Nccco test questions - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco test questions? On this page you'll find 441 study documents about Nccco test questions.

Page 3 out of 441 results

Sort by

NCCCO TEST questions with verified solutions
  • NCCCO TEST questions with verified solutions

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • NCCCO TEST questions with verified solutions
    (0)
  • $9.99
  • + learn more
NCCCO Test Questions and answers with 100% correct solutions | A+ Grade
  • NCCCO Test Questions and answers with 100% correct solutions | A+ Grade

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Boom damage When taking a side strain on a boom what concerns operator the most? Capacity based on structural competence On a load chart the values above the bold line mean Allowable line pulll decreases The number of layers of rope on the drum increases the 7:1 When lifting personnel in a man basket using 6 x 19 wire rope minimum safety factor is 10:1 What is the safety factor when using rotation resistant wire rope lifting personnel in a man basket 20mph According to OSHA 1926.1431 perso...
    (0)
  • $13.48
  • + learn more
NCCCO TEST CORRECT QUESTIONS & ANSWERS(RATED A+)
  • NCCCO TEST CORRECT QUESTIONS & ANSWERS(RATED A+)

  • Exam (elaborations) • 2 pages • 2024
  • 1) According to ASME, when rails are used for the crane support, the rails splices mus: - ANSWERA) be smooth 2) What is the task of high-tensile bolt connections between tower sections? - ANSWERA) To avoid fail. 3) According to the Tower Crane Reference Manual, how often should the hoist wire rope be lubricated? - ANSWERA) Every 200 hours of operation. 6) According to sheet C, where does the climbing unit have to be located with 12 tower sections added and the guided section removed? -...
    (0)
  • $13.99
  • + learn more
NCCCO Tower Crane Test Questions with Verified Answers
  • NCCCO Tower Crane Test Questions with Verified Answers

  • Exam (elaborations) • 14 pages • 2024
  • NCCCO Tower Crane Test Questions with Verified Answers Smooth Joints Daily Do your best to finish moving load where it was des- ignated to go Person responsi- ble for lift ON Site Qualified person Before crane is placed in service Impractical Manufacturer To a fall of 6ft or more than 14 inches from neutral posi- tion 15ft start of new shift Splices in rall tracks shall have Hydraulic systems should have their proper fluid level checked If power fails during operations, ...
    (0)
  • $9.99
  • + learn more
NCCCO Test Questions with correct Answers 2024/2025( A+ GRADED 100% VERIFIED).
  • NCCCO Test Questions with correct Answers 2024/2025( A+ GRADED 100% VERIFIED).

  • Exam (elaborations) • 13 pages • 2024
  • NCCCO Test Questions with correct Answers 2024/2025( A+ GRADED 100% VERIFIED).
    (0)
  • $11.49
  • + learn more
NCCCO Test Questions and answers with 100% correct solutions | A+ Grade
  • NCCCO Test Questions and answers with 100% correct solutions | A+ Grade

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Boom damage When taking a side strain on a boom what concerns operator the most? Capacity based on structural competence On a load chart the values above the bold line mean Allowable line pulll decreases The number of layers of rope on the drum increases the 7:1 When lifting personnel in a man basket using 6 x 19 wire rope minimum safety factor is 10:1 What is the safety factor when using rotation resistant wire rope lifting personnel in a man basket 20mph According to OSHA 1926.1431 perso...
    (0)
  • $11.48
  • + learn more
NCCCO Test questions with correct answers
  • NCCCO Test questions with correct answers

  • Exam (elaborations) • 15 pages • 2023
  • Available in package deal
  • ancillary attachment - Answer devices attached to the crane that perform functions other than lifting a load with a hook, such as forks, augers, grapples, or a digging bucket anti-two block device - Answer a device that prevents two blocking from occurring if crane is used with load hoist mechanism column (mast) *TQ - Answer the vertical structure of the crane between the inner(main) boom and base designated person - Answer a person selected or assigned by the employer or employ...
    (0)
  • $14.99
  • + learn more
Nccco Test Questions With Complete Solution
  • Nccco Test Questions With Complete Solution

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • Boom up What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 1% When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? Stay in the cab until the lines are de-energized The load line of the crane you're operating contacts an energized power line. There's no sign of any other dange...
    (0)
  • $9.99
  • + learn more
NCCCO Test questions and 100% correct answers 2023
  • NCCCO Test questions and 100% correct answers 2023

  • Exam (elaborations) • 12 pages • 2023
  • ancillary attachment - correct answer devices attached to the crane that perform functions other than lifting a load with a hook, such as forks, augers, grapples, or a digging bucket anti-two block device - correct answer a device that prevents two blocking from occurring if crane is used with load hoist mechanism column (mast) *TQ - correct answer the vertical structure of the crane between the inner(main) boom and base designated person - correct answer a person selected or assigned b...
    (0)
  • $13.99
  • + learn more
NCCCO TLL Link Belt test questions and answers
  • NCCCO TLL Link Belt test questions and answers

  • Exam (elaborations) • 1 pages • 2024
  • NCCCO TLL Link Belt test questions and answers
    (0)
  • $7.99
  • + learn more