Nccco tower crane test - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco tower crane test? On this page you'll find 43 study documents about Nccco tower crane test.

Page 3 out of 43 results

Sort by

Tower Crane Questions and Answers  NCCCO Practice Exam Latest
  • Tower Crane Questions and Answers NCCCO Practice Exam Latest

  • Exam (elaborations) • 9 pages • 2024
  • Tower Crane Questions and Answers NCCCO Practice Exam Latest Which of the following OSHA regulations govern suspended personnel platforms? - CORRECT ANSWER-OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is - CORRECT ANSWER-15 ft According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of - CORRECT ANSWER-5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardwar...
    (0)
  • $12.99
  • + learn more
Tower Crane Exam Prep (2024 / 2025 Update) Questions and Verified Answers | 100% Correct
  • Tower Crane Exam Prep (2024 / 2025 Update) Questions and Verified Answers | 100% Correct

  • Exam (elaborations) • 38 pages • 2024
  • Available in package deal
  • Tower Crane Exam Prep (2024 / 2025 Update) Questions and Verified Answers | 100% Correct Q: What is axis of rotation? Answer: The vertical line about which a crane swings Q: The condition of a super structure of a Tower Crane necessary for climbing Answer: Needs to be Balance Q: What is ballast? Answer: The weight added to the crane base to create additional stability. It does not rotate when the crane swings. Q: What is base anchor bolts? Answer: A base that is bolted to the footing Q: How many...
    (0)
  • $7.99
  • + learn more
Nccco Core + Specialty Test Prep Questions And Answers 100% Guaranteed Success.
  • Nccco Core + Specialty Test Prep Questions And Answers 100% Guaranteed Success.

  • Exam (elaborations) • 9 pages • 2024
  • Nccco Core + Specialty Test Prep Questions And Answers 100% Guaranteed Success. ASME B30.5 - correct answer. Mobile and Locomotive cranes, all types ASME B30.3 - correct answer. Tower Cranes ASME B30.23 - correct answer. Personel Lifting Regs OSHA 29 CFR 1926.1400 Series - correct answer. Cranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope - correct answer. 2 randomly broken wires in 6 diameters. 4 randomly broken ...
    (0)
  • $11.49
  • + learn more
NCCCO Tower Crane 2024 Latest and Verified
  • NCCCO Tower Crane 2024 Latest and Verified

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • NCCCO Tower Crane 2024 Latest and Verified ASME - CORRECT ANSWER-American Society of Mechanical Engineers ANSI - CORRECT ANSWER-American National Standards Institute ASME B30.3 - CORRECT ANSWER-Tower Cranes ASME B30.30 - CORRECT ANSWER-Ropes OSHA - CORRECT ANSWER-Occupational Safety and Health Administration OSHA 1926.1400cc - CORRECT ANSWER-Cranes in Construction OSHA 1926.1435 - CORRECT ANSWER-Tower Cranes A/D Director - CORRECT ANSWER-Assembly Disassembly director Must - CORRECT ANS...
    (0)
  • $11.99
  • + learn more
NCCCO Tower Crane Tests | 100% Correct Answers  Verified  Latest 2024 Version
  • NCCCO Tower Crane Tests | 100% Correct Answers Verified Latest 2024 Version

  • Exam (elaborations) • 13 pages • 2024
  • NCCCO Tower Crane Tests | 100% Correct Answers | Verified | Latest 2024 Version Splices in rail tracks shall have - Smooth Joints Hydraulic systems should have their proper fluid level checked - Daily If power fails during operations, the following shouldn't apply - Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - Person responsible for lift...
    (0)
  • $7.99
  • + learn more
NCCCO Mobile Crane Test (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct
  • NCCCO Mobile Crane Test (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct

  • Exam (elaborations) • 26 pages • 2023
  • NCCCO Mobile Crane Test (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct QUESTION Where is the tipping axis of a crawler crane located? a. It is always at the centerline of the idler or sprocket b. It depends if the idler or sprocket are in line or offset from the track rollers c. It is through the centerline of the crane cab d. It is through the boom butt section Answer: b. QUESTION What should be done with materials placed under ov...
    (0)
  • $10.49
  • + learn more
Which of the following OSHA regulations govern suspended personnel platforms?
  • Which of the following OSHA regulations govern suspended personnel platforms?

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • Tower Crane Questions and Answers NCCCO Practice Exam Latest Which of the following OSHA regulations govern suspended personnel platforms? - CORRECT ANSWER-OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is - CORRECT ANSWER-15 ft According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of - CORRECT ANSWER-5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardwar...
    (0)
  • $11.99
  • + learn more
Tower Crane Test Prep (New 2023/ 2024 Update) Questions and Verified Answers| 100% Correct
  • Tower Crane Test Prep (New 2023/ 2024 Update) Questions and Verified Answers| 100% Correct

  • Exam (elaborations) • 31 pages • 2023
  • Tower Crane Test Prep (New 2023/ 2024 Update) Questions and Verified Answers| 100% Correct QUESTION What is radius? The horizontal distance between a projection of the axis of rotation to the base of the crane QUESTION What is rated load or load rating? Answer: The maximum allowable working load designated by the manufacturer QUESTION What is rotation resistant rope? Answer: Wire rope with inner layers strand laid in one direction with the outer layer...
    (1)
  • $10.99
  • + learn more
Nccco Study test Exam Questions and  Answers Correct Verified
  • Nccco Study test Exam Questions and Answers Correct Verified

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Nccco Study test Exam Questions and Answers Correct Verified continuously - CORRECT ANSWER-during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - CORRECT ANSWER-if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - CORRECT ANSWER-OSHA's standard method crane hand signals would be located in the following designated person - CORRECT ANSWER-according to asme b30.5 ...
    (0)
  • $11.99
  • + learn more