Bmps swppp - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Bmps swppp? On this page you'll find 49 study documents about Bmps swppp.
Page 3 out of 49 results
Sort by
-
Cesswi Exam (Questions and Answers)
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
Certified erosion sediment and stormwater inspector - Answer-CESSWI 
Offers no mitigation - Answer-Ignorance 
Controls water pollution by regulating point sources that discharge pollutants into waters of the US - 
Answer-NPDES National pollutant discharge elimination system 
MS4 - Answer-Municipal Separate Storm Sewer System 
ESCP - Answer-Erosion and sediment control plan 
Has regulatory authority over the cwa - Answer-EPA 
Return flow from irrigated agriculture or their run off - Answer-Does n...
-
CESSWI PART I QUESTIONS AND ANSWERS GUARANTEED A+
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
CESSWI PART I QUESTIONS AND ANSWERS GUARANTEED A+ 
CESSWI is qualified to preform what inspections? 
Construction, post construction, industrial, MS4 
 
 
 
Clean Water Act year of creation and intent of law 
1972, enacted to restore and maintain the physical, bio, chem integrity of the waters of the US 
 
 
 
 
Brainpower 
Read More 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
0:07 
/ 
0:15 
Full screen 
CWA Section 402 
Est. NPDES System, originally focused on ind...
-
Cesswi 2 Questions with correct Answers, Graded A+
- Exam (elaborations) • 7 pages • 2023
-
Available in package deal
-
- $18.49
- + learn more
Cesswi 2 Questions with correct Answers, Graded A+ 
Temporary stabilization 
stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 
 
 
 
5 types of plans 
1. SWPPP 
2. erosion and sed. plan (ESCP) 
3. drainage plan/grading plan 
4. spill prevention control and countermeasure plan (SPCC) 
5. MS4 stormwater management plan/program (SWMP) 
 
 
 
SWPPP 
-required by NPDES for industrial, multi sector, and cons...
-
CESSWI Certification - PART 1 Questions and Answers 2023
- Exam (elaborations) • 29 pages • 2023
-
Available in package deal
-
- $19.99
- + learn more
CESSWI Certification - PART 1 Questions and Answers 2023 
CESSWI Certification 
Identifies Professional with a comprehensive knowledge and understanding of erosion, sediment and stormwater regulations. 
 
 
 
Certified inspectors 
Recognized by state and federal regulators as qualified professionals in their fields 
 
 
 
NPDES 
National Pollutant Discharge Elimination System 
 
 
 
Regulations Governing Erosion and Sediment Control and Stormwater 
The Clean Water Act (CWA) 
National Pollutant D...
-
QSP Exam questions with complete solution
- Exam (elaborations) • 11 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
QSP Exam questions with complete solution 
When does the CGP apply? - Correct Answers-Any construction or demolition of one acre or more 
 
Activities under the CGP include: 
a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. 
b. Disturbances to land surfaces solely related to agricultural operations. 
c. Clearing and grading 2 acres of land 
d. Discharges of storm water from areas on tribal lands. - Correct Answers-C 
 
TRUE OR ...
Too much month left at the end of the money?
-
CESSWI Part 2 Questions with solutions 2023
- Exam (elaborations) • 27 pages • 2023
-
Available in package deal
-
- $18.49
- + learn more
CESSWI Part 2 Questions with solutions 2023 
Existing Veg, Desc/Purp 
temp or perm bmp desi to stab soil and remove sups part from sheet flow runoff. 
 
 
 
Existing Veg, Objectives 
1) Site Plan and Mang 
2) Erosi Cont 
3) Sedi Cont 
4) Post-Cons Mang 
 
 
 
Existing Veg, applic 
1) Areas within site where no const activity is occur 
2) Areas where local, state and fed govt require preservation 
3) Areas where existing veg can be utilized for eros, sedi, and storm water quality. 
 
 
 
Existing...
-
Cesswi 2 Study Questions With Complete Solutions
- Exam (elaborations) • 12 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
Temporary stabilization correct answer: stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 
 
5 types of plans correct answer: 1. SWPPP 
2. erosion and sed. plan (ESCP) 
3. drainage plan/grading plan 
4. spill prevention control and countermeasure plan (SPCC) 
5. MS4 stormwater management plan/program (SWMP) 
 
SWPPP correct answer: -required by NPDES for industrial, multi sector, and construction gen...
-
CESSWI, Part 1 Questions and Answers Latest Updated 2024
- Exam (elaborations) • 5 pages • 2024
-
Available in package deal
-
- $15.99
- + learn more
CESSWI, Part 1 Questions and Answers Latest Updated 2024 
Water Quality Standards 
State or tribal requirements that define the water quality goals of a water body by designating the beneficial uses and setting criteria to protect those uses 
 
 
 
CWA Section 401 
Regulates water quality impacts and state certification programs. Required for any permit or license issues by a federal agency for any activity that may result in a discharge to waters of the U.S. 
 
 
 
 
CWA Section 402 
Establishe...
-
QSP ACTUAL EXAM WITH QUESTIONS AND WELL VERIFIED ANSWERS [ALREADY GRADED A+] REAL EXAM!! REAL EXAM!!!
- Exam (elaborations) • 15 pages • 2024
-
- $18.49
- + learn more
QSP ACTUAL EXAM WITH QUESTIONS AND WELL 
VERIFIED ANSWERS [ALREADY GRADED A+] REAL 
EXAM!! REAL EXAM!!! 
TRUE OR FALSE: if construction of an LUP will occur across several properties, 
the utility company, municipality, or other public/private company/agency that 
owns or operates the LUP project is responsible for obtaining coverage - 
ANS--True 
When does the CGP apply? - ANS--Any construction or demolition of 
one acre or more 
Activities under the CGP include: 
a. Routine maintenance t...
-
WM Inspector OTHER Questions With 100% Correct Answers.
- Exam (elaborations) • 5 pages • 2024
-
- $7.99
- + learn more
Activities exempt from CBPA (p.7) - Answer--permitted surface or deep mining, oil and gase 
operations 
-clearing of lands for agriculture, forestry, etc. 
-single family residential less than 1 acre (w/ exceptions) 
-discharges to sanitary sewer or combined sewer system 
-activities to turn abandon properties into agricultural 
-routine maintenance, etc. 
-land-disturbing activities in response to public emergency 
Construction GP Operator meets either of these two criteria (p.8) - Answer-1. Di...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia