Leed ap bdc - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Leed ap bdc? On this page you'll find 48 study documents about Leed ap bdc.
Page 2 out of 48 results
Sort by
-
LEED AP BD+C Exam 3 |Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 29 pages • 2024
-
- $13.49
- + learn more
List the eight LEED BD+C adaptations an exam candidate must know - ANSWER New 
construction and major renovations, 
core and shell development 
schools 
retail 
data centers 
warehouses and distribution centers 
hospitality 
healthcare 
LEED Rating System - ANSWER Building Design and Construction 
Interior Design and Construction 
Building O&M 
Neighborhood Development 
Home
-
LEED AP BD+C UPDATED Exam Questions and CORRECT Answer
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $8.99
- + learn more
List the eight LEED BD+C adaptations an exam candidate must know - New 
construction and major renovations, 
core and shell development 
schools 
retail 
data centers 
warehouses and distribution centers 
hospitality 
healthcare
-
LEED AP BD+C TOP Exam Guide Questions and CORRECT Answers
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $8.99
- + learn more
What must your erosion control plan adhere to? - 2003 EPA Construction General 
Permit (or local standards, whichever is more stringent) 
What is a Phase I Environmental Site Assessment? - A report prepared for a real estate 
holding that identifies potential or existing environmental contamination liabilities 
How is a Phase II Environmental Site Assessment more in depth? - A further 
investigation that collects original samples of soil, groundwater, or building materials to 
analyze for qu...
-
LEED AP BD+C Practice Questions with 100% Correct Answers
- Exam (elaborations) • 25 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
What are the 8 LEED AP BD+C adaptations? Correct Answer New Construction and Major Renovations 
Core and Shell Development 
Schools 
Retail 
Data Centers 
Warehouses and Dist. Centers 
Hoslitality 
Healthcare 
 
What are the 8 LEED AP BD+C adaptations? Correct Answer New Construction and Major Renovations 
Core and Shell Development 
Schools 
Retail 
Data Centers 
Warehouses and Dist. Centers 
Hospitality 
Healthcare 
 
Required LEED strategies are called ____ and optional LEED strategies are ca...
-
LEED AP BD+C Exam 2024| Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 23 pages • 2024
-
- $13.19
- + learn more
What must your erosion control plan adhere to? - ANSWER 2003 EPA Construction General 
Permit (or local standards, whichever is more stringent) 
What is a Phase I Environmental Site Assessment? - ANSWER A report prepared for a real estate 
holding that identifies potential or existing environmental contamination liabilities 
How is a Phase II Environmental Site Assessment more in depth? - ANSWER A further 
investigation that collects original samples of soil, groundwater, or building materials t...
Get paid weekly? You can!
-
LEED AP BD+C Practice Exam Pool E 2024 Questions and Answers 100% Verified
- Exam (elaborations) • 23 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
LEED AP BD+C Practice Exam Pool E 2024 Questions and Answers 100% Verified
-
LEED v4 AP BD+C Practice Test -1 2024 Questions and Answers 100% Verified
- Exam (elaborations) • 73 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
LEED v4 AP BD+C Practice Test -1 2024 Questions and Answers 100% Verified
-
LEED AP BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 29 pages • 2024
-
- $13.49
- + learn more
The project ________ process is designed to allow project teams to obtain technical guidance 
on how LEED requirements, including MPRs, prererqs and credits pertain to their projects. - 
ANSWER credit interpretation ruling process 
3.15 
________ are precedent setting official answers to formal technical inquiries about 
implementing LEED on a project. - ANSWER LEED interpretations - are published to USGBC 
3.16 
___________ incorporate changes and improvements to LEED rating systems and referen...
-
LEED AP BD+C STUDY EXAM 1 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 13 pages • 2024
-
- $15.49
- + learn more
Which of the following factors influence the recycling efforts within buildings? 
 
A) Lack of education 
B) Non-availability of recycling programs in town 
C) ignorance about recycling 
D) lack of convenient, physical spaces for recycling - correct answer D) lack of convenient, physical spaces for recycling 
 
A project team for a school project will reuse the shell of an existing building and recycle the rest of the construction and demolition debris. Which of the following MR credits will thi...
-
LEED BD+C AP Exam 2024 Updated Questions And Advanced Correct Answers.
- Exam (elaborations) • 36 pages • 2024
-
- $13.99
- + learn more
(MR Credit) Building Product Disclosure and Optimization- Environmental Product Declarations - Opt. 2 Multi-Attribute Optimization. Exemplary Performance requirements? - correct answer Option 1. Source at least 40 qualifying products from five manufacturers. 
Option 2. Purchase 75%, by cost, of permanently installed building products that meet the required attributes 
 
What must be true of EPDs to qualify for MR Credit Building Product Disclosure and Optimization EPD? - correct...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia