Leed bdc ap exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Leed bdc ap exam? On this page you'll find 28 study documents about Leed bdc ap exam.
Page 2 out of 28 results
Sort by
-
LEED AP BD+C Practice Exam Pool E 2024 Questions and Answers 100% Verified
- Exam (elaborations) • 23 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
LEED AP BD+C Practice Exam Pool E 2024 Questions and Answers 100% Verified
-
LEED AP BD+C Exam 2024| Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 23 pages • 2024
-
- $13.19
- + learn more
What must your erosion control plan adhere to? - ANSWER 2003 EPA Construction General 
Permit (or local standards, whichever is more stringent) 
What is a Phase I Environmental Site Assessment? - ANSWER A report prepared for a real estate 
holding that identifies potential or existing environmental contamination liabilities 
How is a Phase II Environmental Site Assessment more in depth? - ANSWER A further 
investigation that collects original samples of soil, groundwater, or building materials t...
-
LEED AP BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 29 pages • 2024
-
- $13.49
- + learn more
The project ________ process is designed to allow project teams to obtain technical guidance 
on how LEED requirements, including MPRs, prererqs and credits pertain to their projects. - 
ANSWER credit interpretation ruling process 
3.15 
________ are precedent setting official answers to formal technical inquiries about 
implementing LEED on a project. - ANSWER LEED interpretations - are published to USGBC 
3.16 
___________ incorporate changes and improvements to LEED rating systems and referen...
-
LEED AP BD+C STUDY EXAM 1 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 13 pages • 2024
-
- $15.49
- + learn more
Which of the following factors influence the recycling efforts within buildings? 
 
A) Lack of education 
B) Non-availability of recycling programs in town 
C) ignorance about recycling 
D) lack of convenient, physical spaces for recycling - correct answer D) lack of convenient, physical spaces for recycling 
 
A project team for a school project will reuse the shell of an existing building and recycle the rest of the construction and demolition debris. Which of the following MR credits will thi...
-
LEED BD+C AP Exam 2024 Updated Questions And Advanced Correct Answers.
- Exam (elaborations) • 36 pages • 2024
-
- $13.99
- + learn more
(MR Credit) Building Product Disclosure and Optimization- Environmental Product Declarations - Opt. 2 Multi-Attribute Optimization. Exemplary Performance requirements? - correct answer Option 1. Source at least 40 qualifying products from five manufacturers. 
Option 2. Purchase 75%, by cost, of permanently installed building products that meet the required attributes 
 
What must be true of EPDs to qualify for MR Credit Building Product Disclosure and Optimization EPD? - correct...
Fear of missing out? Then don’t!
-
LEED AP BD+C v4 Exam Study Guide with complete solution
- Exam (elaborations) • 9 pages • 2024
-
- $10.49
- + learn more
LEED AP BD+C v4 Exam Study Guide with complete solution
-
LEED AP BD+C v4 Exam 2024 With 100% Correct Answers
- Exam (elaborations) • 12 pages • 2024
-
- $13.49
- + learn more
What does the acronym "LEED" stand for? - correct answer Leadership in Energy and Environmental Design 
 
What does the acronym "GBCI" stand for? - correct answer Green Business Certification Inc. 
 
Buildings are __________ and people are __________ - correct answer certified; credentialed 
 
What are the knowledge domains? - correct answer 1. LEED Process, 2. Integrative Strategies, 3. Location and Transportation, 4. Sustainable Sites, 5. Water Efficiency, 6. Energy and Atmosphere, 7. Mate...
-
LEED AP BD+C Study Exam 1| Questions and answers | Latest 2024/25
- Exam (elaborations) • 10 pages • 2024
-
- $11.49
- + learn more
LEED AP BD+C Study Exam 1| Questions and answers | Latest 2024/25
-
LEED AP BD+C EXAM |GUARANTEED PASS |ACCURATE
- Exam (elaborations) • 43 pages • 2024
-
- $15.99
- + learn more
What must your erosion control plan adhere to? - ACCURATE ANSWERS Erosion control plans must adhere to the 2003 EPA Construction General Permit (or local standards, whichever is more stringent). 
 
What is a Phase I Environmental Site Assessment? - ACCURATE ANSWERS A Phase I Environmental Site Assessment is a report prepared for a real estate holding that identifies potential or existing environmental contamination liabilities. 
 
How is a Phase II Environmental Site Assessment more in depth? - ...
-
LEED Green Associate V4 Exam Ch. 1 Questions with 100% Correct Answers | Verified | Latest Update
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
LEED Green Associate V4 Exam Ch. 1 Questions with 100% Correct Answers | Verified | Latest Update
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia