Pre bid qualification - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Pre bid qualification? On this page you'll find 60 study documents about Pre bid qualification.

Page 2 out of 60 results

Sort by

AIC EXAM #2 | QUESTIONS & ANSWERS  (VERIFIED) | LATEST UPDATE | GRADED  A+
  • AIC EXAM #2 | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+

  • Exam (elaborations) • 46 pages • 2024
  • Available in package deal
  • AIC EXAM #2 | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+ What is the name of the law principle for referring the Contractor to other documents that are not contained in the package provided? Correct Answer: Incorporated by Reference. Which document issued by the Architect illustrates what is to be built? Correct Answer: Plans Which document describes quality of work and the quality of the materials and the construction execution procedures? Correct Answer: Technica...
    (0)
  • $11.49
  • + learn more
CMT 443 Conceptual Est. || Questions and 100% Verified Answers.
  • CMT 443 Conceptual Est. || Questions and 100% Verified Answers.

  • Exam (elaborations) • 23 pages • 2024
  • True correct answers A contractor's estimating department is responsible for identifying the goals and objectives of the department. Pre-Solicitation Notice correct answers Agencies of the U.S. government use a standard form called the "____" to provide bid information. advertisements in newspapers correct answers All of the following are considered primary sources of information for private bids EXCEPT: prequalified correct answers A method of addressing the problem of bids from con...
    (0)
  • $12.49
  • + learn more
Construction Management 3014 Virginia Tech Exam 1 Questions & Answers(RATED A+)
  • Construction Management 3014 Virginia Tech Exam 1 Questions & Answers(RATED A+)

  • Exam (elaborations) • 6 pages • 2024
  • construction industry vs. manufacturing - ANSWERmanufacturing produces products and then sells. construction starts with a customer need and the product is built to fill the need. sectors of construction industry (4) - ANSWERinfrastructure, commercial, residential, industrial main players in construction project (3) - ANSWERowner, designer, constructor stages of construction lifecycle - ANSWER1)need 2)programming 3)schematic design 4)detailed design 5)construction documents 6)bid ...
    (0)
  • $10.99
  • + learn more
CPPO Prep Questions with Complete Solutions
  • CPPO Prep Questions with Complete Solutions

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • CPPO Prep Questions with Complete Solutions Sole source, single source and emergency procurements are examples of: A. The best ways of procuring goods and services. B. Non-competitive methods of procuring goods and services. C. Unauthorized procurement methods. D. Procurement methods of questionable value. - Correct Answer-B. Non-competitive methods of procuring goods and services. In preparing to write a specification or scope of work, we may want to consider one of two methods of gathe...
    (0)
  • $13.49
  • + learn more
Final Exam (SCM 301m )| Complete Solutions (Verified)
  • Final Exam (SCM 301m )| Complete Solutions (Verified)

  • Exam (elaborations) • 17 pages • 2024
  • SCM 301m Final Exam | Complete Solutions (Verified) In terms of supplier evaluation systems, quality, delivery, and cost management are ________. a. qualitative factors. b. quantitative indicators. c. macro variables. d. micro variables. Which of the followings does not describe RFQ? a. Based on buyer specification b. Strict buyer requirements c. Terms are negotiable d. Suppliers are qualified beforehand In order to save additional time, all types of request can be run in a/an __________ syste...
    (0)
  • $19.99
  • + learn more
Construction Management 3014 Virginia Tech Exam 1 with Solutions
  • Construction Management 3014 Virginia Tech Exam 1 with Solutions

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Construction Management 3014 Virginia Tech Exam 1 with Solutions construction industry vs. manufacturing - Answer -manufacturing produces products and then sells. construction starts with a customer need and the product is built to fill the need. sectors of construction industry (4) - Answer -infrastructure, commercial, residential, industrial main players in construction project (3) - Answer -owner, designer, constructor stages of construction lifecycle - Answer -1)need 2)programming 3)...
    (0)
  • $8.79
  • + learn more
CFCM Practice Test Questions and Answers Graded A 2024
  • CFCM Practice Test Questions and Answers Graded A 2024

  • Exam (elaborations) • 6 pages • 2024
  • Contracting Officers below the level of _________ shall be selected and appointed. - Head of Contracting Activity The simplified acquisition threshold for any contract in support of contingency operations to be awarded and performed, or purchase to be made, outside of the U.S. is ____________ . - $1.5M The contracting officer may use competitive proposals in lieu of sealed bids if ______________ . - It is necessary to conduct discussions. Consolidating two or more requirements for suppl...
    (0)
  • $11.49
  • + learn more
COSC 463 - Exam 2 – Ellis (All Solved Correctly)
  • COSC 463 - Exam 2 – Ellis (All Solved Correctly)

  • Exam (elaborations) • 7 pages • 2023
  • time allowed for contractors to see the bid and to be able to put together a bid. correct answers Sufficient Bid Advertising A time where anyone can see what the bids correct answers Public Reading According to bid statutes, contract is always awarded to what kind of bidder? correct answers lowest, responsive, responsible (T/F) Each characteristic in the term "lowest, responsive, responsible" bidder, all have the same amount of importance correct answers true Ensures the owner/cont...
    (0)
  • $10.29
  • + learn more
Construction Management – JumpStart Questions and Answers 100% Pass
  • Construction Management – JumpStart Questions and Answers 100% Pass

  • Exam (elaborations) • 19 pages • 2023
  • Available in package deal
  • Construction Management – JumpStart Questions and Answers 100% Pass Distinguish between construction management as a function and construction management as a project delivery method. The construction management function entails various tasks performed by the contractor such as estimating, scheduling, cost control, and contact administration in order to monitor, manage, and control the work of the contract for which the contractor is obligated. Construction management as a project delivery me...
    (0)
  • $9.99
  • + learn more
COSC 353 test 2 100% correct
  • COSC 353 test 2 100% correct

  • Exam (elaborations) • 8 pages • 2024
  • COSC 353 test 2 100% correct Pre Bid qualification - Correct Answer️️ -submit information about the firm before the bid documents are released post bid qualification - Correct Answer️️ -information is submitted with the bid and reviewed by the owner during the bid evaluation Cost of work = - Correct Answer️️ -Direct cost + indirect cost Total cost to owner = - Correct Answer️️ -cost of work + % for overhead and profit a request for pricing, prepared by the owner with the h...
    (0)
  • $12.49
  • + learn more