Modular contracting - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Modular contracting? On this page you'll find 55 study documents about Modular contracting.

Page 3 out of 55 results

Sort by

Oregon Contractors License Questions and Answers 100% Correct
  • Oregon Contractors License Questions and Answers 100% Correct

  • Exam (elaborations) • 138 pages • 2023
  • what chapter has licensing exemptions? - ANSWER-Chapter 1 A licensed landscape contracting business that constructs fences, decks, arbors, patios, landscape edging, driveways, walkways or retaining walls is exempt from licensing as a contractor. True or False - ANSWER-True what is a small residential structure? - ANSWER-A nonresidential structure with a ground area of 10,000 square feet or less and the structure is not more than 20 feet tall; or A nonresidential unit in a larger structure...
    (0)
  • $16.49
  • + learn more
CFCM Study Guide exam with correct answers 2024.
  • CFCM Study Guide exam with correct answers 2024.

  • Exam (elaborations) • 114 pages • 2024
  • Which of the following statements is NOT true? a. The government encourages the maximum practicable commercial use of inventions made under government contracts. b. The government recognizes rights in data developed at private expense, and limits its demands for delivery of that data. c. The government requires that contractors obtain permission from copyright owners before including copyrighted works, owned by others, in data to be delivered to the government. d. Generally, the governmen...
    (0)
  • $7.99
  • + learn more
CFCM Exam Practice Test with 100% correct answers 2024
  • CFCM Exam Practice Test with 100% correct answers 2024

  • Exam (elaborations) • 42 pages • 2024
  • What is a Certificate of Competency - answer-A certificate issued by the SBA stating that the holder is responsible for the purpose of receiving and performing a specific Government contract Except as specifically permitted by executive agencies, the fast payment procedure may not be used for individual purchasing instruments exceeding what amount? - answer-$35,000 What can a contractor access online at ? - answer-The government wide point of entry Size Standards - answer-FAR 19.102(b)(...
    (0)
  • $7.99
  • + learn more
  CH 1 IFSTA questions and answers latest top score.
  • CH 1 IFSTA questions and answers latest top score.

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • CH 1 IFSTA questions and answers latest top score. Firefighters are at risk of contracting respiratory diseases such as lung cancer and COPD because of repeated exposure to: Select one: a. atypically stressful situations. b. chronic infectious diseases. c. high temperatures. d. smoke, dangerous gases, and chemicals. - correct answer. smoke, dangerous gases, and chemicals. Which duty would likely be assigned to a Fire Fighter I? Select one: a. Establishing Incident ...
    (0)
  • $13.49
  • + learn more
SPĒD SAPPC: PHYSEC EXAM REVIEW QUESTIONS AND  ANSWERS, RATED A+| latest update 2024/25|
  • SPĒD SAPPC: PHYSEC EXAM REVIEW QUESTIONS AND ANSWERS, RATED A+| latest update 2024/25|

  • Exam (elaborations) • 11 pages • 2024
  • SPĒD SAPPC: PHYSEC EXAM REVIEW QUESTIONS AND ANSWERS, RATED A+ B. It must be in an area designated as a Restricted Area - -When designing a new multi-story government Special Access Program Facility (SAPF), the architect provided identical drawings for two three-story buildings to the security officer. One drawing is for a building on the installation to be occupied only by contracting Company X. The other is for the command headquarters building on the installation.The design reveal...
    (0)
  • $9.49
  • + learn more
IS-0100.c: An Introduction to the incident command system, FEMA ICS 100. IS-0100.c: An Introduction to the incident command system, FEMA ICS 100.
  • IS-0100.c: An Introduction to the incident command system, FEMA ICS 100.

  • Exam (elaborations) • 7 pages • 2023
  • IS-0100.c: An Introduction to the incident command system, FEMA ICS 100. ICS is a standardized, on-scene, widely applicable approach to incident management. - Scenario: The Operations Section has determined that the Emergency Medical Services, the Fire Department, and the School Bus Company will be assigned to the evacuation of the Nursing Home. They will all converge at City Hall and will be dispatched, as appropriate, to begin the rapid and safe movement of the residents to their tempor...
    (1)
  • $9.69
  • + learn more
SPēD SAPPC: PHYSEC Test Questions with Correct Solutions| Rated A+
  • SPēD SAPPC: PHYSEC Test Questions with Correct Solutions| Rated A+

  • Exam (elaborations) • 10 pages • 2023
  • B. It must be in an area designated as a Restricted Area - When designing a new multi-story government Special Access Program Facility (SAPF), the architect provided identical drawings for two three-story buildings to the security officer. One drawing is for a building on the installation to be occupied only by contracting Company X. The other is for the command headquarters building on the installation.The design reveals floor-to-ceiling windows on the second floor for the main conference ro...
    (0)
  • $12.99
  • + learn more
CFCM Practice Test Questions and answers graded A+ 2024 exam
  • CFCM Practice Test Questions and answers graded A+ 2024 exam

  • Exam (elaborations) • 40 pages • 2024
  • How often are statutory acquisition-related dollar thresholds in the FAR adjusted for inflation? - answer-Every 5 years A form of written approval signed by an authorized official that is required by statute or regulation as a prerequisite to taking certain contract actionsi s defined as a - answer-determination and findings Contracting officers below the level of ___ shall be selected and appointed - answer-a head of a contracting activity According to the FAR conventions at Subpart 1....
    (0)
  • $7.99
  • + learn more
CPCM Pre-Award Practice Test 2024
  • CPCM Pre-Award Practice Test 2024

  • Exam (elaborations) • 7 pages • 2024
  • CPCM Pre-Award Practice Test 2024 What are government Purchase cards used for? -Answer-As the method of contractimg for transactions under the Simplified Acquistion Threshold An acquisition of an IT system is divided into several smaller acquisitions increments that provide an opportunity for subsequent increments to take advantage of advances in technology or respond to changing needs. This is an example of what? -Answer-Modular Contracting the Reynard-Muldrake Group provides physical sec...
    (0)
  • $11.49
  • + learn more
ADMN 232 Final Exam ALL SOLUTION LATEST EDITION 2023/24 GUARANTEED GRADE A+
  • ADMN 232 Final Exam ALL SOLUTION LATEST EDITION 2023/24 GUARANTEED GRADE A+

  • Exam (elaborations) • 37 pages • 2023
  • Organizational Innovation the successful implementation of creative ideas in organizations Intrapreneurship when entrepreneurial ideas are created inside an existing company Creativity the production of novel and useful ideas Organizational Change a difference in the form, quality, or condition of an organization over time Technology Cycle begins with the birth of a new technology and ends when that technology reaches its limits and is replaced by a newer substantially better technology...
    (0)
  • $18.09
  • + learn more