Low high angle rope - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Low high angle rope? On this page you'll find 299 study documents about Low high angle rope.

Page 3 out of 299 results

Sort by

NCCCO TEST 2|| 50 QUESTIONS|| CORRECT ANSWERS|| LATEST UPDATE 2024.
  • NCCCO TEST 2|| 50 QUESTIONS|| CORRECT ANSWERS|| LATEST UPDATE 2024.

  • Exam (elaborations) • 6 pages • 2024
  • When making a multiple crane lift, it is important for the operator to understand that: - ANSWER The weight may increase if the other crane lands the load If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - ANSWER Increase Most crane manufacturers reduce load capacity for duty-cycle operations because: - ANSWER Side loading forces may occur On who's recommendations should a preventative maintenance program be set-up?...
    (0)
  • $15.49
  • + learn more
NCCCO TEST 2 Questions and answers with 100% correct solutions | A+ Grade
  • NCCCO TEST 2 Questions and answers with 100% correct solutions | A+ Grade

  • Exam (elaborations) • 6 pages • 2024
  • When making a multiple crane lift, it is important for the operator to understand that: The weight may increase if the other crane lands the load If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: Increase Most crane manufacturers reduce load capacity for duty-cycle operations because: Side loading forces may occur On who's recommendations should a preventative maintenance program be set-up? Crane manufacturer What is ...
    (0)
  • $7.99
  • + learn more
NCCCO TEST 2 | 100% Correct Answers | Verified | Latest 2024 Version
  • NCCCO TEST 2 | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • When making a multiple crane lift, it is important for the operator to understand that: - The weight may increase if the other crane lands the load If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - Increase Most crane manufacturers reduce load capacity for duty-cycle operations because: - Side loading forces may occur On who's recommendations should a preventative maintenance program be set-up? - Crane manufacturer ...
    (0)
  • $7.99
  • + learn more
COO Practice Written Exam Questions and Answers
  • COO Practice Written Exam Questions and Answers

  • Exam (elaborations) • 28 pages • 2024
  • What are some hazards for mobile cranes excavations? - Vibrations from other equipment, previously excavated soils When do you consider the weight of the wire rope to be part of the load for deductions? - Multi part reeve when extra line is not necessary to make the pick You never take the weight of the wire rope on top of the boom as a deduction? - True What best describes a luffing jib? - Boom with a dedicated winch that acts independent of the main boom. Where does most boom damage come f...
    (0)
  • $12.00
  • + learn more
NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED

  • Exam (elaborations) • 9 pages • 2024
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER- there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER- Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER- Separate the boom hoist lines How many randomly ...
    (0)
  • $12.39
  • + learn more
COO Practice Written Exam Questions and Answers
  • COO Practice Written Exam Questions and Answers

  • Exam (elaborations) • 28 pages • 2024
  • What are some hazards for mobile cranes excavations? - Vibrations from other equipment, previously excavated soils When do you consider the weight of the wire rope to be part of the load for deductions? - Multi part reeve when extra line is not necessary to make the pick You never take the weight of the wire rope on top of the boom as a deduction? - True What best describes a luffing jib? - Boom with a dedicated winch that acts independent of the main boom. Where does most boom damage come f...
    (0)
  • $12.00
  • + learn more
NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (100% Correct & Graded)
  • NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (100% Correct & Graded)

  • Exam (elaborations) • 11 pages • 2024
  • NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (100% Correct & Graded) Which unsafe condition could result when a wedge socket is attached directly to a load hook, using 6x19 IWRC? (A) Spinning of the load (B) Decreased line pull (C) Decreased safe working load (D) Structural failure correct answers (A) Spinning of the load Which if the following will indicates intemal damage or ultimately core failure in rotationresistant rope? (A) Strand bird caging (B) Dianeter reduction (C...
    (0)
  • $15.49
  • + learn more
Crossfit L1&2 Exam QUESTIONS AND ANSWERS:  UPDATED EXAM GRADED A+
  • Crossfit L1&2 Exam QUESTIONS AND ANSWERS: UPDATED EXAM GRADED A+

  • Exam (elaborations) • 40 pages • 2024
  • Available in package deal
  • Crossfit L1&2 Exam QUESTIONS AND ANSWERS: UPDATED EXAM GRADED A+ Virtuosity - ANSWERS Doing the common uncommonly well Qualities of effective trainer - ANSWERS Teaching, Seeing, Correcting, Group/gym management, Presence and attitude, Demonstration GPP - ANSWERS General Physical Preparedness 10 General Physical Skills (Fitness Domains) - ANSWERS Cardio endurance, Agility, Balance, Accuracy, Flexibility, Coordination, Speed, Strength, Stamina, Power Crossfits Aim - ANSWERS Forge a broa...
    (0)
  • $17.99
  • + learn more
NCCCO CORE Questions | 100% Correct Answers | Verified | Latest 2024 Version
  • NCCCO CORE Questions | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 11 pages • 2024
  • Before leveling a mobile crane on outriggers, an operator should ensure: - there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, ...
    (0)
  • $8.49
  • + learn more
Massachusetts 2a Hoisting License Questions And Answers Latest Updated 2024/2025 | Scored A+
  • Massachusetts 2a Hoisting License Questions And Answers Latest Updated 2024/2025 | Scored A+

  • Exam (elaborations) • 21 pages • 2024
  • 1. What is the purpose of the swing gear on an excavator: answer- It connects the car body to the tracks 2. Who is responisble for inspecting a trench before anyone goes in it: answer- The equipment operator 3. What is the prefered sling angle: answer- 60* 4. The top of the spoil pile is called: answer- The crown 5. A four footbdeep trench requires an additional ladder for each _ of open trench: answer- 25ft 6. Materials mist be kept back from the edge of the trenxh a minimum of: answer...
    (0)
  • $14.99
  • + learn more