Nicet level 1 2 3 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nicet level 1 2 3? On this page you'll find 97 study documents about Nicet level 1 2 3.

Page 2 out of 97 results

Sort by

NICET level 1 Study Guide questions &  Answers, rated A+, VERIFIED/[LATEST EXAM UPDATES]
  • NICET level 1 Study Guide questions & Answers, rated A+, VERIFIED/[LATEST EXAM UPDATES]

  • Exam (elaborations) • 27 pages • 2024
  • NICET level 1 Study Guide questions & Answers, rated A+, VERIFIED/ When testing a water level supervisory switch serving a pressure tank a signal shall indicate if the water level _____________from the required level (NFPA 72, Table 14.4.3.2 17 (j) (4) - rises or falls over 3 inches If combination audible/visible appliances are installed the location of the installed appliance shall be determined by the requirements of _______. (Nfpa 72 18.4.8.1) - the visible appliance What is the ma...
    (0)
  • $11.49
  • + learn more
Nicet level 1 Study Guide questions and answers 100% pass
  • Nicet level 1 Study Guide questions and answers 100% pass

  • Exam (elaborations) • 28 pages • 2023
  • Nicet level 1 Study Guide questions and answers 100% pass When testing a water level supervisory switch serving a pressure tank a signal shall indicate if the water level _____________from the required level (NFPA 72, Table 14.4.3.2 17 (j) (4) rises or falls over 3 inches If combination audible/visible appliances are installed the location of the installed appliance shall be determined by the requirements of _______. (Nfpa 72 18.4.8.1) the visible appliance What is the maximum number of 12 ...
    (0)
  • $10.49
  • + learn more
NICET Level 1 Fire Alarm Systems Exam Questions And Revised Correct Answers New Update
  • NICET Level 1 Fire Alarm Systems Exam Questions And Revised Correct Answers New Update

  • Exam (elaborations) • 10 pages • 2024
  • NICET Level 1 Fire Alarm Systems Exam Questions And Revised Correct Answers New Update The operable part of a manually actuated alarm initiating device shall be not less than ____ inches AFF. - Answer -42 inches Consider the use of grounding electrodes. Rod and pipe electrodes shall not be less than____ feet in length? - Answer -8 feet Smoke detectors should not be located in a direct airflow or closer than ____ inches from an air supply diffuser or return air opening? - Answer -36 inch...
    (0)
  • $11.99
  • + learn more
NICET Inspect & Test LVL 2 Exam Questions and Answers
  • NICET Inspect & Test LVL 2 Exam Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • NICET Inspect & Test LVL 2 Exam Questions and Answers While testing a fire alarm system at a correctional facility, it is determined that the general fire alarm signal requires human intervention to be initiated. This is permitted using a _____ feature? A. Pre signal B. Positive alarm sequence C. Manual initiation D. Alarm verification - Answer-A. Pre Signal NFPA 72 23.8.1.1.2(3)(a) Consider a 50′ x 50′ room with a 12′ ceiling. What is the minimum intensity required for a ceilin...
    (0)
  • $12.49
  • + learn more
Nicet level 1 Study Guide questions and answers 100% pass
  • Nicet level 1 Study Guide questions and answers 100% pass

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • Nicet level 1 Study Guide questions and answers 100% pass When testing a water level supervisory switch serving a pressure tank a signal shall indicate if the water level _____________from the required level (NFPA 72, Table 14.4.3.2 17 (j) (4) - Answer-rises or falls over 3 inches If combination audible/visible appliances are installed the location of the installed appliance shall be determined by the requirements of _______. (Nfpa 72 18.4.8.1) - Answer-the visible appliance What is the ...
    (0)
  • $13.49
  • + learn more
TFM01 Exam Questions and Answers
  • TFM01 Exam Questions and Answers

  • Exam (elaborations) • 10 pages • 2024
  • TFM01 Exam Questions and Answers The fire marshal shall send notice to each examinee of the results of the examination no later than -Answer-30 days If the examination is conducted by a testing service the state marshal shall send notice of the results no later than -Answer-14 days If examination results will be delayed the state marshal shall send notice to the examinee no later than -Answer-90 days A renewal of a registration certificate or license is valid for a period of -Answer-2 yea...
    (0)
  • $12.49
  • + learn more
NICET Fire Alarm Level 1 Exam Questions and Answers
  • NICET Fire Alarm Level 1 Exam Questions and Answers

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NICET Fire Alarm Level 1 Exam Questions and Answers When a device is inaccessible due to excessive height, such as an atrium, what it the maximum interval for testing? - Answer-18 months When installing a wall-mounted fire telephone appliance to the public, what is the acceptable maximum mounting height from the floor? - Answer-66 inches Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the center-line of the door? - Answer-21 feet At minimum, when w...
    (0)
  • $12.49
  • + learn more
Nicet Level 2: Utilities, Incidental Construction and Site Layout Exam Questions and Answers
  • Nicet Level 2: Utilities, Incidental Construction and Site Layout Exam Questions and Answers

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • Nicet Level 2: Utilities, Incidental Construction and Site Layout Exam Questions and Answers What is the required expansion joint spacing for sidewalks? - Answer-not exceeding intervals exceeding 20' What should expansion joints be filled with? - Answer-3/4" joint filled with elastomeric joint sealer or joint filler to entire depth of sidewalk What intervals are contraction joints placed for sidewalks? - Answer-Intervals of 10' How are contraction joints formed? - Answer-utilizing join...
    (0)
  • $10.49
  • + learn more
Nicet Level 2 questions and answers 2024
  • Nicet Level 2 questions and answers 2024

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • Nicet Level 2 questions and answers 2024 4 - Answer-Consider a room which is 40' square. How many 15cd wall mounted strobes are required to adequately cover this space? Annually - Answer-What is the testing frequency of a strobe? 15 - Answer-In a corridor application, visible appliances shall be rated not less than ________ cd? 4 hours - Answer-Consider a household fire alarm system where the primary power is provided by a circuit that can be switched off by means other than a circuit br...
    (0)
  • $11.49
  • + learn more