NERC book quiz Questions and Answers (100% Correct Elaborations)
- Exam (elaborations) • 29 pages • 2023
-
Available in package deal
-
- $10.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? 
-4MW 
 
 
Net actual interchange minus Net scheduled interchange is what? 
Inadvertent interchange 
 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
-
Nerc Test Questions with Correct Solutions( Graded to Pass)
- Exam (elaborations) • 9 pages • 2023
-
Available in package deal
-
- $10.99
- + learn more
60 minutes - According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is less than_________________ 
 
2 business days - A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within how many days 
 
5% - During restoration efforts load pick-ups should not exceed_____________ percentage of synchronized generation capacity 
 
load and generation - What are the two components that a system operator should be a...
-
1000 MCQ's Dental ADC Waysem Latest Update 2023 Completely Solved
- Exam (elaborations) • 200 pages • 2023
-
- $17.99
- 1x sold
- + learn more
1. For lower premolars, the purpose of inclining the handpiece lingually is to, 
 
A. Avoid buccal pulp horn 
B. Avoid lingual pulp horn 
C. Remove unsupported enamel 
D. Conserve lingual dentine - ANSWER A. Avoid buccal pulp horn 
 
Explanation 
1- avoid BUCCAL pulp horn 
2- conserve ling. dentine 
 
So take A and B if available 
 
2. For an amalgam restoration of a weakened cusp you should, 
 
A. reduce cusp by 2mm on a flat base for more resistance 
B. reduce cusp by 2mm following the outli...
-
Nerc Test Questions with 100% Complete Solutions | Rated A+
- Exam (elaborations) • 9 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is less than_________________ - 60 minutes 
 
A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within how many days - 2 business days 
 
During restoration efforts load pick-ups should not exceed_____________ percentage of synchronized generation capacity - 5% 
 
What are the two components that a system operator should be aware of for controlling f...
-
Test Bank for College Physics, 12th Edition by Raymond A. Serwa|| Complete Guide A+
- Exam (elaborations) • 672 pages • 2024
-
- $18.04
- + learn more
Test Bank 
Test Bank for College Physics 12e 12th Edition by Raymond A. Serway, Chris Vuille, John Hughes. Full Chapters test bank are included with answers (Chapter 1 to 30) Complete Guide 1. Units, Trigonometry, and Vectors. Standards of Measurements. Measurement Uncertainty and Estimation. Math Review. Vectors. Overview of Physics. 2. Motion in One Dimension. Displacement, Velocity, and Acceleration. Motion Diagrams and Graphs. One-Dimensional Motion with Constant Acceleration. Freely Falling...
Too much month left at the end of the money?
-
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)
- Exam (elaborations) • 54 pages • 2024
-
- $17.99
- + learn more
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified) When system conditions are such that emergency procedures are expected to be 
implemented, which of the following actions should be considered first? 
a. Shed firm load 
b. Implement Active Load Management 
c. Return outaged equipment to service 
d. Request a voltage reduction - c. Return outaged equipment to service 
3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled on 
it, but due to parallel fl...
-
NERC Prep - Bal, Int, & Trans Test Questions With Verified Answers
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
b. NERC Operating Committee - Answer What group can approve a change in the Disturbance Recovery Period for an Interconnection? 
 a. NERC Interconnection Working Group 
 b. NERC Operating Committee 
 c. NERC Regional Council 
 d. NERC Disturbance Analysis Working Group 
 
c. Check targets and equipment - Answer What is the first thing an operator should do after a relay operation? 
 a. Check power system stabilizers 
 b. Notify adjacent Transmission and Balancing areas 
 c. Check targets and equ...
-
NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct
- Exam (elaborations) • 54 pages • 2024
-
Available in package deal
-
- $16.49
- + learn more
If a 500 kV transmission line with a surge impedance loading of 800 MW is 
currently loaded at 1400 MW, which of the following events would most likely 
occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - a. Generator MVAR output 
would increase 
2. When system conditions are such that emergency procedures are expected to be 
implemented, which of the follow...
-
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A
- Exam (elaborations) • 109 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Schedule by 20 MWs. 
 
B) Inform the Reliability Coordinator that you cannot participate in the time error correction. 
 
C) Decrease Net Interchange Schedule by 20 MWs. 
 
D) Increase Net Interchange Sche...
-
NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)
- Exam (elaborations) • 73 pages • 2023
-
Available in package deal
-
- $11.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system 
a. Generator MVAR output would increase 
 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of the fo...