DBIA: Principles of Design-Build and Post Award & Contracts Questions And Answers Latest Updates
- Exam (elaborations) • 8 pages • 2024
-
- $7.99
- + learn more
The level of quality that any average Design Professional would be able to perform 
given the circumstances. - ️️Standard of Care 
Successful Design Build requires _____ & _______ between participants - ️️Trust, 
Flexibility 
Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation 
existed allowing Design-Build. - ️️Clinger Cohen Act/Defense Procurement Reform 
Act 1996 
Slowest Project Delivery method, linear in nature, prescriptive (owner knows wh...
-
DBIA: Principles of Design-Build and Post Award & Contracts Questions and Correct Answers the Latest Update and Recommended Version
- Exam (elaborations) • 17 pages • 2024
-
- $12.49
- + learn more
Federal Government passed bond requiring payment and performance bonds on all public 
works, what year? 
 Miller Act 1935 
Bill directing A/E's selected on qualifications, what year? 
 Brooks Bill 1972 
Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed 
allowing Design-Build. 
 Clinger Cohen Act/Defense Procurement Reform Act 1996 
The level of quality that any average Design Professional would be able to perform given the 
circumstances. 
 ...
-
DBIA Actual Test Questions And Answers With Verified Complete Solution.
- Exam (elaborations) • 10 pages • 2024
-
- $11.99
- + learn more
DBIA Actual Test Questions And Answers With Verified Complete Solution. 
Project Delivery System - Correct Answer-How team members are organized, 
establishes when parties engage, determines roles of parties, and determines sequence 
of design, procurement, and construction (db, cmar, dbb) 
Procurement Method - Correct Answer-how team members are selected (QBS, best 
value, low price, sole source) 
contracting approach - Correct Answer-how team members are paid (fp, gmp, cost 
reimbursement, tar...
-
DBIA Test Questions And Answers With 100% Correct Answers
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
a subjective measure for evaluating a project that is hard to measure; this is determined through the 
design process, not after the project is completed - design value 
describes in terms of exactly how the product and/or its components must be built; cookbook approach; 
developed by the design builder but used by owners in the RFP/bridging documents for operability or 
maintenance needs and conditions of permits or third parties; examples: uniformat C10, partitions. 
"Install gypsum wallboard...
-
DBIA Actual Test Questions And Answers With Verified Complete Solution.
- Exam (elaborations) • 10 pages • 2024
-
- $11.99
- + learn more
DBIA Actual Test Questions And Answers With Verified Complete Solution. 
Project Delivery System - Correct Answer-How team members are organized, 
establishes when parties engage, determines roles of parties, and determines sequence 
of design, procurement, and construction (db, cmar, dbb) 
Procurement Method - Correct Answer-how team members are selected (QBS, best 
value, low price, sole source) 
contracting approach - Correct Answer-how team members are paid (fp, gmp, cost 
reimbursement, tar...
And that's how you make extra money
-
DBIA Exam Study Guide with Complete solutions 100% Verified
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
DBIA Exam Study Guide with Complete solutions 100% Verified 
Federal Government passed bond requiring payment and performance bonds on all public works, what year? - Correct Answers Miller Act 1935 
 
Bill directing A/E's selected on qualifications, what year? - Correct Answers Brooks Bill 1972 
 
Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. - Correct Answers Clinger Cohen Act/Defense Procurement Reform Act 1996 
 
The...
-
NCARB PROJECT MANAGEMENT 2024 QUESTIONS WITH 100% CORRECT ANSWERS!!
- Exam (elaborations) • 15 pages • 2024
-
- $14.99
- + learn more
NCARB PROJECT MANAGEMENT 2024 QUESTIONS WITH 100% CORRECT ANSWERS!!
-
DBIA Test | 109 Questions and Answers(A+ Solution guide)
- Exam (elaborations) • 12 pages • 2023
- Available in package deal
-
- $8.39
- + learn more
Project Delivery System - How team members are organized, establishes when parties engage, 
determines roles of parties, and determines sequence of design, procurement, and construction (db, 
cmar, dbb) 
Procurement Method - how team members are selected (QBS, best value, low price, sole source) 
contracting approach - how team members are paid (fp, gmp, cost reimbursement, target price, 
unit price) 
Design-Bid-Build (DBB) - linear, sequential process, A/E selected on qualifications, GC selecte...
-
CDT Exam Questions With 100% Correct Answers 2024
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
CDT Exam Questions With 100% Correct 
Answers 2024 
Who is part of the project team? - answerOwner, Designer, Contractor, Supplier 
Responsibilities of the Owner - answerinitiates project and assumes risk 
Responsibilities of the Designer - answerplanning, reflects owner's vision, codes and 
regulations, construction documents, contract, QA/QC 
Responsibilities of the Contractor - answerestimates cost, time, manages construction 
Responsibilities of the Supplier - answerproduce equipment, produ...
-
DBIA Exam Latest(2024/2025) Updated Questions and Answers with complete solutions.
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
Provides baseline budgets and schedules and list estimate trends - Trend logs 
Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing 
incremental packages. - Design Build 
Bill directing A/E's selected on qualifications, what year? - Brooks Bill 1972 
Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing 
Design-Build. - Clinger Cohen Act/Defense Procurement Reform Act 1996 
The level of quali...