Nccco rigging 1 2 exam Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nccco rigging 1 2 exam? On this page you'll find 59 study documents about Nccco rigging 1 2 exam.
Page 3 out of 59 results
Sort by
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing instructions be kept - ANSWER ON Site 
All climbing operations shall be performed under the supervision of - ANSWER Qualified 
person 
When cranes are erected, load limiting devices shall be tested for proper setting and 
operation - ANSWER Before crane is placed in service 
Hooks shall be equipped with lat...
-
NCCCO MOBILE CRANE EXAM 2023-2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS VERIFIED ANSWERS GRADED A+
- Exam (elaborations) • 12 pages • 2023
-
- $12.99
- + learn more
NCCCO MOBILE CRANE EXAM 
ACTUAL EXAM 100 QUESTIONS AND 
CORRECT DETAILED ANSWERS VERIFIED 
ANSWERS GRADED A+ 
1. What action does a signal person intend the operator to perform if he extends his arm 
at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - ANSWER-c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom 
crane be in order for the gross ratings in the load chart to remain valid...
-
NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS
- Exam (elaborations) • 11 pages • 2023
-
Available in package deal
-
- $13.49
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer-c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - Answer-a. 
 
3....
-
NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $8.99
- + learn more
NCCCO RIGGING 1 & 2 
Exam Questions with 
Correct Answers 
 
OSHA 1910 - Answer-General Industry Standards 
OSHA 1926 - Answer-Construction Industry Standards 
OSHA 1910.180 - Answer-Crawler, Locomotive and Truck Cranes 
OSHA 1910.184 - Answer-Slings 
OSHA 1926.251 - Answer-Rigging Equipment used for material handling 
OSHA 1926.1400 - Answer-Cranes and Derricks used in construction 
ASME B30.3 - Answer-Tower Cranes 
ASME B30.5 - Answer-Mobile and Locomotive Cranes 
ASME B30.9 - Answer-Slings 
A...
-
NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers
- Exam (elaborations) • 4 pages • 2024
-
- $13.19
- + learn more
NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers 
OSHA 1910 - Answer-General Industry Standards 
 
OSHA 1926 - Answer-Construction Industry Standards 
 
OSHA 1910.180 - Answer-Crawler, Locomotive and Truck Cranes 
 
OSHA 1910.184 - Answer-Slings 
 
OSHA 1926.251 - Answer-Rigging Equipment used for material handling 
 
OSHA 1926.1400 - Answer-Cranes and Derricks used in construction 
 
ASME B30.3 - Answer-Tower Cranes 
 
ASME B30.5 - Answer-Mobile and Locomotive Cranes 
 
ASME B30.9 - Ans...
And that's how you make extra money
-
NCCCO RIGGING 1 AND 2 LATEST UPDATE EXAM WITH CORRECT ANSWERS GRADED A+ OSHA 1910 - ANSWER-General Industry Standards OSHA 1910.180 - ANSWER-Crawler, Locomotive and Truck Cranes OSHA 1910.184 - ANSWER-Slings OSHA 1926 - ANSWER-Construction Industry Standa
- Exam (elaborations) • 7 pages • 2024
-
- $13.99
- + learn more
NCCCO RIGGING 1 AND 2 LATEST UPDATE EXAM WITH CORRECT ANSWERS GRADED A+ 
OSHA 1910 - ANSWER-General Industry Standards 
OSHA 1910.180 - ANSWER-Crawler, Locomotive and Truck Cranes 
OSHA 1910.184 - ANSWER-Slings 
OSHA 1926 - ANSWER-Construction Industry Standards 
OSHA 1926.1400 - ANSWER-Cranes and Derricks used in construction 
OSHA 1926.251 - ANSWER-Rigging Equipment used for material handling 
OSHA max allowable throat opening on a hook - ANSWER-15% 
Load Angle Factor 30* - ANSWER-2.000 
Load ...
-
NCCCO CORE EXAM 2023-2024 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS VERIFIED ANSWERS GRADED A+
- Exam (elaborations) • 22 pages • 2023
-
- $12.99
- + learn more
NCCCO CORE EXAM ACTUAL EXAM 
QUESTIONS AND CORRECT ANSWERS 
VERIFIED ANSWERS GRADED A+ 
If taking sides strain on a boom what concerns the operator the most - ANSWER-Boom 
damage 
If a crane load chart has capacities listed in the shaded area this means that - 
ANSWER-If overloaded structural confidence will be compromised 
As the layers of rope on a drum increase the allowable line Pull wil - ANSWERDecrease 
Of the following actions which one will most likely cause a side load condition - 
ANS...
-
NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS
- Exam (elaborations) • 11 pages • 2024
-
- $12.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS 
 
1.	What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a.	Boom down b. Swing 
c. Boom up 
d. Extend boom - Answer-c. 
 
2.	When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a.	1% 
b.	2% 
c.	5% 
d.	8% - Answer-a. 
 
3.	The lo...
-
NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
NCCCO TWR Practice Test Study Guide 
Exam with 100% Verified Answers 
1. Which of the following OSHA regulations govern suspended personnel platforms? - 
CORRECT ANSWER-OSHA 1926.550(g) 
2. According to ASME B30.3, the prohibited zone for power lines that are 60kV is? - 
CORRECT ANSWER-15ft 
3. According to ASME B30.3, load hoist rotation resistant wire rope has a design factor 
of? - CORRECT ANSWER-5 to 1 
4. According to ASME B30.3, when lifting a suspended personnel platform the design 
fa...
-
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $14.49
- + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Operating a mobile crane with a long boom, on uneven ground, what support condition 
should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER 
Separate the boom hoist lines 
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, 
before it should be removed from...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia