Osha 30 crane safety - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Osha 30 crane safety? On this page you'll find 269 study documents about Osha 30 crane safety.

Page 2 out of 269 results

Sort by

Answered)OSHA 10 Hour Test Questions 2023 all correct.
  • Answered)OSHA 10 Hour Test Questions 2023 all correct.

  • Exam (elaborations) • 40 pages • 2022
  • OSHA 10 Hour Test Questions 2023 (use CTRL + F ) to find your specific question and answer... Concerning the identification and control of worksite hazards, which one of these statements is FALSE? During the course of construction, how frequently should combustible scrap and debris be removed? In the event of exposure to hazardous conditions that cannot be eliminated, employers should require employees: An emergency action plan should contain all these elements EXCEPT: Safety prog...
    (0)
  • $12.89
  • 7x sold
  • + learn more
OSHA 30 CONSTRUCTION FINAL EXAM
  • OSHA 30 CONSTRUCTION FINAL EXAM

  • Exam (elaborations) • 75 pages • 2024
  • OSHA 30 CONSTRUCTION FINAL EXAM 1. OSHA requires training to be provided within one year of when a safety and health program is first established A. True B. False (correct answer) The minimum safe distance for equipment operating in proximity to energized power lines that contain up to 50,000 volts is A. 25 feet B. 5 feet C. 10 feet (correct answer) D. 50 feet The GFCI fits into the standard electrical outlet box to protect ground faults. A. Disposable B. Receptacle (...
    (0)
  • $10.99
  • + learn more
OSHA 30- Crane Safety Practice Test 2024.
  • OSHA 30- Crane Safety Practice Test 2024.

  • Exam (elaborations) • 4 pages • 2024
  • OSHA 30- Crane Safety Practice Test 2024. Which two cranes typically use a lattice boom? - correct answer Truck mounted, crawler Lattice sections cannot be added or removed on truck mounted boom cranes - correct answer False Tag lines are quite hard to put into place - correct answer False Standards for crane safety can be found in - correct answer 29 CFR An annual inspection of each crane: - correct answer Is required by OSHA. Must be documented. Is typically kept with the crane ...
    (0)
  • $10.49
  • + learn more
OSHA 30: Overhead Crane Safety - Safe Crane Operation Questions and answers | Latest 2024/25
  • OSHA 30: Overhead Crane Safety - Safe Crane Operation Questions and answers | Latest 2024/25

  • Exam (elaborations) • 2 pages • 2024
  • OSHA 30: Overhead Crane Safety - Safe Crane Operation Questions and answers | Latest 2024/25
    (0)
  • $10.49
  • + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025
  • OECP Exam Questions With 100% Correct Answers 2024/2025

  • Exam (elaborations) • 23 pages • 2024
  • OECP Exam Questions With 100% Correct Answers 2024/2025. What are the four different types of crane signals? Hand Voice Audible New 2. The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D...
    (0)
  • $15.49
  • + learn more
OSHA 30 Crane Safety-with 100% verified solutions 2024-2025
  • OSHA 30 Crane Safety-with 100% verified solutions 2024-2025

  • Exam (elaborations) • 5 pages • 2024
  • OSHA 30 Crane Safety-with 100% verified solutions
    (0)
  • $7.49
  • + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)
  • OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)

  • Exam (elaborations) • 23 pages • 2024
  • OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED) The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D? Qualified Rigger 7. Signal training is now required in the construction...
    (0)
  • $15.99
  • + learn more
Nccco Core + Specialty Test Prep Exam |  Questions & 100% Correct Answers  (Verified) | Latest Update | Grade A+
  • Nccco Core + Specialty Test Prep Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 20 pages • 2024
  • ASME B30.5 Correct Answer: Mobile and Locomotive cranes, all types ASME B30.3 Correct Answer: Tower Cranes ASME B30.23 Correct Answer: Personel Lifting Regs OSHA 29 CFR 1926.1400 Series Correct Answer: Cranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope Correct Answer: 2 randomly broken wires in 6 diameters. 4 randomly broken wires in 30 diameters. 2 Safety factor 5.0 Safety factor personel lifts 10-1 ASME B30.9 Correct Answer: Slings Personel Platforms ...
    (0)
  • $12.49
  • + learn more
CHST STUDY GUIDE LATEST UPDATE  GRADED A+
  • CHST STUDY GUIDE LATEST UPDATE GRADED A+

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • CHST STUDY GUIDE LATEST UPDATE GRADED A+ Which of the following is NOT a significant factor in determining the impact of an electrocution event on a worker? The amount of electrically resistant material present in work boots and work gloves A Hearing Conservation Program is required under OSHA regulation 29 CFR 1926.52 (Occupational Noise Exposure) when workers are exposed to noise levels in excess of an eight- hour time-weighted average of _________. 90 decibels (dB) Per 29 CFR...
    (0)
  • $9.99
  • + learn more
Nccco Core Exam Questions With All Answers
  • Nccco Core Exam Questions With All Answers

  • Exam (elaborations) • 21 pages • 2024
  • Nccco Core Exam Questions With All Answers If taking sides strain on a boom what concerns the operator the most - ANSWER- Boom damage If a crane load chart has capacities listed in the shaded area this means that - ANSWER- If overloaded structural confidence will be compromised As the layers of rope on a drum increase the allowable line Pull wil - ANSWER- Decrease Of the following actions which one will most likely cause a side load condition - ANSWER- Abruptly starting or stopping t...
    (0)
  • $13.99
  • + learn more