Electric boiler - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Electric boiler? On this page you'll find 400 study documents about Electric boiler.

Page 3 out of 400 results

Sort by

Stationary Engineer Exam Questions and Answers Latest 2024/2025 (GRADED A+)
  • Stationary Engineer Exam Questions and Answers Latest 2024/2025 (GRADED A+)

  • Exam (elaborations) • 63 pages • 2024
  • Stationary Engineer Exam Questions and Answers Latest 2024/2025 (GRADED A+) How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - Answer 7 feet On a gas fired boiler what is the proper gas to air mixture - Answer 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm and carbon hard...
    (0)
  • $12.99
  • + learn more
Stationary Engineer Exam - Questions and Answers (Complete Solutions)
  • Stationary Engineer Exam - Questions and Answers (Complete Solutions)

  • Exam (elaborations) • 45 pages • 2024
  • Stationary Engineer Exam - Questions and Answers (Complete Solutions) How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? 7 feet On a gas fired boiler what is the proper gas to air mixture 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm and carbon hardness of 12 ppm? TH= (Ca x 2....
    (0)
  • $27.49
  • + learn more
ABSA: 4th Class Part B - Comprehensive Exam 4 New Update Actual Test with complete solution
  • ABSA: 4th Class Part B - Comprehensive Exam 4 New Update Actual Test with complete solution

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • One of the legal responsibilities of the engineer during an inspection is: Select one: a. To notify the Workers Compensation Board of the inspection b. Point out any known or suspected defects to the inspector c. To have at least two staff members present at all times d. To be in possession of an inspection certificate - Answer-b The _____ tubes of a fired hot oil heater have fins on their outer surfaces. Select one: a. Water b. Radiant c. Extended type d. Fire - Answer-c The injecti...
    (0)
  • $9.69
  • + learn more
NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (GRADED)
  • NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (GRADED)

  • Exam (elaborations) • 21 pages • 2024
  • NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (GRADED) 1 The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - Answer - 10%. HP Code: 14-9.12 3 Who oversees the code for any plumbing installations? - Answer - The NYC Plumbing Code NYC Mech: 1002.1 4 When will anchorage or guides be inspected? - Answer - Annually. NYC Mech: 1210.3.1.2 5 How many brass washout p...
    (0)
  • $15.49
  • + learn more
NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS, LATEST UPDATED 2024/2025 (GRADED)
  • NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS, LATEST UPDATED 2024/2025 (GRADED)

  • Exam (elaborations) • 21 pages • 2024
  • NYC HIGH PRESSURE STEAM EXAM QUESTIONS AND ANSWERS, LATEST UPDATED 2024/2025 (GRADED) The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - Answer - 10%. HP Code: 14-9.12 3 Who oversees the code for any plumbing installations? - Answer - The NYC Plumbing Code NYC Mech: 1002.1 4 When will anchorage or guides be inspected? - Answer - Annually. NYC Mech: 1210.3.1.2 5 How many brass washout pl...
    (0)
  • $15.49
  • + learn more
Power Engineering 4A exam 2023 with 1005 correct answers
  • Power Engineering 4A exam 2023 with 1005 correct answers

  • Exam (elaborations) • 31 pages • 2023
  • why was the ASME formed? - correct answer develop tech info, high standard of design and education, personal and professional development,ethical conduct, solutions for tech problems CSA B51 committee? - correct answer provincial and territorial jurisdiction, boiler manufacturers, insurance companies what is the purpose of B52? - correct answer provide safe design, construction, installation, operation, repair of refrigeration and air con. promote uniform requirements ASME 1 - c...
    (0)
  • $16.49
  • + learn more
MN Boiler Exam Questions With Verified Answers
  • MN Boiler Exam Questions With Verified Answers

  • Exam (elaborations) • 14 pages • 2024
  • MN Boiler Exam Questions With Verified Answers Cast Iron Sectional Boiler - answerLike Bread, sections in between are intermediate. Held together with push nipples and stay bolts. No special foundation required Expandable (can add more centers to increase heating capacity) Boiler trim mounted on end sections Disadvantage: Always low pressure Advantage: corrosion resistant Firetube boiler - answerused for heating and process Gas/heat of combustion on one side and water on outside. Hori...
    (0)
  • $12.49
  • + learn more
ABSA B1 Study Bank Questions with 100% Correct
  • ABSA B1 Study Bank Questions with 100% Correct

  • Exam (elaborations) • 134 pages • 2024
  • Available in package deal
  • ABSA B1 Study Bank Questions with 100% Correct Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour - Answer- A The main advantage of the packaged boiler is its a. small size b. compact design c. low cost D. quality steam - Answer- C Feild erected boilers have outputs of? A 75,000 kg/h B 100,000 kg/h C 100 mg/h D 150,000 kg/h or more - Answer- D Where electric p...
    (0)
  • $14.49
  • + learn more
Stationary Engineer Exam Questions and Answers 100% Pass
  • Stationary Engineer Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 57 pages • 2024
  • Stationary Engineer Exam Questions and Answers 100% Pass How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - Correct Answer ️️ -7 feet On a gas fired boiler what is the proper gas to air mixture - Correct Answer ️️ -30%- 70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm...
    (0)
  • $13.49
  • + learn more
ABSA B1 Study Bank Questions With verified solutions
  • ABSA B1 Study Bank Questions With verified solutions

  • Exam (elaborations) • 115 pages • 2024
  • ABSA B1 Study Bank Questions With verified solutions Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour -Correct Answer-A The main advantage of the packaged boiler is its a. small size b. compact design c. low cost D. quality steam -Correct Answer-C Feild erected boilers have outputs of? A 75,000 kg/h B 100,000 kg/h C 100 mg/h D 150,000 kg/h or more...
    (0)
  • $12.99
  • + learn more