Pjm exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Pjm exam? On this page you'll find 224 study documents about Pjm exam.
Page 2 out of 224 results
Sort by
-
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified | Latest Update 2024 | 30 Pages
- Exam (elaborations) • 30 pages • 2023
- Available in package deal
-
- $20.49
- 1x sold
- + learn more
During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - 500 to 550 kV 
When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - 30 MW 
Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
When will PJM issue a Minimum Generation Alert? (how many MW under normal operating limits) - 
Whe...
-
PJM Exam Questions and Answers 100% Correct
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Exam Questions and Answers 100% Correct 
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO - Correct Answer ️️ -TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental - Correct Answer ️️ -Quick-start 
(hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? - 
Correct Answer ️️ -20 MVA 
Minimum MVARs for an aggr...
-
PJM Exam Questions & Answers 2024
- Exam (elaborations) • 14 pages • 2024
-
Available in package deal
-
- $8.99
- + learn more
PJM Exam Questions & Answers 2024 
 
 
What is the threshold for having a satellite phone? - ANSWER-500 MW 
 
How often is reactive testing completed? - ANSWER-5 years 
 
Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 
 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation - ANSWER-Loss of adjacent control area generation 
 
PJM should be made aware of any fuel shortage tha...
-
PJM Generation Dispatcher Exam Practice Questions and Answers 2023 Verified 100%
- Exam (elaborations) • 5 pages • 2023
-
- $11.49
- 1x sold
- + learn more
PJM Generation Dispatcher Exam Practice Questions and Answers 2023 Verified 100%
-
PJM Generation Dispatcher Exam 2024 with 100% correct answers
- Exam (elaborations) • 62 pages • 2024
-
- $15.49
- 1x sold
- + learn more
An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits 
 
When synchronizing to the interconnection, what needs to be synchronized? - correct answer Frequency, Voltage, and phase angle. 
 
GMD (GeoMagnetic Disturbance) procedure is implemented when? - correct answer 10A or greater is measured by specia...
As you read this, a fellow student has made another $4.70
-
NCARB PJM Exam with Questions Solved with 100% Correct Answers
- Exam (elaborations) • 26 pages • 2024
-
- $13.49
- + learn more
During construction, the owner provides many of the building materials needed for 
construction from his personal stash. If the owner-architect contract stipulates that the 
architect's fee will be 7% of construction costs, will the architect be paid for that 7% of 
the actual construction cost or 7% of what the construction cost would have been had 
the material not been provided free by the owner? - Answer The owners budget for the 
cost of the work includes the reasonable value of labor, mat...
-
PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO 
: TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental 
: Quick-start (hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? 
: 20 MVA 
Minimum MVARs for an aggregate of generators that is required to do reactive testing? 
: 75 MVA 
Power transformer is connected to the g...
-
PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
What is the threshold for having a satellite phone? 
: 500 MW 
How often is reactive testing completed? 
: 5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing 
area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation 
: Loss of adjacent control area generation 
PJM should be made aware of any fuel shortage that a generator may experience. This 
information assists in ana...
-
PJM Exam Questions and Answers 2024
- Exam (elaborations) • 10 pages • 2024
-
Available in package deal
-
- $15.49
- + learn more
PJM Exam
-
PJM EXAM QUESTIONS AND ANSWERS
- Package deal • 5 items • 2024
-
- $28.49
- + learn more
PJM EXAM QUESTIONS AND ANSWERS INCLUDING PAST AND LATEST PAPER AS OF 2024. BEST GUARANTEED SUCCESS
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia