Pjm generator operator Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Pjm generator operator? On this page you'll find 33 study documents about Pjm generator operator.
Page 2 out of 33 results
Sort by
![PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.](/docpics/4245296/65a6a8cfa7b48_4245296_121_171.jpeg)
-
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.
- Exam (elaborations) • 39 pages • 2024
-
- $12.99
- + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024. 
During System Restoration, what is the optimal Frequency Range? 
59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? 
500 to 550 kVRead More 
When Connecting 2 islands, the operator must match? 
Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 
30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energi...
![PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions)](/docpics/5044515/6621ad45993b1_5044515_121_171.jpeg)
-
PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions)
- Exam (elaborations) • 40 pages • 2024
- Available in package deal
-
- $27.49
- + learn more
PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions) Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let PJ...
![PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified | Latest Update 2024 | 30 Pages](/docpics/4195452/659f6f8702582_4195452_121_171.jpeg)
-
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified | Latest Update 2024 | 30 Pages
- Exam (elaborations) • 29 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified | Latest Update 2024 | 30 Pages 
During System Restoration, what is the optimal Frequency Range? - Correct Answer 59.75 - 61 Hz 
 
The 500 kV system has normal bus voltages between? - Correct Answer 500 to 550 kV 
 
When Connecting 2 islands, the operator must match? - Correct Answer Voltage, Phase Angle and Frequency 
 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - Correct ...
![PJM cert: TO final| 180 Questions With 100% Correct Answers|49 Pages](/docpics/4213818/65a24a6c30903_4213818_121_171.jpeg)
-
PJM cert: TO final| 180 Questions With 100% Correct Answers|49 Pages
- Exam (elaborations) • 49 pages • 2024
- Available in package deal
-
- $8.49
- + learn more
Which of the following would not be an action to take for low voltages 
A. Increase generator MW output 
B. Remove reactors from the system 
C. Increase generator MVAR output 
D. Place capacitors in service - ️️A. Increase generator MW output 
	 
PJM operates it's 500 KV system so that no post contingency voltage drop will exceed what minimum value 
A. 1% 
B. 3% 
C. 5% 
D. 7% - ️️C. 5% 
 
The PJM system operator finds that a 230 KV transmission line is over its normal limit. How long do...
![PJM Exam Questions & Answers 2024](/docpics/4136105/6595da55d3466_4136105_121_171.jpeg)
-
PJM Exam Questions & Answers 2024
- Exam (elaborations) • 14 pages • 2024
-
Available in package deal
-
- $8.99
- + learn more
PJM Exam Questions & Answers 2024 
 
 
What is the threshold for having a satellite phone? - ANSWER-500 MW 
 
How often is reactive testing completed? - ANSWER-5 years 
 
Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 
 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation - ANSWER-Loss of adjacent control area generation 
 
PJM should be made aware of any fuel shortage tha...
![PJM Transmission Exam Study Questions and Answers](/docpics/5550312/6660c8c4d69cf_5550312_121_171.jpeg)
-
PJM Transmission Exam Study Questions and Answers
- Exam (elaborations) • 35 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
PJM Transmission Exam Study 
Questions and Answers 
During System Restoration, what is the optimal Frequency Range? - Correct Answer ️️ 
-59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - Correct Answer ️️ -500 to 
550 kV 
When Connecting 2 islands, the operator must match? - Correct Answer ️️ -Voltage, 
Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 
- Correct Answer ️️ -30 MW Gen/mile of energized...
![PJM Sample Test Review 2024 Questions and Answers](/docpics/5550325/6660c8ca71c56_5550325_121_171.jpeg)
-
PJM Sample Test Review 2024 Questions and Answers
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Sample Test Review 2024 
Questions and Answers 
Real time transmission constraints or contingencies may be alleviated with generators 
operating ______________ - Correct Answer ️️ -off cost out of merit. 
Monitoring ___________ may give insights into system constraints. - Correct Answer ️️ 
-Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line schedules are 
maintained. - Correct Answer ️️ -PJM calls on synchronized reserves 
If not cancelled by...
![An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits When syn](/docpics/4248057/65a6f04e26b15_4248057_121_171.jpeg)
-
An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits When syn
- Exam (elaborations) • 4 pages • 2024
-
- $16.49
- + learn more
If the scheduled frequency must be adjusted for a time error correction, what would the PJM operator set the frequency schedule to for a fast clock? - correct answer 59.98 
 
What is the PJM regulation requirement for the off-peak period? - correct answer 525 
 
Which of the following PJM reserves are NOT synchronized? - correct answer Non-synchronized (quick-start) 
 
What is the margin in relationship to regulation requirement that is used by PJM for assigning or de-assigning regulation?...
![PJM Test Questions Well Answered And Graded A+.](/docpics/4766761/65f72f36c5054_4766761_121_171.jpeg)
-
PJM Test Questions Well Answered And Graded A+.
- Exam (elaborations) • 33 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
Which of the following balancing control modes is used by PJM under normal operations? - correct answer Tie-Line Bias 
 
Which of the following influences does PJM consider when performing their system load forecast? - correct answer Weather Conditions & Day of the Week 
 
All of the following are limits that must be submitted to PJM for generating units EXCEPT: 
 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability - correct answer Dynamic Instability 
 
If PJM experienced an event...
![PJM Questions & Correct Answers | Latest Update |Already Graded A+](/docpics/5172604/663384bfe4503_5172604_121_171.jpeg)
-
PJM Questions & Correct Answers | Latest Update |Already Graded A+
- Exam (elaborations) • 47 pages • 2024
-
- $13.49
- + learn more
During System Restoration, what is the optimal Frequency Range? 
: 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? 
: 500 to 550 kV 
When Connecting 2 islands, the operator must match? 
: Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements-(500kV+) for a 500 kV? 
: 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
When will PJM issue a Minimum Generation Alert? 
: When expected generation levels fall within 2500 MW of normal op...
![Verkoop je kennis op stuvia](https://www.stuvia.com/hosted-imgs/app/stock-fotos/banner_seller_big.jpg)
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia