Mobile cranes exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Mobile cranes exam? On this page you'll find 148 study documents about Mobile cranes exam.
Page 3 out of 148 results
Sort by
-
OECP EXAM NEWEST 2024 ACTUAL TEST BANK COMPLETE QUESTIONS AND CORRECT ANSWERS (ALREADY GRADED A+)
- Exam (elaborations) • 15 pages • 2024
-
- $12.99
- + learn more
OECP EXAM NEWEST 2024 ACTUAL TEST BANK COMPLETE QUESTIONS AND CORRECT ANSWERS (ALREADY GRADED A+) 
 
What are the 3 basic components of wire rope? - Answer- Strands, wires, and core 
 
When should you check the LMI, anti-two-block, and all crane functions? - Answer- Before each shift 
 
A person inspecting a crane should have what kind of knowledge? - Answer- Practical and theoretical 
 
What does RCL stand for? - Answer- Rated capacity limiter 
 
What does LMI stand for? - Answer- Load moment i...
-
Massachusetts 2A Hoisting License Exam Study Guide Rated A+
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Massachusetts 2A Hoisting License 
Exam Study Guide Rated A+ 
 
ANSI American National Standards Institute 
 
Apprentice License A Document Issued by the Department upon proof of registration at a 
training facility and with the Division of Apprentice Training 
 
Apprentice Licensee A Person, who is 18 years of age of older, 
 
ASME American Society of Mechanical Engineers 
 
Cargo A Load, quantity, or volume that can be processed or transported 
 
Certificate of Completion A Uniform certificate...
-
2024 RIGGING PRACTICES COURSE EXAM WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 12 pages • 2024
-
- $17.49
- + learn more
2024 RIGGING PRACTICES COURSE 
EXAM WITH 100% CORRECT ANSWERS 
for mobile crane working at maximum radius, exceeding what percentage of the 
cranes capacity requires the radius to be verified? 
80% 
the minimum depth of thread engagement for a 1/2 in eyebolt into steel object is? 
3/4 in 
when tying knots in synthetic rope lashing, the rated load is increased by 50% ? 
false
-
NCCCO CRANE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $14.49
- + learn more
Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER there is 
no weight of the crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition 
should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER 
Separate the boom hoist lines 
How many randomly broken wires in a lay length must there be on a mobil...
-
NCCCO CORE EXAM / NCCCO Core Exam 2023-2024 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS VERIFIED ANSWERS GRADED A+
- Exam (elaborations) • 27 pages • 2024
-
- $17.99
- + learn more
NCCCO CORE EXAM / NCCCO 
Core Exam 
ACTUAL EXAM QUESTIONS 
AND CORRECT ANSWERS 
VERIFIED ANSWERS GRADED 
A+ 
Mobile crane is more stable when: - ANSWER-The 
cranes leverage is greater than the load leverage 
Cranes that have been idle for _____ Months or more must 
be given a monthly inspection by a qualified person. - 
ANSWER-3 
Which of the following is an accurate statement about 
luffing jibs? - ANSWER-It raises and lowers 
independent from the boom 
What is the weakest quadrant of a boom t...
Want to regain your expenses?
-
General Crane Safety Written Exam 2024.
- Exam (elaborations) • 31 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
General Crane Safety Written Exam 2024. 
 
The minimum crane team for a mobile crane on outriggers would consist of- 
A) The Crane Operator, Rigger Supervisor, and Crane Rigger 
B) The Crane Operator, Crane Supervisor, Rigger Supervisor, and 
Crane Rigger 
C) The Crane Operator, Crane Supervisor, and Crane Rigger 
D) The Crane Operator and Rigger-in-Charge 
E) The Crane Operator, Crane Walker, and Crane Rigger - correct answer C) The Crane Operator, Crane Supervisor, and Crane Rigger 
 
When ope...
-
Test 2 Nccco / Nccco Test 2 Exam 2024 / 2025
- Exam (elaborations) • 6 pages • 2024
-
- $17.99
- + learn more
Test 2 Nccco / Nccco Test 2 Exam 2024 / 2025 
What is the maximum advisable wind speed for crane operation? - ANSWER-30 mph mobile 
When working near power lines, where should caution stickers be installed? - ANSWER-At operators station and on the outside of the crane 
What is the allowable jib back lash? - ANSWER-5 degrees 
Cranes must be level to within _________% grade - ANSWER-1%
-
General Crane Safety Review Exam Questions 2024.
- Exam (elaborations) • 31 pages • 2024
-
Available in package deal
-
- $10.49
- + learn more
General Crane Safety Review Exam Questions 2024.The minimum crane team for a mobile crane on outriggers would consist of- 
A) The Crane Operator, Rigger Supervisor, and Crane Rigger 
B) The Crane Operator, Crane Supervisor, Rigger Supervisor, and 
Crane Rigger 
C) The Crane Operator, Crane Supervisor, and Crane Rigger 
D) The Crane Operator and Rigger-in-Charge 
E) The Crane Operator, Crane Walker, and Crane Rigger - correct answer C) The Crane Operator, Crane Supervisor, and Crane Rigger 
 
Whe...
-
NCCCO CORE EXAM / NCCCO Core Exam 2023-2024 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS VERIFIED ANSWERS GRADED A+
- Exam (elaborations) • 27 pages • 2024
-
- $25.49
- + learn more
NCCCO CORE EXAM / NCCCO 
Core Exam 
ACTUAL EXAM QUESTIONS 
AND CORRECT ANSWERS 
VERIFIED ANSWERS GRADED 
A+ 
Mobile crane is more stable when: - ANSWER-The 
cranes leverage is greater than the load leverage 
Cranes that have been idle for _____ Months or more must 
be given a monthly inspection by a qualified person. - 
ANSWER-3 
Which of the following is an accurate statement about 
luffing jibs? - ANSWER-It raises and lowers 
independent from the boom 
What is the weakest quadrant of...
-
General Crane Safety Exam Tested Questions & Revised Correct Answers <Updated>
- Exam (elaborations) • 32 pages • 2024
-
- $12.99
- + learn more
General Crane Safety 
Exam Tested Questions & Revised 
Correct Answers 
<Updated> 
The minimum crane team for a mobile crane on outriggers would 
consist ofA) The Crane Operator, Rigger Supervisor, and Crane Rigger 
B) The Crane Operator, Crane Supervisor, Rigger Supervisor, 
and 
Crane Rigger 
C) The Crane Operator, Crane Supervisor, and Crane Rigger 
D) The Crane Operator and Rigger-in-Charge 
E) The Crane Operator, Crane Walker, and Crane Rigger - 
ANSWER : C) The Crane Operator, ...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia