Fishbone diagram - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Fishbone diagram? On this page you'll find 638 study documents about Fishbone diagram.
Page 3 out of 638 results
Sort by
-
QDM Expert Exam (2024/2025) Answered Correctly – Expert Verified | Latest Version
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
________ helps you rate how well each design attribute addresses a customer requirement 
PDPC - Selection Matrix - Multivoting - None of the Above - None of the Above 
A ____________ helps converts customer requirements to design attributes for a process/product - 
QFD 
A control chart can be used to: - Monitor the degree of variation in a process 
Judge whether or not a process is statistically in control 
Find and correct problems in an ongoing process 
All of the above 
A diagram used to brai...
-
Lean Six Sigma Green Belt (LSSGB) Latest Update Rated A+
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Lean Six Sigma Green Belt (LSSGB) 
 
Latest Update Rated A+ 
 
The Journey of Quality 
 
Meanings of Six Sigma 
 
Benefits of Six Sigma 
-Eliminates the root cause. 
-Creates robust products and services. 
-Reduces process variation and waste. 
-Ensures customer satisfaction. 
 
-Achieves process standardization. 
-Reduces rework by getting it right the first time. 
-Addresses the key business requirement. 
-Helps gain competitive advantage. 
-Achieves the organizational goals. 
DMAIC 
Define 
M...
-
LSS Final Exam Package Questions and Answers with Complete Solutions Graded A 2024
- Exam (elaborations) • 47 pages • 2024
-
- $14.49
- + learn more
Which of the following tools are considered part of the seven quality control (7QC) tools. 
a) gage R & R 
b) flow charts 
c) Pareto charts 
d) control charts 
e) b, c and d 
f) all the above - e) flow charts, pareto charts and control charts 
 
True or False: A cause and effect diagram captures historical knowledge but does not focus on present knowledge. - False 
 
True or False: The check sheet is one of the seven quality control tools. - True 
 
Depending on the type of control chart used, w...
-
ASCM CPIM Exam Review Questions & Answers 2024/2025
- Exam (elaborations) • 27 pages • 2024
-
Available in package deal
-
- $10.49
- + learn more
ASCM CPIM Exam Review Questions & Answers 2024/2025 
 
 
Appraisal - ANSWERSWhich of the following types of quality costs includes inspecting materials? 
 
To investigate further to identify the root cause - ANSWERSWhat is the objective of using the "five whys" technique to analyze defects? 
 
When the inspection cost is less than the cost of loss resulting from failure of the part - ANSWERSWhen is 100% inspection most appropriate for an incoming part used in a complex product assembly? 
 
Sam...
-
6 Sigma Green Belt Certification Exam Review practice testwith complete verified solutions 2024 latest update
- Exam (elaborations) • 41 pages • 2024
-
- $16.49
- + learn more
________ survey questions allow for quantitative analysis 
closed ended 
 
 
 
Value stream maps help identify all of the following 
sources of waste, bottlenecks, material & information flow, improvement opportunities 
 
 
 
 
Brainpower 
Read More 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
0:07 
/ 
0:15 
Full screen 
The Fishbone diagram is part of the ________ phase of the Define, Measure, Analyze, Improve, and Control (DMAIC) cycle. 
analyze 
 
 
 
When creati...
Too much month left at the end of the money?
-
CPHQ Practice Exam | Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 45 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
When considering the use of an external subject matter expert (SME), which of the following is most 
critical? 
A. leadership's personal preference 
B. geographic location of the SME 
C. cost of the SME's services 
D. references of the SME - D. references of the SME 
The positive clinical reputation provides credibility support to the project. 
To avoid misinterpreting variances, which of the following statistical tools should be used? 
A. control chart 
B. fishbone diagram 
C. force field ana...
-
Part I: CSSGB questions with correct answers
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Why is Six Sigma important in a business application? Correct Answer-organizations must stay profitable to remain in business, and Six Sigma is a powerful tool to that end. 
 
Which was the first documented organization to utilize Six Sigma as we know it today? Correct Answer-Motorola Inc 
 
What is the most common cause of a failed Six Sigma program in an organization? Correct Answer-Management's lack of commitment to real process improvement 
 
Who developed the concept of what we call statis...
-
SIX SIGMA GREEN BELT - PRACTICE EXAM 1
- Exam (elaborations) • 22 pages • 2023
-
Available in package deal
-
- $12.49
- + learn more
Which of the following charts will be used to study observed data for trends or patterns over a specified period of time and focus attention on vital changes in the process? 
*Data forward chart 
*Scatter plot 
*Min/max plot 
*Run chart - Answer- Run chart 
 
A run chart shows trends and patterns over time and is used to assess the stability of the process. 
 
What is another name for an Ishikawa diagram? 
*Fishbone diagram 
*Cause and effect diagram 
*6 M diagram 
*All of the above - Answer- Al...
-
ASQ Green Belt Exam (Latest 2024/ 2025 Update) Questions and Verified Answers| Grade A| 100% Correct
- Exam (elaborations) • 87 pages • 2024
-
Available in package deal
-
- $11.49
- + learn more
ASQ Green Belt Exam (Latest 2024/ 2025 Update) Questions and Verified Answers| Grade A| 100% Correct 
 
Q: When the sampling method used creates a difference between the result obtained from the sample and the actual population value, the difference is known as 
 
a. Correlation 
b. Precision 
c. Accuracy 
d. Bias 
 
 
Answer: 
d. Bias 
 
 
 
Q: Which of the following is an example of mistake-proofing? 
 
a. Using an Xbar and R chart to prevent errors 
b. Using 100% inspection to detect and cont...
-
Six Sigma Green Belt Certification Correctly Answered Questions| UpToDate | Already Graded A+
- Exam (elaborations) • 56 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
A nominal voting approach is a method of reaching what goal? 
•Consensus 
•Animosity 
•Limitations 
•Arguments 
: Consensus 
A good use for a Force Field Analysis tool would be for the team to be able to... 
•Know when to act on a process, and when to leave the process alone 
•Know when to reject the null 
•Visualize customer needs and requirements 
•Understand driving forces and restraining forces 
: Understand driving forces and restraining forces 
What happens during the Contr...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia