of 14,000 lbs. is a 
 crane.: category 4 
5. What types of power does a Category 1 or 4 crane gener...
Want to regain your expenses?
-
Elevator Mechanic Exam Review question n answers
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $17.99
- + learn more
Elevator Mechanic Exam ReviewA contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. What sheave is required? - correct answer Diam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 12"+3"= 15" sheave 
 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - correct answer Replace it with a larger MOV 
 
On a Ward-Leonard circuit the break is set, but the motor is trying to slip through the break. Wha...
-
Elevator Mechanic Exam Review 2024/2025 questions and answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $19.99
- + learn more
Elevator Mechanic Exam ReviewA contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. What sheave is required? - correct answer Diam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 12"+3"= 15" sheave 
 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - correct answer Replace it with a larger MOV 
 
On a Ward-Leonard circuit the break is set, but the motor is trying to slip through the break. Wha...
-
Crane Course Questions and Answers Graded A+
- Exam (elaborations) • 20 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
Crane Course Questions and Answers Graded A+ 
According to OSHA, when traveling a crane at a jobsite with no load under or near power lines, a spotter is required if any part of the crane will get closer than? 
20 feet 
 
 
 
Within what percentage of level does a telescopic boom crane have to be for the gross ratings in the load chart to remain valid? 
1% 
 
 
 
 
Brainpower 
Read More 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
0:04 
/ 
0:15 
Full screen 
which o...
-
Category 3 Non-Cab Operated Crane Safety Questions And Answers Updated 2024/2025 (100% Verified)
- Exam (elaborations) • 16 pages • 2024
-
Available in package deal
-
- $15.49
- + learn more
Category 3 Non-Cab Operated Crane Safety Questions And Answers Updated 2024/2025 (100% Verified) A floating crane with a capacity of 200,000lbs. is a 
crane.: Category 1 
2. What is the category of a jib crane with a capacity of less than 20,000 
pounds?: Category 3 
3. An OET, Bridge crane with a capacity of 80,000lbs. is a 
crane.: Category 2 
4. A commercial truck mounted crane with a capacity of 14,000 lbs. is a 
 crane.: category 4 
5. What types of power does a Category 1 or 4 crane genera...
-
NEIEP 200 Final Exam Questions & Answers Latest Updated 2024/2025 (100% VERIFIED)
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $18.49
- + learn more
NEIEP 200 Final Exam Questions & Answers Latest Updated 2024/2025 (100% VERIFIED) you are using a plumb line to check a rail for plumb. you find that at the top 
it measures 1" and at the bottom it measures 1 1/4". what does this tell 
you? 
(Ansa. the top of the rail needs to go towards the center 
b. the top of the rail needs to go toward the wall 
c. the bottom of the rail needs to go toward the wall 
you are plumbing rails on a high rise installation. what type of plumb line 
should you us...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia