Topographic layout - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Topographic layout? On this page you'll find 28 study documents about Topographic layout.

Page 2 out of 28 results

Sort by

Basic Electrical Construction Drawings Questions With Complete Solution. Passed!!!
  • Basic Electrical Construction Drawings Questions With Complete Solution. Passed!!!

  • Exam (elaborations) • 7 pages • 2024
  • Basic Electrical Construction Drawings Questions With Complete Solution. Passed!!! B) sectional drawing A cut away view of a building or object is known as ____. A) Detail drawing B) Sectional drawing C) Architectural drawing D) branch circuit drawing B) A ground floor layout of the building Which of the following items is not found on a site plan? A) roads B) A ground floor layout of the building C) Building location D) property lines D) Division 28 In which division of the ...
    (0)
  • $8.49
  • + learn more
DOD Fire Academy ARFF exam questions and 100% correct answers
  • DOD Fire Academy ARFF exam questions and 100% correct answers

  • Exam (elaborations) • 10 pages • 2023
  • 2 types of airports - correct answer controlled and uncontrolled controlled airport - correct answer has a tower that is staffed 24/7 uncontrolled airport - correct answer tower only staffed during the day FOD - correct answer Foreign Object Debris topographic layout - correct answer the key factor in determining the appropriate response route for ARFF apparatus CRFFAA - correct answer Critical Rescue and Fire Fighting Access Area RRA - correct answer Rapid Response Area CRF...
    (0)
  • $13.99
  • + learn more
Urban Exam – Surveying Questions and Answers
  • Urban Exam – Surveying Questions and Answers

  • Exam (elaborations) • 4 pages • 2024
  • Curvilinear Layout - Answer-A subdivision plan prepared for a rolling terrain condition Contour - Answer-Topographic map is a survey plan indicating the elevation and ___________________ of the property 2 meters (1 meter = 200 meters) - Answer-A scale of 1:200 in surveying terms is 1 centimeter is equal to _____ meters Geodetic Survey - Answer-A kind of survey where the shape of the earth is taken into account in computing the results is known as __________________ Tie Line - Answer...
    (0)
  • $10.49
  • + learn more
ARFF Test 2023 with verified answers
  • ARFF Test 2023 with verified answers

  • Exam (elaborations) • 14 pages • 2023
  • two types of airports correct answerscontrolled and uncontrolled controlled airport correct answersHave staffed or manned tower uncontrolled airport correct answersdoes not have a staffed or manned tower Airport Layout correct answersIs the key factor in determining the most appropriate route for ARFF apparatus topographic map correct answersIndicates where the hills, slopes, and low lying areas are -this can assist with identifying fire spread during emergencies grid map corre...
    (0)
  • $13.99
  • + learn more
Purdue PSY 200 Exam 1 Latest Update 100% Pass
  • Purdue PSY 200 Exam 1 Latest Update 100% Pass

  • Exam (elaborations) • 14 pages • 2024
  • Purdue PSY 200 Exam 1 Latest Update 100% Pass Behaviorism Using observable behavior as the basis for studying psychology, without reference to unobservable mental processes Choice Reaction Time time to detect the presentation of a stimulus, make a decision about it and respond Classical Conditioning procedure in which pairing a neutral stimulus with a stimulus that elicits a response leads to the neutral eliciting a similar response pavlov dog Cognitive Models representations of structures o...
    (0)
  • $9.99
  • + learn more
LARE Test 4 Questions With Verified Answers
  • LARE Test 4 Questions With Verified Answers

  • Exam (elaborations) • 60 pages • 2023
  • Available in package deal
  • 1. What demolition activities do you address when converting an abandoned rail line into a walking trail for pedestrians? - Answers Select all that apply (a,b,c,) a. Soil remediation b. Removing creosote railroad ties c. Fly ash and other dust related issues d. Protecting existing vegetation e. Grading old railroad bed to trail standards 2. The party responsible for determining the order of demolition operations is: - Answers (c) a. The general contractor b. The demolition company hire...
    (0)
  • $14.99
  • + learn more
 Basic Electrical Construction Drawings Questions With Complete Solution. Passed!!!
  • Basic Electrical Construction Drawings Questions With Complete Solution. Passed!!!

  • Exam (elaborations) • 7 pages • 2024
  • Basic Electrical Construction Drawings Questions With Complete Solution. Passed!!! B) sectional drawing A cut away view of a building or object is known as ____. A) Detail drawing B) Sectional drawing C) Architectural drawing D) branch circuit drawing B) A ground floor layout of the building Which of the following items is not found on a site plan? A) roads B) A ground floor layout of the building C) Building location D) property lines D) Division 28 In which division of the ...
    (0)
  • $4.09
  • + learn more
CMP 305 EXAM 1 Questions With Revised Answers
  • CMP 305 EXAM 1 Questions With Revised Answers

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • CMP 305 EXAM 1 Questions With Revised Answers What are 3 reasons to survey? - answer-protect owner/builder against costly errors in measurement -esatblish property/building lines -where/how the structure is to be located When are plot plans required? - answerbefore a permit is issued Plot plans show... - answerShows the location of the structure and indicates the distances to property lines Purpose of leveling - answerFor planning and layout Leveling for planning is to... - answerTo es...
    (0)
  • $11.49
  • + learn more
GISP Study Guide with Complete Solutions 2023
  • GISP Study Guide with Complete Solutions 2023

  • Exam (elaborations) • 15 pages • 2023
  • GISP Study Guide with Complete Solutions 2023 Geodatabase - Correct Answer-object oriented spatial model, native data structure for ArcGIS, and is the primary data format used for storing, editing, and managing geographic data. Types of Geodatabases - Correct Answer-Personal, File, Enterprise, workgroup Types of Geodatabase datasets - Correct Answer-Geometric network, network dataset, parcel fabric, terrain dataset, LAS dataset Distance relations - Correct Answer-specifies how far is the...
    (0)
  • $13.99
  • + learn more
NASCLA Accredited Exam - JJ Johnson Contractor Seminar
  • NASCLA Accredited Exam - JJ Johnson Contractor Seminar

  • Exam (elaborations) • 33 pages • 2024
  • What are 4 types of Steel Decking? - Composite, Roof, Cellular, and Form What are the lengths of Full sheets of Steel Decking? - 12", 18", 24", 30", or 36". All are usually less than 40" Who has full responsibility for Safety on a construction site? - The prime contractor Who is responsible to ensure workers have appropriate eye protection? - The employer Safety belt lanyard shall be a minimum of? - 1/2 inch nylon, w/ max length to provide for a fall of no greater than ...
    (0)
  • $13.00
  • + learn more