Installer 101 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Installer 101? On this page you'll find 25 study documents about Installer 101.

Page 2 out of 25 results

Sort by

CHC NFPA CODES WITH COMPLETE SOLUTIONS.
  • CHC NFPA CODES WITH COMPLETE SOLUTIONS.

  • Exam (elaborations) • 2 pages • 2023
  • What dose it govern NFPA 10 Standard for Portable Fire Extinguishers What dose it govern NFPA 13 Standard for the Installation of Sprinkler Systems What dose it govern NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems What dose it govern NFPA 70 National Electrical Code (NEC) What dose it govern NFPA 72 National Fire Alarm and Signaling Code What dose it govern NFPA 80 Standard for Fire Doors and Other Opening Prot...
    (0)
  • $13.49
  • + learn more
NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (GRADED)
  • NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (GRADED)

  • Exam (elaborations) • 21 pages • 2024
  • NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (GRADED) 1 The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - Answer - 10%. HP Code: 14-9.12 3 Who oversees the code for any plumbing installations? - Answer - The NYC Plumbing Code NYC Mech: 1002.1 4 When will anchorage or guides be inspected? - Answer - Annually. NYC Mech: 1210.3.1.2 5 How many brass washout p...
    (0)
  • $15.49
  • + learn more
NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS, LATEST UPDATED 2024/2025 (GRADED)
  • NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS, LATEST UPDATED 2024/2025 (GRADED)

  • Exam (elaborations) • 21 pages • 2024
  • NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS, LATEST UPDATED 2024/2025 (GRADED) The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - Answer - 10%. HP Code: 14-9.12 3 Who oversees the code for any plumbing installations? - Answer - The NYC Plumbing Code NYC Mech: 1002.1 4 When will anchorage or guides be inspected? - Answer - Annually. NYC Mech: 1210.3.1.2 5 How many brass washout pl...
    (0)
  • $15.49
  • + learn more
NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (GRADED)
  • NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (GRADED)

  • Exam (elaborations) • 21 pages • 2024
  • 1 The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - Answer - 10%. HP Code: 14-9.12 3 Who oversees the code for any plumbing installations? - Answer - The NYC Plumbing Code NYC Mech: 1002.1 4 When will anchorage or guides be inspected? - Answer - Annually. NYC Mech: 1210.3.1.2 5 How many brass washout plugs does a miniature boiler have? - Answer - Not less than 3 Brass Washout Plugs 1 ...
    (0)
  • $15.49
  • + learn more
CHC Study Set Questions with correct Answers
  • CHC Study Set Questions with correct Answers

  • Exam (elaborations) • 16 pages • 2023
  • What does CHC stand for? - Answer- Certified Health Care Constructor What are the 4 types of Exam Questions? - Answer- Health Care Industry Fundamentals, PDC Process, Health Care Facility Safety, Financial Stewardship Name 5 Trends in Health Care - Answer- Changing Regulations; Services offered; Construction; Length of stay; Finance; Patient flow and efficiency; Name the 5 types of Health Care Facilities - Answer- Hospital; Outpatient facilities; Medical office building; El...
    (0)
  • $12.49
  • + learn more
UST certification exam 2023 -Solved
  • UST certification exam 2023 -Solved

  • Exam (elaborations) • 6 pages • 2023
  • site check - ANSWER-the investigation of an UST site for the presence of a release when evidence indicates that a release may have occurred, but existence is not confirmed site assessment - ANSWER-an investigation to determine if a release has occurred what situations require a site check? - ANSWER-1. contamination from regulated substance discovered at UST site that is not permanently closed (discovery of regulated substance or its constituents) 2. if contamination is discovered off-sit...
    (0)
  • $10.99
  • + learn more
NATE CORE POSSIBLE  QUESTIONS AND ANSWERS 2022/2023 |GRADED A
  • NATE CORE POSSIBLE QUESTIONS AND ANSWERS 2022/2023 |GRADED A

  • Exam (elaborations) • 47 pages • 2022
  • An air conditioning technician is working in the basement of a large B37public building. The technician notices several unsafe and dangerous conditions. Of the following conditions that are noticed, which is the most dangerous and should be reported immediately? A: Gas leaking from a cracked pipe B: An open sewer drain connection C: The basement is unlighted D: None of these are the technician's business A: Gas leaking from a cracked pipe A service technician is returning h...
    (0)
  • $17.99
  • + learn more
NATE Exam: Air Conditioning and Heat Pumps, questions with complete top solutions
  • NATE Exam: Air Conditioning and Heat Pumps, questions with complete top solutions

  • Exam (elaborations) • 19 pages • 2023
  • NATE Exam: Air Conditioning and Heat Pumps, questions with complete top solutions Which of the following factors affects a customer's level of comfort? a. Air movement b. Humidity c. Temperature d. All of the above d (All of the above: air movement, humidity, temperature) A cooling load calculation estimates the sensible heat gain of a structure. The maximum sensible capacity of a cooling-only system should be within ____% of this calculated value. a. ±10% b. +10% c. +15% ...
    (0)
  • $20.49
  • + learn more