Nerc exam to questions - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc exam to questions? On this page you'll find 148 study documents about Nerc exam to questions.

Page 3 out of 148 results

Sort by

NERC Certification Exam | Actual questions and answers 2023/24
  • NERC Certification Exam | Actual questions and answers 2023/24

  • Exam (elaborations) • 15 pages • 2023
  • Available in package deal
  • NERC Certification Exam | Actual questions and answers 2023/24 True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A)...
    (0)
  • $9.99
  • + learn more
NERC PREP TEST 101 EXAM |  QUESTIONS & ANSWERS | GRADED A+ | LATEST UPDATE 2023-2024
  • NERC PREP TEST 101 EXAM | QUESTIONS & ANSWERS | GRADED A+ | LATEST UPDATE 2023-2024

  • Exam (elaborations) • 97 pages • 2023
  • NERC PREP TEST 101 EXAM | QUESTIONS & ANSWERS | GRADED A+ | LATEST UPDATE If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - a. Generator MVAR output would increase
    (0)
  • $12.49
  • + learn more
NERC Certification Exam Questions and Correct Answers
  • NERC Certification Exam Questions and Correct Answers

  • Exam (elaborations) • 25 pages • 2024
  • Available in package deal
  • Correct Answer: B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - Correct Answer: B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) True B) False - Correct Answer: B) False True/False The NERC Functional Model is designed so that the functions of Generator Owner and Generator Operator can be...
    (0)
  • $13.49
  • + learn more
NERC Exam Final Assessment Questions and Correct Answers Graded A+
  • NERC Exam Final Assessment Questions and Correct Answers Graded A+

  • Exam (elaborations) • 79 pages • 2024
  • NERC Exam Final Assessment Questions and Correct Answers Graded A+When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% -AnswerB. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geoth...
    (0)
  • $11.49
  • + learn more
NERC Exam Study 601 Questions & Answers
  • NERC Exam Study 601 Questions & Answers

  • Exam (elaborations) • 17 pages • 2024
  • NERC Exam Study 601 Questions & Answers What is the ACE equation? - ANS-(NIa-NIs)-10B(Fa-Fs) What effect does an internal loss of load have on frequency and ACE? - ANS-Frequency increases, ACE increases What effect does an external loss of load have on frequency and ACE? - ANS-Frequency increases, No change in ACE What happens to your frequency, ACE value, and Tie-line flow when you experience a loss of generation external to your area? - ANS-Frequency drops, No change in ACE, Tie-line...
    (0)
  • $14.49
  • + learn more
ISA Utility Specialist (Chapters 1-7) Exam Questions With 100% Correct Answers
  • ISA Utility Specialist (Chapters 1-7) Exam Questions With 100% Correct Answers

  • Exam (elaborations) • 35 pages • 2024
  • ISA Utility Specialist (Chapters 1-7) Exam Questions With 100% Correct Answers In the U.S., enforcement of safety work rules resides with: - answerOccupational Safety & Health Administration (OSHA) Utility pruning is the pruning of trees located in the vicinity of power lines for the purpose of __________ __________ __________. - answerensuring reliable service A comprehensive vegetation management program should be __________ rather than reactive, & based on principals of __________ veg...
    (0)
  • $14.49
  • + learn more
NERC Certification Exam | latest 2023/24 with full solution
  • NERC Certification Exam | latest 2023/24 with full solution

  • Exam (elaborations) • 15 pages • 2023
  • NERC Certification Exam | latest 2023/24 with full solution True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) Tr...
    (0)
  • $9.99
  • + learn more
ISA Utility Specialist (Chapters 1-7) Exam Questions With 100% Correct Answers
  • ISA Utility Specialist (Chapters 1-7) Exam Questions With 100% Correct Answers

  • Exam (elaborations) • 35 pages • 2024
  • ISA Utility Specialist (Chapters 1-7) Exam Questions With 100% Correct Answers In the U.S., enforcement of safety work rules resides with: - answerOccupational Safety & Health Administration (OSHA) Utility pruning is the pruning of trees located in the vicinity of power lines for the purpose of __________ __________ __________. - answerensuring reliable service A comprehensive vegetation management program should be __________ rather than reactive, & based on principals of __________ veg...
    (0)
  • $14.49
  • + learn more
NERC RC Exam Complete Study Questions And Answers With Verified Solutions
  • NERC RC Exam Complete Study Questions And Answers With Verified Solutions

  • Exam (elaborations) • 7 pages • 2023
  • NERC RC Exam Complete Study Questions And Answers With Verified Solutions Common standard time period for station battery to handle outage of AC power to chargers 8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful 2 hours Transition period to backup control facility (fully functioning) 2 hours Annual testing of backup control facility must prove to be functional for this long 2 hours
    (0)
  • $11.49
  • + learn more
NERC RC Exam| 100 Questions| accurate Answers| Verified
  • NERC RC Exam| 100 Questions| accurate Answers| Verified

  • Exam (elaborations) • 7 pages • 2024
  • NERC RC Exam| 100 Questions| accurate Answers| Verified Common standard time period for station battery to handle outage of AC power to chargers - ANSWER 8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful - ANSWER 2 hours Transition period to backup control facility (fully functioning) - ANSWER 2 hours Annual testing of backup control facility must prove to be functional for this long - ANSWER 2 hours Every 2 years TO/TOP/D...
    (0)
  • $10.99
  • + learn more