A condensate line should - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about A condensate line should? On this page you'll find 193 study documents about A condensate line should.

Page 3 out of 193 results

Sort by

Gas Fitter 2 Practice Test Exam 2024 Questions and Answers.
  • Gas Fitter 2 Practice Test Exam 2024 Questions and Answers.

  • Exam (elaborations) • 91 pages • 2024
  • Gas Fitter 2 Practice Test Exam 2024 Questions and Answers. A room heater installed in either a sleeping area or public area shall be: A. direct vent only B. equipped with a regulator C. equipped with a fan D. equipped with an on / off switch on the wall - correct answer -B What type of vent must be used when the vent of a wall furnace will be concealed in a partition wall? A. B vent B. L vent C. BH vent D. BW vent - correct answer -D Single wall vent connectors: A. may pass through ...
    (0)
  • $12.99
  • + learn more
3rd Class Stationary Steam Engineer  License Prep
  • 3rd Class Stationary Steam Engineer License Prep

  • Exam (elaborations) • 29 pages • 2024
  • 3rd Class Stationary Steam Engineer License Prep ________ are necessary for complete combustion - time, temperature, mixture, and atomization if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 214.7 a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi - 12 an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo- generator - steam turbine a boi...
    (0)
  • $9.99
  • + learn more
3rd class stationary steam engineer license prep Questions and Answers 100% Pass
  • 3rd class stationary steam engineer license prep Questions and Answers 100% Pass

  • Exam (elaborations) • 23 pages • 2024
  • 3rd class stationary steam engineer license prep Questions and Answers 100% Pass _________ are necessary for complete combustion - Correct Answer ️️ -time, temperature, mixture, and atomization if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - Correct Answer ️️ -214.7 a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi - Correct Answer ️️ -12 an oil cooler is commonly used with ...
    (0)
  • $12.49
  • + learn more
Gas Fitter 2 Practice Test Exam 2024 Questions and Answers.
  • Gas Fitter 2 Practice Test Exam 2024 Questions and Answers.

  • Exam (elaborations) • 91 pages • 2024
  • Gas Fitter 2 Practice Test Exam 2024 Questions and Answers. A room heater installed in either a sleeping area or public area shall be: A. direct vent only B. equipped with a regulator C. equipped with a fan D. equipped with an on / off switch on the wall - correct answer -B What type of vent must be used when the vent of a wall furnace will be concealed in a partition wall? A. B vent B. L vent C. BH vent D. BW vent - correct answer -D Single wall vent connectors: A. may pass through ...
    (0)
  • $12.99
  • + learn more
Stationary Engineer Exam Questions and Answers Latest 2024-2025 (GRADED A+)
  • Stationary Engineer Exam Questions and Answers Latest 2024-2025 (GRADED A+)

  • Exam (elaborations) • 63 pages • 2024
  • Available in package deal
  • Stationary Engineer Exam Questions and Answers Latest (GRADED A+) How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - Answer 7 feet On a gas fired boiler what is the proper gas to air mixture - Answer 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm and carbon hardness of 1...
    (0)
  • $15.49
  • + learn more
INTERNACHI EXAM 2024 |238 QUESTIONS | WITH COMPLETE SOLUTIONS, SCORED A+
  • INTERNACHI EXAM 2024 |238 QUESTIONS | WITH COMPLETE SOLUTIONS, SCORED A+

  • Exam (elaborations) • 60 pages • 2024
  • INTERNACHI EXAM 2024 |238 QUESTIONS | WITH COMPLETE SOLUTIONS, SCORED A+
    (0)
  • $31.99
  • + learn more
DC Third testing questions with correct answers
  • DC Third testing questions with correct answers

  • Exam (elaborations) • 21 pages • 2024
  • DC Third testing questions with correct answers The component in which liquid vapor by absorbing heat is called? -Correct Answer-Evaporator Select the best answer electrical grounding method? -Correct Answer-Metal stake drive 8 foot into the ground. A _____ valve should be used for throttling purpose? -Correct Answer-Globe What is the acceptable range for residual sodium sulfite in the boiler maintain? -Correct Answer-30-70 What is the BTU content of a gallon of #4? -Correct Answer-...
    (0)
  • $10.49
  • + learn more
Stationary Engineer License Exam Prep - Complete Solutions (Answered)
  • Stationary Engineer License Exam Prep - Complete Solutions (Answered)

  • Exam (elaborations) • 40 pages • 2024
  • Stationary Engineer License Exam Prep - Complete Solutions (Answered) The pressure sensitive device attached to a fan housing is called a a. pressuretrol b. aquastat c. thermostat d. vaporstat Draft is measured in a) ounces per square inch b) inches of water c) inches of mercury d) pounds per square inch Which of the following is used to measure temperature? a. fyrite analyzer b. vaporstat c. orsat analyzer d. pyrometer The main stop valve is located on the a) oil supply line b) condensate bre...
    (0)
  • $26.49
  • + learn more
3rd class stationary steam engineer license prep Questions and Answers 100% Pass
  • 3rd class stationary steam engineer license prep Questions and Answers 100% Pass

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • 3rd class stationary steam engineer license prep Questions and Answers 100% Pass _________ are necessary for complete combustion - Correct Answer ️️ -time, temperature, mixture, and atomization if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - Correct Answer ️️ -214.7 a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi - Correct Answer ️️ -12 an oil cooler is commonly used with ...
    (0)
  • $12.49
  • + learn more
Gas Fitter 2 Practice Test Questions And Answers 100% Verified
  • Gas Fitter 2 Practice Test Questions And Answers 100% Verified

  • Exam (elaborations) • 84 pages • 2024
  • Gas Fitter 2 Practice Test Questions And Answers 100% Verified A room heater installed in either a sleeping area or public area shall be: A. direct vent only B. equipped with a regulator C. equipped with a fan D. equipped with an on / off switch on the wall - answerB What type of vent must be used when the vent of a wall furnace will be concealed in a partition wall? A. B vent B. L vent C. BH vent D. BW vent - answerD Single wall vent connectors: A. may pass through floors, ceiling...
    (0)
  • $14.49
  • + learn more