Accumulated inadvertent - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Accumulated inadvertent? On this page you'll find 75 study documents about Accumulated inadvertent.

Page 3 out of 75 results

Sort by

KNOWN NERC EXAM QUESTIONS: From Class
  • KNOWN NERC EXAM QUESTIONS: From Class

  • Exam (elaborations) • 6 pages • 2023
  • KNOWN NERC EXAM QUESTIONS: From Class A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A...
    (0)
  • $9.99
  • + learn more
NERC book quiz questions | updated 2024
  • NERC book quiz questions | updated 2024

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • NERC book quiz questions | updated 2024 You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minu...
    (0)
  • $9.49
  • + learn more
NERC Interchange Transaction Exam (100% Correct Answers)
  • NERC Interchange Transaction Exam (100% Correct Answers)

  • Exam (elaborations) • 17 pages • 2023
  • Generating units jointly owned by two or more Balancing Authorities may be modeled in the AGC systems as a "virtual" tie line flow (pseudo-tie). To properly account for the jointly owned unit as a pseudo-tie, each Balancing Authority must include a portion o fthe unit's MW output as an adjustment to the ________ in its ACE equation. net actual interchange (NIA) A dynamic schedule is commonly used for scheduling jointly-owned generation between Balancing Authority Areas. To properly acco...
    (0)
  • $12.49
  • + learn more
NERC book quiz questions answered with complete solution
  • NERC book quiz questions answered with complete solution

  • Exam (elaborations) • 14 pages • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - correct answer -4MW Net actual interchange minus Net scheduled interchange is what? - correct answer Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after ...
    (0)
  • $3.99
  • + learn more
 NERC book Quiz Questions and Answers 2023-2024 Graded A
  • NERC book Quiz Questions and Answers 2023-2024 Graded A

  • Exam (elaborations) • 13 pages • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at ...
    (0)
  • $12.49
  • + learn more
EPRI Terms & Definitions (A-E)| 193 QUESTIONS| WITH COMPLETE SOLUTIONS
  • EPRI Terms & Definitions (A-E)| 193 QUESTIONS| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 19 pages • 2022
  • ACCELERATING POWER correct answer: In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical outputPOWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATORmust have accelerating POWER. ACCUMULATED INADVERTENT correct answer: The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of aBALANCING AUTHORITY represents the amount of excess ENERGY a BALANCING AUTHORITY haseither supplied to the INTERCONNECTION or...
    (0)
  • $10.49
  • + learn more
 NERC book Quiz Questions and Answers 2023-2024 Graded A
  • NERC book Quiz Questions and Answers 2023-2024 Graded A

  • Exam (elaborations) • 13 pages • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at ...
    (0)
  • $11.49
  • + learn more
NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS
  • NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS

  • Exam (elaborations) • 13 pages • 2022
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? correct answer: -4MW Net actual interchange minus Net scheduled interchange is what? correct answer: Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after mi...
    (1)
  • $10.49
  • + learn more
NERC BOOK QUIZ|QUESTIONS| WITH COMPLE SOLUTIONS 100% VERIFIED
  • NERC BOOK QUIZ|QUESTIONS| WITH COMPLE SOLUTIONS 100% VERIFIED

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NERC BOOK QUIZ|QUESTIONS| WITH COMPLE SOLUTIONS 100% VERIFIED You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - answer-4MW Net actual interchange minus Net scheduled interchange is what? - answerInadvertent interchange Suppose your interconnection ...
    (0)
  • $12.49
  • + learn more
KNOWN NERC EXAM QUESTIONS: From Class Already Passed
  • KNOWN NERC EXAM QUESTIONS: From Class Already Passed

  • Exam (elaborations) • 16 pages • 2023
  • KNOWN NERC EXAM QUESTIONS: From Class Already Passed A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? ...
    (0)
  • $9.49
  • + learn more