Cslb test 5 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cslb test 5? On this page you'll find 125 study documents about Cslb test 5.

Page 3 out of 125 results

Sort by

CSLB C10 TEST 1 / 120+ QUESTIONS AND CORRECT ANSWERS 2023/2024 / GRADED A+.
  • CSLB C10 TEST 1 / 120+ QUESTIONS AND CORRECT ANSWERS 2023/2024 / GRADED A+.

  • Exam (elaborations) • 7 pages • 2023
  • CSLB C10 TEST 1 / 120+ QUESTIONS AND CORRECT ANSWERS 2023/2024 / GRADED A+. CSLB C10 Test 1 1. What is the minimum working clearance from an electrical panel under 600 V?: 36" 2. Voltage drop in wire is a function of:: Wire gauge, Length of wire, Current flow in the wire 3. A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell.The average daily on-time is 12 hours per day. How many watt-hours are consumed by the light on an average day?: 156 4. Where may you...
    (0)
  • $10.49
  • + learn more
CSLB Contractor's Law practice test Part 2  question n answers 2024/2025
  • CSLB Contractor's Law practice test Part 2 question n answers 2024/2025

  • Exam (elaborations) • 13 pages • 2024
  • CSLB Contractor's Law practice test Part 2When should you let your attorney see a construction contract? A. Before you let the client see the contract B. After the contract is prepared but before you sign it C. After the building permit is obtained D. After the contract is signed by you and the client - correct answer B. After the contract is prepared but before you sign it Which is the most correct statement as to what must be included in every home improvement contract? A. Notice...
    (0)
  • $17.99
  • + learn more
CSLB C10 TEST 1 / 120+ QUESTIONS AND CORRECT ANSWERS 2023/2024 / GRADED A+
  • CSLB C10 TEST 1 / 120+ QUESTIONS AND CORRECT ANSWERS 2023/2024 / GRADED A+

  • Exam (elaborations) • 39 pages • 2024
  • CSLB C10 TEST 1 / 120+ QUESTIONS AND CORRECT ANSWERS 2023/2024 / GRADED A+. CSLB C10 Test 1 1. What is the minimum working clearance from an electrical panel under 600 V?: 36" 2. Voltage drop in wire is a function of:: Wire gauge, Length of wire, Current flow in the wire 3. A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell.The average daily on-time is 12 hours per day. How many watt-hours are consumed by the light on an average day?: 156 4. Where may you use nonme...
    (0)
  • $14.49
  • + learn more
CSLB EXAM QUESTIONS AND ANSWERS LATEST Update 2023/2024 (Verified Answers)
  • CSLB EXAM QUESTIONS AND ANSWERS LATEST Update 2023/2024 (Verified Answers)

  • Exam (elaborations) • 24 pages • 2023
  • CSLB EXAM QUESTIONS AND ANSWERS LATEST Update 2023/2024 (Verified Answers). A general contractor has obtained bids from several subcontractors for a private project. He notices that one bid is substantially lower than the rest. Is it ethical and a good business practice for this contractor to inform the subcontractor that the bid is substantially lower than the bids of the other subcontractors? - Answer Yes. If the contractor has reason to believe that the subcontractor has made an error in ...
    (0)
  • $18.49
  • + learn more
CSLB C10 Test 1 | 120 Questions and Correct Solutions
  • CSLB C10 Test 1 | 120 Questions and Correct Solutions

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • CSLB C10 Test 1 | 120 Questions and Correct Solutions What is the minimum working clearance from an electrical panel under 600 V? 36" Voltage drop in wire is a function of: Wire gauge, Length of wire, Current flow in the wire A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell. The average daily on-time is 12 hours per day. How many watt-hours are consumed by the light on an average day? 156 Where may you use nonmetallic-sheathed cable? inside floors and w...
    (0)
  • $11.49
  • + learn more
CSLB Practice Test Questions with Complete Solutions Graded A+
  • CSLB Practice Test Questions with Complete Solutions Graded A+

  • Exam (elaborations) • 5 pages • 2024
  • CSLB Practice Test Questions with Complete Solutions Graded A+ Abandonment of contract - Answer-abandonment of contract to cease intending or attempting to perform without legal excuse of any construction project or operation engaged in or undertaken by the licensee as a contractor shall be cause for disciplinary action Abeyance - Answer-condition in which ownership is undetermined Abstract - Answer-A summary to the history of the legal title to a piece of property; summary of a document;...
    (0)
  • $12.49
  • + learn more
CSLB Contractor's Law practice test Part 2 | 54 Questions and Verified Solutions Latest Update
  • CSLB Contractor's Law practice test Part 2 | 54 Questions and Verified Solutions Latest Update

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • CSLB Contractor's Law practice test Part 2 | 54 Questions and Verified Solutions Latest Update When should you let your attorney see a construction contract? A. Before you let the client see the contract B. After the contract is prepared but before you sign it C. After the building permit is obtained D. After the contract is signed by you and the client - Answer -B. After the contract is prepared but before you sign it Which is the most correct statement as to what must be included in ...
    (0)
  • $11.49
  • + learn more
CSLB C10 Test 1: Exam Review  Questions and answers, rated A+| latest update 2024/25|
  • CSLB C10 Test 1: Exam Review Questions and answers, rated A+| latest update 2024/25|

  • Exam (elaborations) • 10 pages • 2024
  • CSLB C10 Test 1: Exam Review Questions and answers, rated A+ What is the minimum working clearance from an electrical panel under 600 V? 36" Voltage drop in wire is a function of: Wire gauge, Length of wire, Current flow in the wire A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell. The average daily on-time is 12 hours per day. How many watt-hours are consumed by the light on an average day? 156 Where may you use nonmetallic-sheathed cable? inside flo...
    (0)
  • $9.49
  • + learn more
CSLB Practice Test | 100% Correct Answers | Verified | Latest 2024 Version
  • CSLB Practice Test | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 10 pages • 2024
  • CSLB Practice Test | 100% Correct Answers | Verified | Latest 2024 Version The costs of running your business, including office expenses, etc., is called: a. Direct Costs b. Overhead c. A liability d. Accrual - b. Overhead Which government agency collects State Unemployment Tax? a. Employment Development Department b. County Unemployment Office c. Franchise Tax Board d. Internal Revenue Service - a. Employment Development Department Who does not need a California Contractor'...
    (0)
  • $10.25
  • + learn more