NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024.
- Exam (elaborations) • 28 pages • 2024
-
- $9.99
- + learn more
NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024. 
 
 
What is the preferred method of performing primary-injection testing on a low voltage circuit breaker with ground fault protection? 
Use of the manufacturer's test kit or rewiring the neutral CT input is the preferred method of primary-injection testing on a low voltage circuit breaker with ground fault protection, otherwise two poles can be connected in series to provide balanced secondary currents to the trip unit. 
At what current le...
-
Motor Calculations Annotated Instructor’s Guide_ME_Level-4
- Exam (elaborations) • 38 pages • 2024
-
- $10.49
- + learn more
COMPTENCIES, OBJECTIVES, AND PERFORMANCE TASKS Power Generation Maintenance Electrician Level Four 
Power Industry Fundamentals 
Power Generation Maintenance Electrician 
Level Two 
26410-08 Motor Operation and 
Maintenance 
26301-08 Load Calculations – Branch 
and Feeder Circuits 
32401-09 Preventive and Predictive 
Maintenance 
26409-08 
Heat Tracing and Freeze Protection 
40401-09 
Standby and Emergency Systems 
26407-08 Advanced Controls 
26305-08 Overcurrent Protection 
50401-10 Gene...
-
NEC NFPA 70 Exam Questions and Answers
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
NEC NFPA 70 Exam Questions and Answers 
arc-fault circuit interruptor (AFCI) -Answer-A(n) ____ is a device intended to provide protection 
from the effects of arc faults by recognizing characteristics unique to arcing 
fitting -Answer-A(n) ____ is an accessory, such as a locknut or bushing, whose function is 
primarily mechanical, rather than electrical, in nature. 
the same panelboard or similar distribution equipment -Answer-All conductors of a multiwire 
branch circuit must originate from ___...
-
NICET LEVEL 1 INSTALLING QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS
- Exam (elaborations) • 10 pages • 2023
-
Available in package deal
-
- $9.99
- + learn more
NICET LEVEL 1 INSTALLING QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS 
The maximum number of 14AWG wires that can be pulled straight through a 4" X 2 1/8" square trade size metal electrical box is? 15 (NFPA 70 Table 314.16(A)) 
What is the first process or step you must take when working on a panel supplied with 120VAC? Lock out and Tag out the power source 
If power supplies are located remotely from the FACP, where shall their locations be posted? Fire alarm control panel (NFPA 72 10.6.8.2)...
-
NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024.
- Exam (elaborations) • 28 pages • 2024
-
- $9.99
- + learn more
NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024. 
 
 
What is the preferred method of performing primary-injection testing on a low voltage circuit breaker with ground fault protection? 
Use of the manufacturer's test kit or rewiring the neutral CT input is the preferred method of primary-injection testing on a low voltage circuit breaker with ground fault protection, otherwise two poles can be connected in series to provide balanced secondary currents to the trip unit. 
At what current le...
As you read this, a fellow student has made another $4.70
-
NICET LEVEL 1 EXAM 2023 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 6 pages • 2023
-
Available in package deal
-
- $16.49
- + learn more
The maximum number of 14AWG wires that can be pulled straight through a 4" X 2 1/8" square trade size metal electrical box is? 
15 (NFPA 70 Table 314.16(A)) 
 
 
 
What is the first process or step you must take when working on a panel supplied with 120VAC? 
Lock out and Tag out the power source 
 
 
 
If power supplies are located remotely from the FACP, where shall their locations be posted? 
Fire alarm control panel (NFPA 72 10.6.8.2) 
 
 
 
_______ 90 degree bends are permitted in an EMT r...
-
NEC NFPA 70 Exam Questions and Answers
- Exam (elaborations) • 3 pages • 2024
-
- $10.49
- + learn more
NEC NFPA 70 Exam Questions and Answers 
arc-fault circuit interruptor (AFCI) -Answer-A(n) ____ is a device intended to provide protection 
from the effects of arc faults by recognizing characteristics unique to arcing 
fitting -Answer-A(n) ____ is an accessory, such as a locknut or bushing, whose function is 
primarily mechanical, rather than electrical, in nature. 
the same panelboard or similar distribution equipment -Answer-All conductors of a multiwire 
branch circuit must originate from ___...
-
NFPA 70 NEC 2024 With 100% Correct And Verified Answers
- Exam (elaborations) • 3 pages • 2024
-
- $10.99
- + learn more
NFPA 70 NEC 2024 With 100% Correct And Verified Answers
-
Master Electrician PREP QUESTIONS WITH ANSWERS
- Exam (elaborations) • 7 pages • 2024
-
- $12.99
- + learn more
Master Electrician PREP 
QUESTIONS WITH ANSWERS 
where passing through a floor, cables shall be protected from 
physical damage at what distance above the floor? 
a. 10 inches 
b. 6 inches 
c. 12 inches 
d. 8 inches - ANSWER 6 inches 
NFPA 70 : NEC 2011 : 334.15.B 
A company has an electrical contractors license. The Master 
Electrician decides to leave the company. How many days does 
the company (licensee) have to notify the division? 
a. 30 days 
b. 10 days 
c. 20 days 
d. 5 days - ANSWER...
-
NICET LEVEL 1 INSTALLING STUDY WRITTEN EXAM.
- Exam (elaborations) • 6 pages • 2024
-
Available in package deal
-
- $11.99
- + learn more
NICET LEVEL 1 INSTALLING STUDY WRITTEN EXAM. 
 
 
The maximum number of 14AWG wires that can be pulled straight through a 4" X 2 1/8" square trade size metal electrical box is? - CORRECT ANSWER 15 (NFPA 70 Table 314.16(A)) 
 
What is the first process or step you must take when working on a panel supplied with 120VAC? - CORRECT ANSWER Lock out and Tag out the power source 
 
If power supplies are located remotely from the FACP, where shall their locations be posted? - CORRECT ANSWER Fire alarm...