Nccco test questions - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nccco test questions? On this page you'll find 441 study documents about Nccco test questions.
Page 3 out of 441 results
Sort by
-
NCCCO TEST questions with verified solutions
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
NCCCO TEST questions with verified solutions
-
NCCCO Test Questions and answers with 100% correct solutions | A+ Grade
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $13.48
- + learn more
Boom damage When taking a side strain on a boom what concerns operator the most? 
Capacity based on structural competence On a load chart the values above the bold line mean 
Allowable line pulll decreases The number of layers of rope on the drum increases the 
7:1 When lifting personnel in a man basket using 6 x 19 wire rope minimum safety factor is 
10:1 What is the safety factor when using rotation resistant wire rope lifting personnel in a man 
basket 
20mph According to OSHA 1926.1431 perso...
-
NCCCO TEST CORRECT QUESTIONS & ANSWERS(RATED A+)
- Exam (elaborations) • 2 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
1) According to ASME, when rails are used for the crane support, the rails splices mus: - ANSWERA) be smooth 
 
2) What is the task of high-tensile bolt connections between tower sections? - ANSWERA) To avoid fail. 
 
3) According to the Tower Crane Reference Manual, how often should the hoist wire rope be lubricated? - ANSWERA) Every 200 hours of operation. 
 
6) According to sheet C, where does the climbing unit have to be located with 12 tower 
sections added and the guided section removed? -...
-
NCCCO Tower Crane Test Questions with Verified Answers
- Exam (elaborations) • 14 pages • 2024
-
- $9.99
- + learn more
NCCCO Tower Crane Test Questions with Verified Answers 
Smooth Joints 
Daily 
Do your best to 
finish moving load 
where it was des- 
ignated to go 
Person responsi- 
ble for lift 
ON Site 
Qualified person 
Before crane is 
placed in service 
Impractical 
Manufacturer 
To a fall of 6ft or 
more 
than 14 inches 
from neutral posi- 
tion 
15ft 
start of new shift 
Splices in rall tracks shall have 
Hydraulic systems should have their proper fluid level 
checked 
If power fails during operations, ...
-
NCCCO Test Questions with correct Answers 2024/2025( A+ GRADED 100% VERIFIED).
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $11.49
- + learn more
NCCCO Test Questions with correct Answers 2024/2025( A+ GRADED 100% VERIFIED).
Get paid weekly? You can!
-
NCCCO Test Questions and answers with 100% correct solutions | A+ Grade
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $11.48
- + learn more
Boom damage When taking a side strain on a boom what concerns operator the most? 
Capacity based on structural competence On a load chart the values above the bold line mean 
Allowable line pulll decreases The number of layers of rope on the drum increases the 
7:1 When lifting personnel in a man basket using 6 x 19 wire rope minimum safety factor is 
10:1 What is the safety factor when using rotation resistant wire rope lifting personnel in a man 
basket 
20mph According to OSHA 1926.1431 perso...
-
NCCCO Test questions with correct answers
- Exam (elaborations) • 15 pages • 2023
- Available in package deal
-
- $14.99
- + learn more
ancillary attachment - Answer devices attached to the crane that perform functions other than lifting a load with a hook, such as forks, augers, grapples, or a digging bucket 
 
anti-two block device - Answer a device that prevents two blocking from occurring if crane is used with load hoist mechanism 
 
column (mast) *TQ - Answer the vertical structure of the crane between the inner(main) boom and base 
 
designated person - Answer a person selected or assigned by the employer or employ...
-
Nccco Test Questions With Complete Solution
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Boom up 
What action does a signal person intend the operator to perform if he extends his arm 
at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
1% 
When hoisting personnel, within what percentage of level must a telescopic boom crane 
be in order for the gross ratings in the load chart to remain valid? 
Stay in the cab until the lines are de-energized 
The load line of the crane you're operating contacts an energized power line. There's 
no sign of any other dange...
-
NCCCO Test questions and 100% correct answers 2023
- Exam (elaborations) • 12 pages • 2023
-
Available in package deal
-
- $13.99
- + learn more
ancillary attachment - correct answer devices attached to the crane that perform functions other than lifting a load with a hook, such as forks, augers, grapples, or a digging bucket 
 
anti-two block device - correct answer a device that prevents two blocking from occurring if crane is used with load hoist mechanism 
 
column (mast) *TQ - correct answer the vertical structure of the crane between the inner(main) boom and base 
 
designated person - correct answer a person selected or assigned b...
-
NCCCO TLL Link Belt test questions and answers
- Exam (elaborations) • 1 pages • 2024
-
- $7.99
- + learn more
NCCCO TLL Link Belt test questions and answers
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia