Hoist up raise load - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Hoist up raise load? On this page you'll find 238 study documents about Hoist up raise load.
Page 3 out of 238 results
Sort by
-
NEIEP 200 Final Exam Questions and Answers Updated 2024/2025 (100% VERIFIED)
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $15.49
- + learn more
NEIEP 200 Final Exam Questions and Answers Updated 2024/2025 (100% VERIFIED) you are about to loosen a fishplate bolt. which wrench would be least likely 
to slip? 
(Ansa. 6 point box end wrench 
b. 12 point box end wrench 
c. open end wrench 
you are using a plumb line to check a rail for plumb. you find that at the top 
it measures 1" and at the bottom it measures 1 1/4". what does this tell 
you? 
(Ansa. the top of the rail needs to go towards the center 
b. the top of the rail needs to go ...
-
NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% Correct)
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% Correct) Which if the following will indicates intemal damage or ultimately core failure in rotationresistant rope? 
(A) Strand bird caging (B) Dianeter reduction (C) Excessive lubrication (D) Kinking correct 
answers (B) Dianeter reduction 
When a jib is erected from the stowed position and not used, how will its effective weight 
change? 
(A) It decreases (B) It increases (C) It will tip the crane (D) It stays the same correct answers...
-
Mechanics Exam 2022/2023 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 15 pages • 2022
-
- $11.49
- 1x sold
- + learn more
An MOV burns out, you replace it but cannot read voltage or resistance. What should you do? 
Replace it with a larger one (630) 
 
 
 
* On a Ward-Leonard circuit, the brake is set but the motor is trying to slip through the brake. What circuit is the issue? 
Suicide circuit (425) 
 
 
 
** A Hydro runs up with no load but does not run up with a full load. What is the issue? 
The relief valve is set too low (805) 
 
 
 
** Runby for a 1:1 car hits the CWT buffer 4" below the top landing. The CW...
-
NEIEP 200 Final Exam (courses 205- 250): Questions & Answers
- Exam (elaborations) • 13 pages • 2024
-
- $18.49
- + learn more
NEIEP 200 Final Exam (courses 205- 250): Questions & Answers 
NEIEP 200 Final Exam (courses 205- 
250): Questions & Answers 
you are about to loosen a fishplate bolt. which wrench would be least likely 
to slip? 
(Ansa. 6 point box end wrench 
b. 12 point box end wrench 
c. open end wrench 
you are using a plumb line to check a rail for plumb. you find that at the top 
it measures 1" and at the bottom it measures 1 1/4". what does this tell 
you? 
(Ansa. the top of the rail needs to go towards...
-
NCCCO Telescopic Core Review Questions.
- Exam (elaborations) • 10 pages • 2024
-
- $14.49
- + learn more
When lifting from the main boom, how is the effective weight of the fly/jib different in the erected position from that of the stowed position? 
 
A. Effective weight increases 
B. Effective weight decreases 
C. Effective weight is reduced 85% 
D. Effective weight is reduced 75% 
A. Effective weight increases 
 
 
 
Who must determine maximum speed for a mobile crane to travel with a suspended load? 
 
A. The competent person 
B. The job site 
C. The superintendent 
D. The craft foreman 
A. the ...
Too much month left at the end of the money?
-
NEIEP Mechanics Training Exam With All Complete Answers 2024.
- Exam (elaborations) • 21 pages • 2024
-
Available in package deal
-
- $8.39
- + learn more
A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What is required? - Answer 100 fpm/125 fpm= 12"/ X =15 
 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - Answer Replace it with a larger MOV - 630 
 
On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the brake. What is the issue? - Answer Suicide Circuit - 425 
 
You have an old DC motor a...
-
MECHANICS EXAM 20242025 WITH GUARANTEED ACCURATE ANSWERS |VERIFIED
- Exam (elaborations) • 20 pages • 2024
-
- $13.99
- + learn more
An MOV burns out, you replace it but cannot read voltage or resistance. What should you do? - ACCURATE ANSWERReplace it with a larger one (630) 
 
On a Ward-Leonard circuit, the brake is set but the motor is trying to slip through the brake. What circuit is the issue? - ACCURATE ANSWERSuicide circuit (425) 
 
 A Hydro runs up with no load but does not run up with a full load. What is the issue? - ACCURATE ANSWERThe relief valve is set too low (805) 
 
Runby for a 1:1 car hits the CWT buffer 4" ...
-
NEIEP 200 Final Exam (courses 205- 250): Questions & Answers
- Exam (elaborations) • 13 pages • 2024
-
- $17.99
- + learn more
NEIEP 200 Final Exam (courses 205- 250): Questions & Answers 
NEIEP 200 Final Exam (courses 205- 
250): Questions & Answers 
you are about to loosen a fishplate bolt. which wrench would be least likely 
to slip? 
(Ansa. 6 point box end wrench 
b. 12 point box end wrench 
c. open end wrench 
you are using a plumb line to check a rail for plumb. you find that at the top 
it measures 1" and at the bottom it measures 1 1/4". what does this tell 
you? 
(Ansa. the top of the rail needs to go towards...
-
ELEVATOR MECHANIC EXAM 2024/2025 WITH GUARANTEED ACCURATE ANSWERS |VERIFIED
- Exam (elaborations) • 29 pages • 2024
-
- $16.49
- + learn more
ELEVATOR MECHANIC EXAM 2024/2025 
ELEVATOR MECHANIC EXAM 2024/2025 WITH GUARANTEED ACCURATE ANSWERS |VERIFIED 
 
 
A contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. What sheave is required? - ACCURATE ANSWERDiam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 12"+3"= 15" sheave 
 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - ACCURATE ANSWERReplace it with a larger MOV 
 
On a Ward-L...
-
NCCCO MOBILE CRANE EXAM – 99 QUESTIONS WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $15.99
- + learn more
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom 
c. 
 
 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% 
a. 
 
 
 
3. The load line of the crane you're operating contacts an energized powe...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia