2 layers 25 strokes Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about 2 layers 25 strokes? On this page you'll find 183 study documents about 2 layers 25 strokes.

Page 3 out of 183 results

Sort by

ACI Certification Exam Questions With Verified Answers, Latest UPDATED 2024/2025 | Scored A+
  • ACI Certification Exam Questions With Verified Answers, Latest UPDATED 2024/2025 | Scored A+

  • Exam (elaborations) • 19 pages • 2024
  • - Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. Answer - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. Answer - 1 degree, 30 degrees to 120 degrees The temperature measuring device shall be calibrated ______ , or whe...
    (0)
  • $15.49
  • + learn more
ACI Concrete- Section 4 Exam All Possible Questions and Answers with complete solution
  • ACI Concrete- Section 4 Exam All Possible Questions and Answers with complete solution

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • The diameter of the tamping rod used in this test method is ________. - Answer-16 mm (5/8") + or - 2 mm (1/16") What is the required shape of the tamping end of the rod - Answer-Rounded to Hemispherical tip What is the required minimum frequency of the vibrator used in this test method? - Answer-9000 vibrations per minute (150Hz) The outside diameter or side dimension of the vibrating element must be at least ______ but not greater than _______. - Answer-19 mm (3/4"), 38 mm (1-1/2") A...
    (0)
  • $7.99
  • + learn more
Michigan's residential builder practice exam with 100% correct answers already graded A+
  • Michigan's residential builder practice exam with 100% correct answers already graded A+

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • Federal unemployment tax All of the following are calculated based on the employees earnings. The employee pays a portion of each except for ________ which is paid entirely by the employer. This system requires more recordkeeping What is a disadvantage of using the accrual method of accounting? 500 If a contractor is FUTA liability exceeds ______ , then FUTA taxes are deposited quarterly. 2 The Good Contractor Co. needs to find there working capital ratio. Their current ...
    (0)
  • $14.99
  • + learn more
ACI Certification Practice Exam
  • ACI Certification Practice Exam

  • Exam (elaborations) • 3 pages • 2023
  • For 4x8 cylinders, how many layers and rod strokes to properly consolidate the concrete? - Answer- 2 layers, 25 strokes For 6x12 cylinders, how many layers and rod strokes to properly consolidate the concrete? - Answer- 3 layers, 25 rod strokes After rodding each layer, the sides of the molds should be tapped 10-15 times with a tapping rod? T/F - Answer- False It should be done with a rubber mallet When rodding the second and/or third layers, the rod must go through the current ;laye...
    (0)
  • $9.99
  • + learn more
ACI Concrete Field-Testing Technician- Grade I Questions and Answers Fully solved 2024
  • ACI Concrete Field-Testing Technician- Grade I Questions and Answers Fully solved 2024

  • Exam (elaborations) • 11 pages • 2024
  • ACI Concrete Field-Testing Technician- Grade I Questions and Answers Fully solved 2024 The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measurin...
    (0)
  • $17.99
  • + learn more
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS | LATEST UPDATED 2024/2025 | SCORED A+
  • ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS | LATEST UPDATED 2024/2025 | SCORED A+

  • Exam (elaborations) • 11 pages • 2024
  • The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - Correct Answer - 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - Correct Answer - 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a qu...
    (0)
  • $13.49
  • + learn more
ACI Certification Practice Exam Questions and Answers 100% Pass
  • ACI Certification Practice Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 5 pages • 2024
  • ACI Certification Practice Exam Questions and Answers 100% Pass For 4x8 cylinders, how many layers and rod strokes to properly consolidate the concrete? - Answer- 2 layers, 25 strokes For 6x12 cylinders, how many layers and rod strokes to properly consolidate the concrete? - Answer- 3 layers, 25 rod strokes After rodding each layer, the sides of the molds should be tapped 10-15 times with a tapping rod? T/F - Answer- False It should be done with a rubber mallet When rodding the second a...
    (0)
  • $11.49
  • + learn more
Michigan's residential builder Exam Study Questions and Answers Graded A 2024
  • Michigan's residential builder Exam Study Questions and Answers Graded A 2024

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • All of the following are calculated based on the employees earnings. The employee pays a portion of each except for ________ which is paid entirely by the employer. - Federal unemployment tax What is a disadvantage of using the accrual method of accounting? - This system requires more recordkeeping If a contractor is FUTA liability exceeds ______ , then FUTA taxes are deposited quarterly. - 500 The Good Contractor Co. needs to find there working capital ratio. Their current assets are $...
    (0)
  • $13.49
  • + learn more
ACI Concrete Field Testing Technician Questions and Correct Answers, With Complete Verified Solution 2024/2025.
  • ACI Concrete Field Testing Technician Questions and Correct Answers, With Complete Verified Solution 2024/2025.

  • Exam (elaborations) • 10 pages • 2024
  • ACI Concrete Field Testing Technician Questions and Correct Answers, With Complete Verified Solution 2024/2025. The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The tempe...
    (0)
  • $12.98
  • + learn more
ACI Concrete Field Testing Technician- Grade I Questions and Correct Answers, With Complete Solution 2024/2025.
  • ACI Concrete Field Testing Technician- Grade I Questions and Correct Answers, With Complete Solution 2024/2025.

  • Exam (elaborations) • 10 pages • 2024
  • ACI Concrete Field Testing Technician- Grade I Questions and Correct Answers, With Complete Solution 2024/2025. The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The tempe...
    (0)
  • $13.38
  • + learn more