Asme test - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Asme test? On this page you'll find 618 study documents about Asme test.
Page 3 out of 618 results
Sort by
-
NCCCO Core + Specialty Test Prep Questions with Correct Answers 2024/2025
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
NCCCO Core + Specialty Test Prep Questions with Correct Answers 2024/2025 
ASME B30.5 - Correct Answers Mobile and Locomotive cranes, all types 
 
ASME B30.3 - Correct Answers Tower Cranes 
 
ASME B30.23 - Correct Answers Personel Lifting Regs 
 
OSHA 29 CFR 1926.1400 Series - Correct Answers Cranes & Derrick's used in Construction regs. 
 
Rotation Resistant Wire Rope - Correct Answers 2 randomly broken wires in 6 diameters. 
 
4 randomly broken wires in 30 diameters. 
 
Safety factor 5.0 
 
...
-
Tower Crane Practice Test Exam (questions and answers)
- Exam (elaborations) • 9 pages • 2024
-
- $11.99
- + learn more
Tower Crane Practice Test Exam 
(questions and answers) 
Which of the following OSHA regulations govern suspended personnel platforms? - 
CORRECT ANSWER-b) OSHA 1926.1431 
(OJO) According to ASMR B30.3, the prohibited zone for power lines that are 60 kV is: - 
CORRECT ANSWER-c) 15 ft. 
According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of: 
- CORRECT ANSWER-d) 5 to 1 
According to ASME B30.3, on whose recommendations should a preventative 
maintenance program ...
-
API 1169 Questions and Answers 100% Pass
- Exam (elaborations) • 28 pages • 2024
-
- $10.49
- + learn more
Which of the following equipment may NOT be required for a pressure test? internal line 
clamps 
before testing begins, a ________ with explanatory notes and data should be prepared 
pressure test procedure 
the pressure testing of newly constructed liquid pipelines and replaced segments of existing 
pipelinesshould be performed in accordance with ASME B31.4, 49 Code of Federal 
Regulations, Part 195 and any other applicable governmental 
regulations. 
Before the actual line filling operation, i...
-
TOWER CRANE EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS RATED 100% CORRECT
- Exam (elaborations) • 15 pages • 2024
-
Available in package deal
-
- $10.99
- + learn more
TOWER CRANE EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS RATED 100% CORRECT 
OSHA 1926.550 
Which of the following osha regulations govern suspended personal platforms 
15 feet 
According to ASME B30.3 the prohibited zone for power lines that are 60KV is... 
5 to 1 
Load hoist rotation wire rope according to ASME B30.3 has a design factor of 
5 to 1 
According to ASME B30.3 when lifting a suspended personnel platform the design factor for the rigging hardware is 
5 to 1 
ASME B30.3 load ho...
-
NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
NCCCO TWR Practice Test Study Guide 
Exam with 100% Verified Answers 
1. Which of the following OSHA regulations govern suspended personnel platforms? - 
CORRECT ANSWER-OSHA 1926.550(g) 
2. According to ASME B30.3, the prohibited zone for power lines that are 60kV is? - 
CORRECT ANSWER-15ft 
3. According to ASME B30.3, load hoist rotation resistant wire rope has a design factor 
of? - CORRECT ANSWER-5 to 1 
4. According to ASME B30.3, when lifting a suspended personnel platform the design 
fa...
And that's how you make extra money
-
API 570 Study Guide (Full) Questions and Answers Rated A+
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
API 570 Study Guide (Full) Questions 
 
and Answers Rated A+ 
 
Pressure applied inside a pipe creates stress in the pipe wall. These stresses are highest on which 
weld orientation? longitudinal weld 
 
Per B31.3, how much RT is conducted on circumferential welds of a pipe in normal service? 
10% 
 
for welded pipe, the normal thickness of under-tolerance is? .010 or 10 mils 
 
The corrosiveness of soils can be determined by measuring the soils: Resistivity 
 
when qualifying a weld procedure t...
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
- Exam (elaborations) • 16 pages • 2024
-
Available in package deal
-
- $14.49
- + learn more
Splices in rall tracks shall have - ANSWER Smooth Joints 
Hydraulic systems should have their proper fluid level checked - ANSWER Daily 
If power fails during operations, the following shouldn't apply - ANSWER Do your best to 
finish moving load where it was designated to go 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing instructions be kept - ANSWER ...
-
Mark's API 510 STUDY GUIDE with 100% Complete Solutions
- Exam (elaborations) • 107 pages • 2024
-
- $14.49
- + learn more
Mark's API 510 STUDY GUIDE with 
100% Complete Solutions 
Which of the following activities is NOT included in the scope of API 510? 
- A) rerating a vessel 
- B) Operating a vessel. 
- C) replacing a vessel head 
- D) internally inspecting a vessel - Answer- B 
Which of the following activities is NOT included in the scope of API 510? 
- A) setting relief device intervals 
- B) performing vessel alterations 
- C) Performing vessel fabrication 
- D) performing vessel maintenance - Answer- C 
Wh...
-
Tower Crane Questions and Answers NCCCO Practice Exam Latest
- Exam (elaborations) • 9 pages • 2024
-
- $12.99
- + learn more
Tower Crane Questions and Answers 
NCCCO Practice Exam Latest 
Which of the following OSHA regulations govern suspended personnel platforms? - 
CORRECT ANSWER-OSHA 1926.1431 
According to ASME B30.3 The prohibited zone for power lines that are 60 kV is - 
CORRECT ANSWER-15 ft 
According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of - 
CORRECT ANSWER-5 to 1 
According to ASME B30.3 when Lifting a suspended personnel platform design factor 
for the rigging hardwar...
-
TOWER CRANE QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 15 pages • 2024
-
- $9.99
- + learn more
TOWER CRANE QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS 
 
Which of the following OSHA regulations govern suspended personnel platforms? 
OSHA 1926.1431 
According to ASME B30.3 The prohibited zone for power lines that are 60 kV is 
15 ft 
According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of 
5 to 1 
According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardware is 
5 to 1 
According to ASME B30.3 Load hoist ropes t...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia