Leed bdc exam Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Leed bdc exam? On this page you'll find 41 study documents about Leed bdc exam.
Page 2 out of 41 results
Sort by
-
LEED AP BD+C Exam 3 |Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 29 pages • 2024
-
- $13.49
- + learn more
List the eight LEED BD+C adaptations an exam candidate must know - ANSWER New 
construction and major renovations, 
core and shell development 
schools 
retail 
data centers 
warehouses and distribution centers 
hospitality 
healthcare 
LEED Rating System - ANSWER Building Design and Construction 
Interior Design and Construction 
Building O&M 
Neighborhood Development 
Home
-
LEED BD+C Actual Exam |Questions and 100% Correct Answers| Latest Update
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
When calculating occupied areas in an area of a building, what spaces must be excluded? - 
ANSWER Underground or structured parking 
Mechanical spaces are included 
How do you calculate default occupancy counts for Core and Shell projects? - ANSWER Using 
gross floor area, not net or leasable floor area 
Are hotel guests visitors or regular occupants of the building? - ANSWER Regular occupants 
Can boats and mobile homes be certified under LEED? - ANSWER No. 
Pre-fab or modular structures may be...
-
LEED AP BD+C Exam 2024| Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 23 pages • 2024
-
- $13.19
- + learn more
What must your erosion control plan adhere to? - ANSWER 2003 EPA Construction General 
Permit (or local standards, whichever is more stringent) 
What is a Phase I Environmental Site Assessment? - ANSWER A report prepared for a real estate 
holding that identifies potential or existing environmental contamination liabilities 
How is a Phase II Environmental Site Assessment more in depth? - ANSWER A further 
investigation that collects original samples of soil, groundwater, or building materials t...
-
LEED AP BD+C Practice Exam Pool E 2024 Questions and Answers 100% Verified
- Exam (elaborations) • 23 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
LEED AP BD+C Practice Exam Pool E 2024 Questions and Answers 100% Verified
-
LEED AP BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 29 pages • 2024
-
- $13.49
- + learn more
The project ________ process is designed to allow project teams to obtain technical guidance 
on how LEED requirements, including MPRs, prererqs and credits pertain to their projects. - 
ANSWER credit interpretation ruling process 
3.15 
________ are precedent setting official answers to formal technical inquiries about 
implementing LEED on a project. - ANSWER LEED interpretations - are published to USGBC 
3.16 
___________ incorporate changes and improvements to LEED rating systems and referen...
And that's how you make extra money
-
LEED BD+C Exam 2024 Questions and Answers 100% Verified
- Exam (elaborations) • 32 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
LEED BD+C Exam 2024 Questions and Answers 100% Verified
-
LEED BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.19
- + learn more
When calculating occupied areas in an area of a building, what spaces must be excluded? - 
ANSWER Underground or structured parking 
Mechanical spaces are included 
How do you calculate default occupancy counts for Core and Shell projects? - ANSWER Using 
gross floor area, not net or leasable floor area 
Are hotel guests visitors or regular occupants of the building? - ANSWER Regular occupants 
Can boats and mobile homes be certified under LEED? - ANSWER No. 
Pre-fab or modular structures may be...
-
LEED BD+C Exam 2024| Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
A LEED AP is tasked with registering a 6-story, C&S office building with a retail store located on 
the first two floors. How should the LEED AP proceed with registering the project since there 
are two applicable rating system adaptations? - ANSWER The LEED AP should use the 40/60 
rule to choose the rating system that is appropriate for 60% or more of the LEED Project 
Which one of the following projects meets the MPRs and can pursue LEED certification? 
A. A temporary construction trailer 
B....
-
LEED BD+C AP Exam 2024 Updated Questions And Advanced Correct Answers.
- Exam (elaborations) • 36 pages • 2024
-
- $13.99
- + learn more
(MR Credit) Building Product Disclosure and Optimization- Environmental Product Declarations - Opt. 2 Multi-Attribute Optimization. Exemplary Performance requirements? - correct answer Option 1. Source at least 40 qualifying products from five manufacturers. 
Option 2. Purchase 75%, by cost, of permanently installed building products that meet the required attributes 
 
What must be true of EPDs to qualify for MR Credit Building Product Disclosure and Optimization EPD? - correct...
-
LEED AP BD+C STUDY EXAM 1 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 13 pages • 2024
-
- $15.49
- + learn more
Which of the following factors influence the recycling efforts within buildings? 
 
A) Lack of education 
B) Non-availability of recycling programs in town 
C) ignorance about recycling 
D) lack of convenient, physical spaces for recycling - correct answer D) lack of convenient, physical spaces for recycling 
 
A project team for a school project will reuse the shell of an existing building and recycle the rest of the construction and demolition debris. Which of the following MR credits will thi...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia