Nccco mobile crane stuvia - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco mobile crane stuvia? On this page you'll find 12 study documents about Nccco mobile crane stuvia.

Page 2 out of 12 results

Sort by

Nccco signal person test Questions and Answers 100% Pass
  • Nccco signal person test Questions and Answers 100% Pass

  • Exam (elaborations) • 7 pages • 2024
  • Nccco signal person test Questions and Answers 100% Pass continuously - ANSWER-during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - ANSWER-if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - ANSWER-OSHA's standard method crane hand signals would be located in the following designated person - ANSWER-according to asme b30.5 prior to qualifying all signal persons...
    (0)
  • $11.49
  • + learn more
NCCCO Rigger 1 Study Questions with Correct Answers
  • NCCCO Rigger 1 Study Questions with Correct Answers

  • Exam (elaborations) • 6 pages • 2024
  • NCCCO Rigger 1 Study Questions with Correct Answers 1. A wire rope that is a 6x19 classification could have how many wires per strand? - ANSWER-15 through 26 wires per strand 2. How often should a synthetic web sling be inspected? - ANSWER-Each day before use 3. Which considerations should be given to suspend lifting operations with a mobile crane? - ANSWER-Winds in excess of 35 mph 4. What is the term that best describes surface wear on a wire rope sling to rubbing or sliding? - ANSWER-...
    (0)
  • $11.49
  • + learn more