ABSA 4b Exam Latest Version.
- Exam (elaborations) • 132 pages • 2024
-
- $19.00
- + learn more
ABSA 4b Exam Latest Version. 
Warm Air Heating System Equipment 
 
 
In a warm air heating system the cold air return registers 
are located 
a) in exterior walls 
b) in interior locations 
c) under windows 
d) in floors 
e) in ceilings 
B 
 
 
The major disadvantage of an electric resistance coil furnace 
for warm air heating is 
a) the high cost of electricity 
b) the danger from electric shock 
c) the high cost of maintenance 
d) the large size of the furnace 
e) the location of electrical wi...
-
Stationary Engineer Exam Questions and Answers Latest 2024/2025 (GRADED A+)
- Exam (elaborations) • 63 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
Stationary Engineer Exam Questions and Answers Latest 2024/2025 (GRADED A+) How much clearance from the top of the boiler is needed for a HP boiler that 
produces 70000 lbs of steam? - Answer 7 feet 
On a gas fired boiler what is the proper gas to air mixture - Answer 30%-70% and 
in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 
remember% 
What is the total hardness in a system that was found to have calcium hardness 
of 60ppm and magnesium hardness of 18ppm and carbon hard...
-
Stationary Engineer Exam Questions and Answers Latest 2024-2025 (GRADED A+)
- Exam (elaborations) • 63 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
Stationary Engineer Exam Questions and Answers Latest (GRADED A+) How much clearance from the top of the boiler is needed for a HP boiler that 
produces 70000 lbs of steam? - Answer 7 feet 
On a gas fired boiler what is the proper gas to air mixture - Answer 30%-70% and 
in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 
remember% 
What is the total hardness in a system that was found to have calcium hardness 
of 60ppm and magnesium hardness of 18ppm and carbon hardness of 1...
-
ABSA 4b Exam Latest Version.
- Exam (elaborations) • 134 pages • 2024
-
- $25.98
- + learn more
ABSA 4b Exam Latest Version. 
 
Warm Air Heating System Equipment 
In a warm air heating system the cold air return registers 
are located 
a) in exterior walls 
b) in interior locations 
c) under windows 
d) in floors 
e) in ceilings 
B 
The major disadvantage of an electric resistance coil furnace 
for warm air heating is 
a) the high cost of electricity 
b) the danger from electric shock 
c) the high cost of maintenance 
d) the large size of the furnace 
e) the location of electrical wiring 
...
-
Oil Burner License Exam Questions and Answers, Latest Updated 2024/2025 (Verified Answers)
- Exam (elaborations) • 20 pages • 2024
-
Available in package deal
-
- $14.99
- + learn more
What is the first thing a tech should do when arriving at a no combustion call? - AnswerAsk how many times the customer reset the unit. 
What is the best long term solution for preventing a clogged nozzle? - Answer- -Remove 
any underground storage tanks. 
-Install a quality oil filter. 
-Cut the suction line 10" above the tank outlet to prevent sludge. 
Hot water and steam valves are interchangeable. - Answer- False 
When in the presence of a flame, a cad cell normally reads.. - Answer- 300-10...
Too much month left at the end of the money?
-
ABSA 4B Exam Questions with 100% Correct Answers 2024/2025
- Exam (elaborations) • 193 pages • 2024
- Available in package deal
-
- $16.49
- + learn more
ABSA 4B Exam Questions with 100% 
Correct Answers 2024/2025 
- answerWarm Air Heating System Equipment 
In a warm air heating system the cold air return registers 
are located 
a) in exterior walls 
b) in interior locations 
c) under windows 
d) in floors 
e) in ceilings - answerB 
The major disadvantage of an electric resistance coil furnace 
for warm air heating is 
a) the high cost of electricity 
b) the danger from electric shock 
c) the high cost of maintenance 
d) the large size of the fur...
-
ABSA 4b Exam Questions and Answers 100% Pass
- Exam (elaborations) • 235 pages • 2024
-
- $15.49
- + learn more
ABSA 4b Exam Questions and Answers 100% Pass 
Warm Air Heating System Equipment 
In a warm air heating system the cold air return registers 
are located 
a) in exterior walls 
b) in interior locations 
c) under windows 
d) in floors 
e) in ceilings - Answer- B 
The major disadvantage of an electric resistance coil furnace 
for warm air heating is 
a) the high cost of electricity 
b) the danger from electric shock 
c) the high cost of maintenance 
d) the large size of the furnace 
e) the location...
-
Oil Burner License Exam Questions With Complete Solutions.
- Exam (elaborations) • 15 pages • 2024
-
- $15.49
- + learn more
Oil Burner License Exam Questions With Complete Solutions. 
 
What is the first thing a tech should do when arriving at a no combustion call? 
Ask how many times the customer reset the unit. 
What is the best long term solution for preventing a clogged nozzle? 
-Remove any underground storage tanks. 
-Install a quality oil filter. 
-Cut the suction line 10" above the tank outlet to prevent sludge. 
Hot water and steam valves are interchangeable. 
False 
When in the presence of a flame, a cad ce...
-
ABSA 4b Exam Questions and Answers 100% Pass
- Exam (elaborations) • 235 pages • 2024
-
- $16.49
- + learn more
ABSA 4b Exam Questions and Answers 100% Pass 
Warm Air Heating System Equipment 
In a warm air heating system the cold air return registers 
are located 
a) in exterior walls 
b) in interior locations 
c) under windows 
d) in floors 
e) in ceilings - Answer- B 
The major disadvantage of an electric resistance coil furnace 
for warm air heating is 
a) the high cost of electricity 
b) the danger from electric shock 
c) the high cost of maintenance 
d) the large size of the furnace 
e) the location...
-
Stationary Engineer Exam Questions and Answers 100% Pass
- Exam (elaborations) • 57 pages • 2024
-
- $13.49
- + learn more
Stationary Engineer Exam Questions and 
Answers 100% Pass 
How much clearance from the top of the boiler is needed for a HP boiler that produces 
70000 lbs of steam? - Correct Answer ️️ -7 feet 
On a gas fired boiler what is the proper gas to air mixture - Correct Answer ️️ -30%- 
70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 
remember% 
What is the total hardness in a system that was found to have calcium hardness of 
60ppm and magnesium hardness of 18ppm...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia