Aia contract Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Aia contract? On this page you'll find 230 study documents about Aia contract.

Page 3 out of 230 results

Sort by

CDT Exam Questions And Correct  Answers
  • CDT Exam Questions And Correct Answers

  • Exam (elaborations) • 82 pages • 2023
  • CDT Exam Questions And Correct Answers Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCP...
    (0)
  • $15.49
  • + learn more
CONS LAW Exam Questions with Correct Answers
  • CONS LAW Exam Questions with Correct Answers

  • Exam (elaborations) • 26 pages • 2024
  • CONS LAW Exam Questions with Correct Answers Which group does not have their own standard form construction contracts? A. American Institute of Architects (AIA) B. Associated General Contractors of America (AGC) C. American Institute of Constructions (AIC) D. The Engineers Joint Contract Documents Committee (EJCDC) - Answer-American Institute of Constructions (AIC) A contract ______________________ . (Select one) A. cannot be formed by actions alone B. must be a written document ...
    (0)
  • $13.39
  • + learn more
Professional Practice 482 / 582 Second Half UB ARC Pro Practice Questions With Complete Solutions
  • Professional Practice 482 / 582 Second Half UB ARC Pro Practice Questions With Complete Solutions

  • Exam (elaborations) • 16 pages • 2023
  • AIA Document C-401 refers to: correct answer: C. Architect-Consultant Agreement According to AIA Document C-401, The General Provisions (Articles 1.1 & 1.2), provide the following clarifications of the contract (Choose the one (1) which does not apply): correct answer: B. The architect can require the consultant to do whatever they believe is necessary. According to AIA Document C-401 (1.5), except as otherwise authorized by the Architect, all communications between the Consultant and th...
    (0)
  • $12.99
  • + learn more
DBIA 175 Exam Study Guide Questions with Complete Solutions
  • DBIA 175 Exam Study Guide Questions with Complete Solutions

  • Exam (elaborations) • 28 pages • 2024
  • DBIA 175 Exam Study Guide Questions with Complete Solutions DBIA Document 580 - Teaming Agreement - Correct Answers Between Design-Builder and teaming party Components of Teaming Agreement - Correct Answers qualifications, insurance, matrix of responsibilities, confidentiality and exclusivity, payment of stipend/honoarrium URS CORP v TRANSPO - does teaming agreement waiver survive if subcontract supersedes teaming agreement? - Correct Answers yes. subcontract was silent, waiver in prime f...
    (0)
  • $10.49
  • + learn more
CNST 2341 fInal  Questions With 100% Correct Answers!!
  • CNST 2341 fInal Questions With 100% Correct Answers!!

  • Exam (elaborations) • 37 pages • 2024
  • Available in package deal
  • `serve as one point of responsibility to who? - the owner `The 3 method of payment are ? - 1. Lump Sum 2. Unit price 3. Cost Plus `total float or simply "float" is also referred to as a what - "slack" `With OCIPs and CCIPs the disadvantages of the programs includes what? - increased administration burden by the owner or contractor `With Sole Proprietorship type of business entity, any debt that exceeds the company's assets must what? - Be paid for with private the owner. A certifi...
    (0)
  • $7.99
  • + learn more
CDT Exam questions and Answers 100%  Correct
  • CDT Exam questions and Answers 100% Correct

  • Exam (elaborations) • 53 pages • 2024
  • Available in package deal
  • CDT Exam questions and Answers 100% Correct Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
    (0)
  • $18.49
  • + learn more
CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version
  • CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 65 pages • 2024
  • Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14. - Answer: C - Contractor. Safety provisi...
    (0)
  • $12.99
  • + learn more
CDT Test Questions 2024 Graded A+
  • CDT Test Questions 2024 Graded A+

  • Exam (elaborations) • 33 pages • 2024
  • CDT Test Questions 2024 Graded A+ 1. What establishes the relationship between the Contractor and the Architect/Engineer (A/E)? A - National laws B - Signed agreements C - Third-party obligations D - Special conditions - ANSWERSAnswer: C - Third-party obligations. The Contractor and the A/E do not have any signed agreements, the general terms and conditions of their respective contracts with the Owner provide them with third party obligations to each other. Reference: See PDPG Sect...
    (0)
  • $10.99
  • + learn more
CDT Exam Questions | 100% Correct Answers |  Verified | Latest 2024 Version
  • CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 65 pages • 2024
  • CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10...
    (0)
  • $12.33
  • + learn more
CDT Practice Exam Final questions and  answers A-graded
  • CDT Practice Exam Final questions and answers A-graded

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • CDT Practice Exam Final questions and answers A-graded Which of these documents, might we find in the Project Manual but they are not contract documents? (A) The Agreement (B) Procurement Documents (C) Addendum (D) Supplemental Conditions - CORRECT ANSWER-Answer: B Reference: PDPG 11.1.6 Explanation: Procurement requirements are addressed to prospective bidders or proposers interested in the project. Although not necessarily part of a contract, the procurement requirements are usua...
    (0)
  • $17.49
  • + learn more