Nicet 1 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nicet 1? On this page you'll find 713 study documents about Nicet 1.

Page 2 out of 713 results

Sort by

Nicet Level 1 - Water Based Layout Questions and Answers Graded A+
  • Nicet Level 1 - Water Based Layout Questions and Answers Graded A+

  • Exam (elaborations) • 26 pages • 2023
  • Nicet Level 1 - Water Based Layout Questions and Answers Graded A+ Toggle hangers shall be permitted only for the support of pipe __________ inches or smaller in size under ceilings of hollow tile or metal lath and plaster. 1 2/2 in. (ref. NFPA 13 2016 Sec. 9.2.1.1.2. While conducting a flow test, the chosen hydrant should be ______ As close to the property where the sprinkler system is being installed. (Ref, NFPA 13 Sec. A.24.2.2. or NFPA 291) What formula is used to determine the discharge ...
    (0)
  • $10.49
  • 1x sold
  • + learn more
NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS Acceptance - Answer-The written acceptance by the Department of the Work. acceptance testing - Answer-Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - Answer-The computed cost using calculations provided addendum - Answer-A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - Answer-The quantity ...
    (0)
  • $12.49
  • 1x sold
  • + learn more
NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers)
  • NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers)

  • Exam (elaborations) • 16 pages • 2024
  • NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers) During installation of traffic loops in the pavement, which three statements apply prior to and during the installation of loop wire? (Choose 3). a) Do not allow vehicular traffic over an open saw cut. b) Do not overlap saw cuts at the corner. c) Thoroughly clean the saw cut of foreign material. d) Use a plastic sleeve where loop wire crosses a joint.
    (0)
  • $8.99
  • 1x sold
  • + learn more
 NICET 1 EXAM 2024 WITH 100% CORRECT ANSWERS
  • NICET 1 EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 70 pages • 2024
  • If the total resistance in the above circuit is 571 ohms, what is the total current? Answer - 21 milliamps What type of fire extinguisher would you use for fire where there metals such as or titanium? Answer - Class D What type of detector would be best suited for the large public areas of multi-story indoor shopping mall with high ceilings? Answer - Projected beam Record keeping requirements include Select all that apply Answer - The records must be permanent. The owner shall be requi...
    (0)
  • $16.49
  • + learn more
NICET Level 1 inspection and Testing Exam 2024
  • NICET Level 1 inspection and Testing Exam 2024

  • Exam (elaborations) • 5 pages • 2024
  • NICET Level 1 inspection and Testing Exam 2024 When using a pulse load tester on a sealed lead acid battery, the minimum acceptable capacity is... -Answer-80% When a software change is made to a fire alarm system, what percentage of the initiating devices not affected by the change must be tested -Answer-10% When testing elevator recall, the elevator should go to the alternate level when: -Answer-The lobby smoke detector on the recall level is activated Minimum requirement for system docu...
    (0)
  • $11.49
  • 1x sold
  • + learn more
NICET Study Guide Unit 1 - 32.
  • NICET Study Guide Unit 1 - 32.

  • Exam (elaborations) • 27 pages • 2024
  • NICET Study Guide Unit 1 - 32.
    (0)
  • $16.49
  • + learn more
NICET Soils level 1 Exam(Answered)2023
  • NICET Soils level 1 Exam(Answered)2023

  • Exam (elaborations) • 6 pages • 2023
  • NICET Soils level 1 Exam(Answered)2023
    (0)
  • $12.99
  • 3x sold
  • + learn more
NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024
  • NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024 Chapter 1 - Answer-Administration Chapter 2 - Answer-Referenced Publications (Other NFPA Standards) Chapter 3 - Answer-Definitions Chapter 4 - Answer-General Requirements (Owner's Chapter) Chapter 5 - Answer-Sprinkler Systems (Heads, Hangers, Waterflow Alarm Devices, AF Systems, Dry Pipe Systems) Chapter 6 - Answer-Standpipe & Hose Systems Chapter 7 - Answer-Hydra...
    (0)
  • $11.49
  • 1x sold
  • + learn more
NICET 1 Questions and Answers (2022/2023) (Scored A)
  • NICET 1 Questions and Answers (2022/2023) (Scored A)

  • Exam (elaborations) • 89 pages • 2023
  • NICET 1 Questions and Answers (2022/2023) (Scored A) If combination audible/visible appliances are installed, the location of the installed appliance shall be determined by the requirements of a. the audible appliance b. the visible appliance c. the NEC d. the AHJ b. the visible appliance What is the maximum number of 12 gauge THHN wires that can be installed in 1-inch EMT? a. 26 b. 35 c. 19 d. 32 a. 26 Two resistors are connected in parallel. R1= 300 Ohms, R2= 300 Ohms. What is their...
    (0)
  • $11.49
  • + learn more
NICET Inspect & Test LVL 2 Exam Questions and Answers
  • NICET Inspect & Test LVL 2 Exam Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • NICET Inspect & Test LVL 2 Exam Questions and Answers While testing a fire alarm system at a correctional facility, it is determined that the general fire alarm signal requires human intervention to be initiated. This is permitted using a _____ feature? A. Pre signal B. Positive alarm sequence C. Manual initiation D. Alarm verification - Answer-A. Pre Signal NFPA 72 23.8.1.1.2(3)(a) Consider a 50′ x 50′ room with a 12′ ceiling. What is the minimum intensity required for a ceilin...
    (0)
  • $11.49
  • 1x sold
  • + learn more