Mw over generating - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Mw over generating? On this page you'll find 76 study documents about Mw over generating.
Page 3 out of 76 results
Sort by
-
EPRI Chapter Test Questions with Verified Solutions
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
EPRI Chapter Test Questions with Verified Solutions If a generator is producing 500MW and 200Mvar, the generator is: Lagging 
87 Is the IEEE device number for a differential relay. 
Can a Synchronous machine have a negative torque angle? What doies this mean? Yes, the machine is absorbing active power. 
A customer load is fed at 12o Volts. The customer's voltage is doubled while the load magnitude stays the same. What effect does this have on the power losses? Decreases the losses by a factor o...
-
SOS NERC RELIABILITY EXAM QUESTIONS & ANSWERS LATEST 2023-2024 GRADED A+
- Exam (elaborations) • 69 pages • 2023
-
Available in package deal
-
- $15.49
- + learn more
SOS NERC RELIABILITY EXAM QUESTIONS & ANSWERS LATEST GRADED A+. The Reliability Coordinator just informed you of a slow time error correction 
which will begin at the top of the next hour. Your EMS system will not let you 
change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. 
What action should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
C) Decrease Net Inte...
-
NERC Certification Practice Questions With Complete Solutions
- Exam (elaborations) • 7 pages • 2023
-
Available in package deal
-
- $9.49
- + learn more
NERC Certification Practice Questions with Complete Solutions 
 
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS -Answer b) An inaccurate load forecast 
 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be th...
-
NERC book quiz with correct answers graded A+
- Exam (elaborations) • 18 pages • 2023
-
Available in package deal
-
- $9.99
- + learn more
NERC book quiz with correct answers graded A+ 
 
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - Answer -4MW 
 
Net actual interchange minus Net scheduled interchange is what? - Answer Inadvertent interchange 
 
Suppose your interconnection operators at ...
-
NERC book quiz| 157 questions| WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $8.99
- + learn more
NERC book quiz| 157 questions| WITH COMPLETE 
SOLUTIONS 
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a 
large loss of load in the contingent BA. If your generator governor control systems responded to the 
frequency deviation approximately how much of a generation change would you BA experience? - 
Answer --4MW 
Net actual interchange minus Net scheduled interchange is what? - Answer -Inadvertent interchange 
Suppose your interconnection oper...
Fear of missing out? Then don’t!
-
PJM Sample Test Review 2024 Questions and Answers
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Sample Test Review 2024 
Questions and Answers 
Real time transmission constraints or contingencies may be alleviated with generators 
operating ______________ - Correct Answer ️️ -off cost out of merit. 
Monitoring ___________ may give insights into system constraints. - Correct Answer ️️ 
-Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line schedules are 
maintained. - Correct Answer ️️ -PJM calls on synchronized reserves 
If not cancelled by...
-
NERC SOS quiz Questions and Answers (Already GRADED A)
- Exam (elaborations) • 60 pages • 2023
-
Available in package deal
-
- $11.49
- + learn more
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? 
Regulation of other services related to control performance 
 
 
1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection 
Burden 
 
 
A Balancing Authority is performing Overlap Regul...
-
KNOWN NERC EXAM QUESTIONS: From Class
- Exam (elaborations) • 6 pages • 2023
-
- $9.99
- + learn more
KNOWN NERC EXAM QUESTIONS: From Class 
 
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS - b) An inaccurate load forecast 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? 
 
a) A...
-
KNOWN NERC EXAM QUESTIONS WITH CORRECT SOLUTIONS( GRADED A+)
- Exam (elaborations) • 9 pages • 2023
-
Available in package deal
-
- $10.99
- + learn more
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS - b) An inaccurate load forecast 
 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? 
 
a) A net under-generation in Balancing Ar...
-
NERC book Quiz Questions and Answers 2023-2024 Graded A
- Exam (elaborations) • 13 pages • 2023
-
- $12.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW 
 
Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at ...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia