Stop crane movements Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Stop crane movements? On this page you'll find 38 study documents about Stop crane movements.

Page 2 out of 38 results

Sort by

Signal Person Training Course Study Guide Questions with complete solution 2023/2024
  • Signal Person Training Course Study Guide Questions with complete solution 2023/2024

  • Exam (elaborations) • 5 pages • 2023
  • Signal Person Training Course Study Guide Questions with complete solution 2023/2024 During all crane movements, ASME B30.5 states that communication shall be maintained: - correct answer Continuously If the communication is disrupted at any time while the crane is in operation, the operator Shall: - correct answer Stop all crane movements OSHA's Standard hand signals would be located in: - correct answer OSHA 1926.1400 Appendix A According to ASME B30.5, prior to qualifying all signa...
    (0)
  • $13.49
  • + learn more
Tower Crane Exam set 3 Questions with Correct Answers
  • Tower Crane Exam set 3 Questions with Correct Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • A. by gradually increasing and decreasing speed Correct Answer How must tower crane movements be performed? A. by gradually increasing and decreasing speed B. as quick as the job dictates C. as slow as the job dictates D. at the speed designated by the site supervisor A. to limit side loading of the jib Correct Answer Why must the hoist line sheave be centered over the center of gravity of a load? A. to limit side loading of the jib B. to limit shock loading of the jib and tower assem...
    (0)
  • $13.39
  • + learn more
Nccco signal person test Questions and answers with 100% correct solutions | A+ Grade
  • Nccco signal person test Questions and answers with 100% correct solutions | A+ Grade

  • Exam (elaborations) • 8 pages • 2024
  • continuously during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a OSHA's standard method crane hand signals would be located in the following designated person according to asme b30.5 prior to qualifying all signal persons they must be tested by? none what should be the response of the operator if the signal is not ...
    (0)
  • $11.98
  • + learn more
Signal Person Training Course Study Guide question with verified solutions 2023/2024
  • Signal Person Training Course Study Guide question with verified solutions 2023/2024

  • Exam (elaborations) • 5 pages • 2023
  • Available in package deal
  • Signal Person Training Course Study Guide. During all crane movements, ASME B30.5 states that communication shall be maintained: - correct answer Continuously If the communication is disrupted at any time while the crane is in operation, the operator Shall: - correct answer Stop all crane movements OSHA's Standard hand signals would be located in: - correct answer OSHA 1926.1400 Appendix A According to ASME B30.5, prior to qualifying all signals persons must be tested by whom? - corre...
    (0)
  • $11.49
  • + learn more
Signal Person Training Course Study Guide Practice Test 2024.
  • Signal Person Training Course Study Guide Practice Test 2024.

  • Exam (elaborations) • 5 pages • 2024
  • Signal Person Training Course Study Guide Practice Test 2024. During all crane movements, ASME B30.5 states that communication shall be maintained: - correct answer Continuously If the communication is disrupted at any time while the crane is in operation, the operator Shall: - correct answer Stop all crane movements OSHA's Standard hand signals would be located in: - correct answer OSHA 1926.1400 Appendix A According to ASME B30.5, prior to qualifying all signals persons must be test...
    (0)
  • $11.49
  • + learn more
Crane Signal Person Training Set One Correctly Answered Exam 2024.
  • Crane Signal Person Training Set One Correctly Answered Exam 2024.

  • Exam (elaborations) • 4 pages • 2024
  • Crane Signal Person Training Set One Correctly Answered Exam 2024. During all crane movements, Asme B30.5 states that communication shall be maintained : - correct answer Continuously OSHA's standard method hand signals would be located in : - correct answer OSHA 1926.1400 Appendix A According to ASME B30.5 where must a hand signal chart be posted? - correct answer Posted conspicuously When using voice signals according to ASME B30.5, who must be present for the Pre-lift discussion? -...
    (0)
  • $11.49
  • + learn more
Nccco signal person test 2023 with complete solutions
  • Nccco signal person test 2023 with complete solutions

  • Exam (elaborations) • 7 pages • 2023
  • continuously correct answersduring all crane movements, asme b30.5 states that communication shall be maintained stop crane movements correct answersif the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a correct answersOSHA's standard method crane hand signals would be located in the following designated person correct answersaccording to asme b30.5 prior to qualifying all signal persons they must be tested by?
    (0)
  • $13.49
  • + learn more
crane signal person training set one questions with answers rated A+
  • crane signal person training set one questions with answers rated A+

  • Exam (elaborations) • 4 pages • 2023
  • Available in package deal
  • crane signal person training set oneDuring all crane movements, Asme B30.5 states that communication shall be maintained : - correct answer Continuously OSHA's standard method hand signals would be located in : - correct answer OSHA 1926.1400 Appendix A According to ASME B30.5 where must a hand signal chart be posted? - correct answer Posted conspicuously When using voice signals according to ASME B30.5, who must be present for the Pre-lift discussion? - correct answer Lift director, s...
    (0)
  • $10.49
  • + learn more
NCCCO signal person test (with Complete Solutions)
  • NCCCO signal person test (with Complete Solutions)

  • Exam (elaborations) • 5 pages • 2023
  • continuously correct answers during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements correct answers if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a correct answers OSHA's standard method crane hand signals would be located in the following designated person correct answers according to asme b30.5 prior to qualifying all signal persons they must be tested by? no...
    (0)
  • $9.99
  • + learn more
Signal Person Training Course Study Guide Questions with complete  solution 2023/2024
  • Signal Person Training Course Study Guide Questions with complete solution 2023/2024

  • Exam (elaborations) • 5 pages • 2023
  • Signal Person Training Course Study Guide Questions with complete solution 2023/2024 During all crane movements, ASME B30.5 states that communication shall be maintained: - correct answer Continuously If the communication is disrupted at any time while the crane is in operation, the operator Shall: - correct answer Stop all crane movements OSHA's Standard hand signals would be located in: - correct answer OSHA 1926.1400 Appendix A According to ASME B30.5, prior to qualifying all sign...
    (0)
  • $13.49
  • + learn more