Mssc pre maintenance - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Mssc pre maintenance? On this page you'll find 37 study documents about Mssc pre maintenance.

Page 2 out of 37 results

Sort by

MSSC - PRE-MAINTENANCE AWARENESS ASSESSMENT #1 WITH 100% CORRECT ANSWERS 2023/24
  • MSSC - PRE-MAINTENANCE AWARENESS ASSESSMENT #1 WITH 100% CORRECT ANSWERS 2023/24

  • Exam (elaborations) • 8 pages • 2023
  • MSSC - PRE-MAINTENANCE AWARENESS ASSESSMENT #1 WITH 100% CORRECT ANSWERS 2023/24
    (0)
  • $14.99
  • + learn more
MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 1 WITH 100% CORRECT ANSWERS 2023 ALREADY GRADED A+
  • MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 1 WITH 100% CORRECT ANSWERS 2023 ALREADY GRADED A+

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • A burn or pungent odor of oil indicates excessive temperature A Chain should be replaced when its length becomes ______longer than the original length. 3 percent A common sign of a misaligned coupling is _____________. excessive vibration A multimeter is a multipurpose devise that can measure voltage, current, and resistance A power diagram is used in addition to a ladder diagram to determine_________. All of these (How the input functions on the machine, The seq...
    (0)
  • $14.49
  • + learn more
MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 2 WITH 100% CORRECT ANSWERS.
  • MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 2 WITH 100% CORRECT ANSWERS.

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • The 3 types of shafts to adjacent shaft power transmissions are _______ belt drive -- chain drive -- gear drive The proper place to lock out an electrical control system is at the__________ disconnect switch To _______________ workers should ALWAYS interrupt the power at the motor disconnect. perform lockout/tagout What agency suggests that a worker inspect and test all equipment, assuming all to be energized until proven energized? OSHA ____________ may remove a ...
    (0)
  • $13.99
  • + learn more
MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 2 WITH 100% CORRECT ANSWERS.
  • MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 2 WITH 100% CORRECT ANSWERS.

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • The 3 types of shafts to adjacent shaft power transmissions are _______ belt drive -- chain drive -- gear drive The proper place to lock out an electrical control system is at the__________ disconnect switch To _______________ workers should ALWAYS interrupt the power at the motor disconnect. perform lockout/tagout What agency suggests that a worker inspect and test all equipment, assuming all to be energized until proven energized? OSHA ____________ may remove a ...
    (0)
  • $13.99
  • + learn more
MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 2 WITH 100% CORRECT ANSWERS
  • MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 2 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 6 pages • 2023
  • MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 2 WITH 100% CORRECT ANSWERS
    (0)
  • $12.99
  • + learn more
MSSC QUESTIONS AND  VERIFIED SOLUTIONS
  • MSSC QUESTIONS AND VERIFIED SOLUTIONS

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • MSSC QUESTIONS AND VERIFIED SOLUTIONS Chain sag can be changed by __________ the sprockets. - ANSWER Moving A chain drive system has a driver sprocket with 72 teeth and a driven sprocket with 24 teeth. If the driver shaft has 1899 ft-lbs torque, the torque on the driven shaft will be __________. - ANSWER - 633 ft-lbs Chain drive torque is the same as the gear ratio, meaning that when torque increases the sprocket ratio __________. - ANSWER - Increases Misaligned chain drives can be v...
    (0)
  • $9.49
  • + learn more
MSSC - Pre-Maintenance Awareness Assessment #1 With Questions And 100% SURE ANSWERS
  • MSSC - Pre-Maintenance Awareness Assessment #1 With Questions And 100% SURE ANSWERS

  • Exam (elaborations) • 7 pages • 2024
  • MSSC - Pre-Maintenance Awareness Assessment #1 With Questions And 100% SURE ANSWERS
    (0)
  • $10.99
  • + learn more
A burn or pungent odor of oil indicates - excessive temperature MSSC CPT Maintenance Pre-Quiz Final Exercise A chain should be replaced when its length becomes longer than the original length. - 3% A common sign of a misaligned coupling is - excessive vib
  • A burn or pungent odor of oil indicates - excessive temperature MSSC CPT Maintenance Pre-Quiz Final Exercise A chain should be replaced when its length becomes longer than the original length. - 3% A common sign of a misaligned coupling is - excessive vib

  • Exam (elaborations) • 7 pages • 2023
  • A burn or pungent odor of oil indicates - excessive temperature MSSC CPT Maintenance Pre-Quiz Final Exercise A chain should be replaced when its length becomes longer than the original length. - 3% A common sign of a misaligned coupling is - excessive vibration A mustimeter is a multipurpose devise that can measure - voltage- current-resistance A power diagram is used in addition to a ladder diagram to determine - all of the above A power tool has the ground prong broken off of the plug on ...
    (0)
  • $13.99
  • + learn more
MSSC CPT Maintenance Pre-Quiz Final Exercise Correct 100%
  • MSSC CPT Maintenance Pre-Quiz Final Exercise Correct 100%

  • Exam (elaborations) • 7 pages • 2023
  • A chain should be replaced when its length becomes________ longer than the original length. - ANSWER 3% Daily maintenance involves daily records because - ANSWER recurring events can be analyzed to troubleshoot problems Prior to shutting down a machine for preventive maintenance, the operator MUST - ANSWER remove all the debris and any residue from the machine The best place for an operator to find information regarding the handling of all lubricants and safety precautions is in - ANSWE...
    (0)
  • $10.49
  • + learn more
MSSC CPT Maintenance Pre-Quiz Final Exercise Correctly Answered
  • MSSC CPT Maintenance Pre-Quiz Final Exercise Correctly Answered

  • Exam (elaborations) • 7 pages • 2023
  • A chain should be replaced when its length becomes________ longer than the original length. - ANSWER 3% Daily maintenance involves daily records because - ANSWER recurring events can be analyzed to troubleshoot problems Prior to shutting down a machine for preventive maintenance, the operator MUST - ANSWER remove all the debris and any residue from the machine The best place for an operator to find information regarding the handling of all lubricants and safety precautions is in - ANSWE...
    (0)
  • $9.99
  • + learn more