Construction documents - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Construction documents? On this page you'll find 3878 study documents about Construction documents.

Page 3 out of 3.878 results

Sort by

LARE EXAM 1(2023-2024)Questions and Answers 100% Correct
  • LARE EXAM 1(2023-2024)Questions and Answers 100% Correct

  • Exam (elaborations) • 34 pages • 2023
  • LARE EXAM 1()Questions and Answers 100% CorrectLARE EXAM 1()Questions and Answers 100% CorrectLARE EXAM 1()Questions and Answers 100% CorrectLARE EXAM 1()Questions and Answers 100% Correct Outline the business relationships between the three principal parties that are involved in a landscape construction project (Their obligations) - ANSWER1. Owner/ client - initiate the project ; signs separate contracts for completion, & responsible for funding design & construction 2. Contractor - hired ...
    (0)
  • $12.99
  • 1x sold
  • + learn more
CON 2370 Simplified Acquisition Procedures Exam Questions And Answers
  • CON 2370 Simplified Acquisition Procedures Exam Questions And Answers

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • CON 2370 Simplified Acquisition Procedures Exam Questions And Answers You are the buyer for a construction requirement with an estimated value of $75,000. A notice of the proposed contract action is required.Which one of the following solicitation methods must be used? - ANS Written Solicitation Which one of the following statements is true regarding the policies for the use of simplified acquisition procedures (SAP)? - ANS NOT Award documentation must be extensive and detailed ...
    (0)
  • $11.49
  • 2x sold
  • + learn more
Solutions Manual for Construction Jobsite Management 4th Edition by William R. Mincks; Hal Johnston Chapter 1-18 Complete Guide Solutions Manual for Construction Jobsite Management 4th Edition by William R. Mincks; Hal Johnston Chapter 1-18 Complete Guide
  • Solutions Manual for Construction Jobsite Management 4th Edition by William R. Mincks; Hal Johnston Chapter 1-18 Complete Guide

  • Exam (elaborations) • 53 pages • 2023
  • Solutions Manual for Construction Jobsite Management 4th Edition by William R. Mincks; Hal Johnston Chapter 1-18 Complete Guide 2897, 7 1: Introduction to Project Management2: The Project Team3: Use of Construction Documents on the Jobsite4: Submittals, Samples, and Shop Drawings5: Documentation and Record Keeping at the Jobsite6: Jobsite Layout and Control7: Meetings, Negotiations, and Dispute Resolution8: Jobsite Labor Relations and Control9: Personnel and Safety Management10: Subcontrac...
    (1)
  • $35.49
  • 3x sold
  • + learn more
COSC 253 - Exam 1 || A+ Guaranteed.
  • COSC 253 - Exam 1 || A+ Guaranteed.

  • Exam (elaborations) • 6 pages • 2024
  • Buildings account for ___________ to _____________ percent of the world's energy use correct answers 1/3 to 1/2 one simple definition of _____________ is building to meet the needs of the present generation without compromising the ability of future generations to meet their needs correct answers sustainability a _________-_______-__________ life cycle analysis (LSA) begins with materials extraction by extends only as far as when the material leaves the factory correct answers cradle-to-g...
    (1)
  • $10.69
  • 1x sold
  • + learn more
CON 2370 Simplified Acquisition Procedures Take 14 | Questions and 100% Correct Answers | Professor Verified
  • CON 2370 Simplified Acquisition Procedures Take 14 | Questions and 100% Correct Answers | Professor Verified

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • CON 2370 Simplified Acquisition Procedures Take 14 | Questions and 100% Correct Answers | Professor Verified You are reviewing the requirements package for the purchase of lab equipment for a health clinic that does not exceed the SAT. It must be compatible with the equipment currently being used at the clinic. This is essential in meeting the agency's needs. Market research identified only one manufacturer able to meet the requirement for compatible equipment. Which one of the following ...
    (1)
  • $18.99
  • 2x sold
  • + learn more
ICC Masonry Exam All Possible Questions and Answers with complete solution
  • ICC Masonry Exam All Possible Questions and Answers with complete solution

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • Which of the following is the standard specification for loadbearing concrete masonry units? - ASTM C 90; RCMCI 6th Edition, Section 2.2.1 Which of the following grout admixtures is used to obtain a high slump with reduced water? - Super plasticizer; RCMCI 6th Edition, Section 2.11.6 Which of the following is the standard specification that autoclaved aerated concrete masonry units must conform to for the strength class specified in the contract documents? - ASTM C 1386; CI 530; Part 2, Se...
    (0)
  • $7.29
  • 1x sold
  • + learn more
FDOT Asphalt Paving Level 2 Questions With Complete Solutions.
  • FDOT Asphalt Paving Level 2 Questions With Complete Solutions.

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • What makes up a quality asphalt mixture? - A quality asphalt mixture is determined by the constructability, if it conforms to Specifications, and if it satisfies functional requirements. CQC - contractor quality control Superpave - Asphalt mix design system since 1998 QCP - Quality control plan QCM - Quality control Manual QC - Quality Control (Contracting Testing and Inspection) VT - Verification Testing (FDOT or CEI Verification) CEI - Construction Engineering and Inspection RT - Reso...
    (0)
  • $7.99
  • 1x sold
  • + learn more
WMGT 322 Question and answers correctly solved 2024/2025
  • WMGT 322 Question and answers correctly solved 2024/2025

  • Exam (elaborations) • 7 pages • 2024
  • WMGT 322 Question and answers correctly solved 2024/2025 WMGT 322 (From the Initial Stages of Project Development) Which of the following could be considered stakeholders for a Civil Engineer project? Select ALL that apply. - correct answer Contracting Officer Facility User Communications Squadron Representative Airfield Manager (From the Initial Stages of Project Development) Which of the following documents could be considered part of the project record? Select ALL that apply. - co...
    (0)
  • $17.99
  • 1x sold
  • + learn more
IREM – CPM Exam Questions & Answers 2023/2024
  • IREM – CPM Exam Questions & Answers 2023/2024

  • Exam (elaborations) • 43 pages • 2023
  • IREM – CPM Exam Questions & Answers 2023/2024 The California Hills, a PUD outside of Riverside, Calif., has completed three off our phases of development. There are currently 65 owned units. The final phase of the development will build out 25 more units. What type of management would best serve this community? - ANSWER-This community presents a complex management challenge that may best be met with full agency management services. If this CID is still under developer control they may be ...
    (0)
  • $12.99
  • 2x sold
  • + learn more
CTS-I Exam Questions & Answers 2023/2024
  • CTS-I Exam Questions & Answers 2023/2024

  • Exam (elaborations) • 12 pages • 2023
  • CTS-I Exam Questions & Answers 2023/2024 Before developing a project plan, it is important to (CH3) - ANSWER-have a clear understanding of the scope of work A scope statement should include: (CH3) - ANSWER-Both in-scope and out-of-scope items The key elements of a project should be driven by: (CH3) - ANSWER-the client's need What is a dependency within a project task schedule? (CH3) - ANSWER-A task that cannot begin before another task has been completed Project budget refers t...
    (0)
  • $9.49
  • 1x sold
  • + learn more