Nicet level 1 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nicet level 1? On this page you'll find 734 study documents about Nicet level 1.

Page 2 out of 734 results

Sort by

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS Acceptance - Answer-The written acceptance by the Department of the Work. acceptance testing - Answer-Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - Answer-The computed cost using calculations provided addendum - Answer-A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - Answer-The quantity ...
    (0)
  • $12.49
  • 1x sold
  • + learn more
NICET Level 1 inspection and Testing Exam 2024
  • NICET Level 1 inspection and Testing Exam 2024

  • Exam (elaborations) • 5 pages • 2024
  • NICET Level 1 inspection and Testing Exam 2024 When using a pulse load tester on a sealed lead acid battery, the minimum acceptable capacity is... -Answer-80% When a software change is made to a fire alarm system, what percentage of the initiating devices not affected by the change must be tested -Answer-10% When testing elevator recall, the elevator should go to the alternate level when: -Answer-The lobby smoke detector on the recall level is activated Minimum requirement for system docu...
    (0)
  • $11.49
  • 1x sold
  • + learn more
Nicet Level 1 - Water Based Layout Questions and Answers Graded A+
  • Nicet Level 1 - Water Based Layout Questions and Answers Graded A+

  • Exam (elaborations) • 26 pages • 2023
  • Nicet Level 1 - Water Based Layout Questions and Answers Graded A+ Toggle hangers shall be permitted only for the support of pipe __________ inches or smaller in size under ceilings of hollow tile or metal lath and plaster. 1 2/2 in. (ref. NFPA 13 2016 Sec. 9.2.1.1.2. While conducting a flow test, the chosen hydrant should be ______ As close to the property where the sprinkler system is being installed. (Ref, NFPA 13 Sec. A.24.2.2. or NFPA 291) What formula is used to determine the discharge ...
    (0)
  • $10.49
  • 1x sold
  • + learn more
Nicet Level 1 water-based systems Practice Exam Questions and Answers 100% Pass
  • Nicet Level 1 water-based systems Practice Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • Nicet Level 1 water-based systems Practice Exam Questions and Answers 100% Pass What is a purpose of a control valve - Answer-Control Flow to water based fire protection system The gauge on the quick opening device shall indicate _____ as compared to the gauge on the system side of the dry pipe valve? - Answer-the same pressure What type of test shall be provided when a valve is returned to service to determine that the valve is open? - Answer-Valve status test What is a fire service mai...
    (0)
  • $11.49
  • 1x sold
  • + learn more
Nicet Level 1 Study Guide Questions | 150 Questions with 100% Correct Answers | Updated & Verified
  • Nicet Level 1 Study Guide Questions | 150 Questions with 100% Correct Answers | Updated & Verified

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • When testing a water level supervisory switch serving a pressure tank a signal shall indicate if the water level _____________from the required level (NFPA 72, Table 14.4.3.2 17 (j) (4) - ANS - rises or falls over 3 inches If combination audible/visible appliances are installed the location of the installed appliance shall be determined by the requirements of _______. (Nfpa 72 18.4.8.1) - ANS - the visible appliance What is the maximum number of 12 gauge THHN wires that can be installed in...
    (1)
  • $15.49
  • 2x sold
  • + learn more
NICET Fire Alarm Level 1 Exam Questions And Revised Correct  Answers
  • NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers

  • Exam (elaborations) • 14 pages • 2024
  • NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the center-line of the door? - ANSWER : 21 feet At minimum, when working near power lines with voltage of 600 volts and lower, an aerial lift operator shall maintain which distance from the lines? - ANSWER : 10 feet The use of unprotected EMT shall be permitted under which conditions? - ANSWER : when in direct contact with t...
    (0)
  • $11.34
  • 2x sold
  • + learn more
NICET LEVEL 1 HIGHWAY CONSTRUCTION Exam Questions and Answers (Latest Update 2023) Verified Answers.
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION Exam Questions and Answers (Latest Update 2023) Verified Answers.

  • Exam (elaborations) • 26 pages • 2024
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION Exam Questions and Answers (Latest Update 2023) Verified Answers.
    (0)
  • $12.99
  • 1x sold
  • + learn more
NICET Level 1 ITM Of Water-Based Systems questions with correct answers
  • NICET Level 1 ITM Of Water-Based Systems questions with correct answers

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • Who is responsible for the inspection, testing, maintenance and impairment of a water based fire protection system? - Answer The Property owner or designated representative Who's responsibility is it to provide accessibility to components of a water based fire protection system? - Answer The property owner or designated representative Who shall correct or repair deficiencies or impairments found during the inspection, test and maintenance required by standard? - Answer The property ...
    (0)
  • $14.99
  • 1x sold
  • + learn more
Nicet level 1 Study Guide Questions and complete solutions
  • Nicet level 1 Study Guide Questions and complete solutions

  • Exam (elaborations) • 15 pages • 2023
  • When testing a water level supervisory switch serving a pressure tank a signal shall indicate if the water level _____________from the required level (NFPA 72, Table 14.4.3.2 17 (j) (4) - rises or falls over 3 inches If combination audible/visible appliances are installed the location of the installed appliance shall be determined by the requirements of _______. (Nfpa 72 18.4.8.1) - the visible appliance What is the maximum number of 12 gauge THHN wires that can be installed in 1...
    (0)
  • $10.49
  • 1x sold
  • + learn more