Nccco 6 exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nccco 6 exam? On this page you'll find 72 study documents about Nccco 6 exam.
Page 2 out of 72 results
Sort by
-
NCCCO MOBILE CRANE / NCCCO MOBILE CRANE EXAM 2023- 2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS VERIFIED ANSWERS GRADED A+
- Exam (elaborations) • 29 pages • 2024
-
- $22.99
- + learn more
NCCCO MOBILE CRANE / NCCCO 
MOBILE CRANE EXAM 2023- 
2024 ACTUAL EXAM 100 
QUESTIONS AND CORRECT 
DETAILED ANSWERS VERIFIED 
ANSWERS GRADED A+ 
1. What action does a signal person intend the operator to 
perform if he extends his arm at shoulder height, makes a 
fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - ANSWER-c. 
2. When hoisting personnel, within what percentage of level 
must a telescopic boom crane be in order for the gro...
-
NCCCO CORE EXAM QUESTIONS WITH COMPLETE SOLUTIONS 2024/2025
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NCCCO CORE EXAM QUESTIONS WITH COMPLETE SOLUTIONS 2024/2025 
Before leveling a mobile crane on outriggers, an operator should ensure: - Correct Answer there is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - Correct Answer Keeping 90 degree angle between cylinder rod and pad 
 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - Correct Answer Separate the boo...
-
NCCCO MOBILE CRANE EXAM | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
NCCCO MOBILE CRANE EXAM | 
Questions and Correct Solutions | 
Latest Update 2024/2025 | Graded 
A+ 
1. What action does a signal person intend the operator to perform if he 
extends his arm at shoulder height, makes a fist with his hand, and 
sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer -c. 
2. When hoisting personnel, within what percentage of level must a 
telescopic boom crane be in order for the gross ratings in the load chart 
to remain valid? 
a. 1%...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - ANS c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - ANS a. 
 
3. The lo...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% correct answers a. 
3. The load line of the crane you're operating contacts an energized power line. There's no sign of 
any other danger, such as fire. What should you do? 
a. Climb down carefully from the crane cab 
b. Jump do...
And that's how you make extra money
-
NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers
- Exam (elaborations) • 11 pages • 2024
-
- $13.49
- + learn more
NCCCO TWR Practice Test Study Guide 
Exam with 100% Verified Answers 
1. Which of the following OSHA regulations govern suspended personnel platforms? - 
CORRECT ANSWER-OSHA 1926.550(g) 
2. According to ASME B30.3, the prohibited zone for power lines that are 60kV is? - 
CORRECT ANSWER-15ft 
3. According to ASME B30.3, load hoist rotation resistant wire rope has a design factor 
of? - CORRECT ANSWER-5 to 1 
4. According to ASME B30.3, when lifting a suspended personnel platform the design 
fa...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 12 pages • 2024
-
Available in package deal
-
- $14.49
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% correct answers a. 
3. The load line of the crane you're operating contacts an energized power line. There's no sign of 
any other danger, such as fire. What should you do? 
a. Climb down carefully from the crane cab 
b. Jump down, feet...
-
NCCCO Core exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
NCCCO Core exam | Questions and 
Correct Solutions | Latest Update 
2024/2025 | Graded A+ 
A frequent inspection is: 
Daily to monthly 
1. What action does a signal person intend the operator to perform if he 
extends his arm at shoulder height, makes a fist with his hand, and 
sticks his/her thumb up? 
Boom Up 
(Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 
2. When hoisting personnel, within what percentage of level must a 
telescopic boom crane be in order for the gross rating...
-
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $14.49
- + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Operating a mobile crane with a long boom, on uneven ground, what support condition 
should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER 
Separate the boom hoist lines 
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, 
before it should be removed from...
-
NCCCO CORE EXAM 2023-2024 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS VERIFIED ANSWERS GRADED A+
- Exam (elaborations) • 22 pages • 2023
-
- $12.99
- + learn more
NCCCO CORE EXAM ACTUAL EXAM 
QUESTIONS AND CORRECT ANSWERS 
VERIFIED ANSWERS GRADED A+ 
If taking sides strain on a boom what concerns the operator the most - ANSWER-Boom 
damage 
If a crane load chart has capacities listed in the shaded area this means that - 
ANSWER-If overloaded structural confidence will be compromised 
As the layers of rope on a drum increase the allowable line Pull wil - ANSWERDecrease 
Of the following actions which one will most likely cause a side load condition - 
ANS...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia