NERC PREP TEST 101 questions with correct answers
- Exam (elaborations) • 66 pages • 2023
- Available in package deal
-
- $15.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system CORRECT ANSWER a. Generator MVAR output would increase 
 
2. When system conditions are such that emergency procedures are expected to be implemented, whi...
-
NERC Prep Test Questions with Complete Solutions Rated A+
- Exam (elaborations) • 57 pages • 2023
- Available in package deal
-
- $14.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 
1400 MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system -Answer a. Generator MVAR output 
would increase 
2. When system conditions are such that emergency procedures are expected to be 
implemented, which of th...
-
NERC Prep - Bal, Int, & Trans Test Questions & Answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.29
- + learn more
NERC Prep - Bal, Int, & Trans Test Questions & Answers 
1 / 21 
1. What group can approve a change in the 
Disturbance Recovery Period for an Interconnection? 
a. NERC Interconnection Working Group 
b. NERC Operating Committee 
c. NERC Regional Council 
d. NERC Disturbance Analysis Working 
Group 
2. What is the first thing an operator should 
do after a relay operation? 
a. Check power system stabilizers 
b. Notify adjacent Transmission and Balancing areas 
c. Check targets and equipment ...
-
SOS NERC Prep - RElIABILITY Exam Questions With 100% Correct Answers.
- Exam (elaborations) • 50 pages • 2023
-
- $25.99
- + learn more
SOS NERC Prep - RElIABILITY Exam Questions With 100% Correct Answers.
-
SOS NERC Prep - RElIABILITY Exam 2023-2024 Questions and Answers 100% Correct
- Exam (elaborations) • 54 pages • 2023
- Available in package deal
-
- $14.99
- + learn more
SOS NERC Prep - RElIABILITY Exam Questions and Answers 100% CorrectSOS NERC Prep - RElIABILITY Exam Questions and Answers 100% CorrectSOS NERC Prep - RElIABILITY Exam Questions and Answers 100% Correct 
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange...
Fear of missing out? Then don’t!
-
NERC PREP TEST 101 Questions With 100% Verified Answers
- Exam (elaborations) • 61 pages • 2024
- Available in package deal
-
- $20.49
- + learn more
NERC PREP TEST 101 Questions With 100% Verified Answers 
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 
MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - ANS-a. Generator MVAR output would increase 
2. When system conditions are such that emergency ...
-
SOS NERC Prep - RELIABILITY Exam – Q&A
- Exam (elaborations) • 66 pages • 2023
-
Available in package deal
-
- $19.99
- + learn more
SOS NERC Prep - RELIABILITY Exam – Q&A
-
NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct
- Exam (elaborations) • 54 pages • 2024
-
- $16.49
- + learn more
If a 500 kV transmission line with a surge impedance loading of 800 MW is 
currently loaded at 1400 MW, which of the following events would most likely 
occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - a. Generator MVAR output 
would increase 
2. When system conditions are such that emergency procedures are expected to be 
implemented, which of the follow...
-
NERC Prep Exam Questions and Answers Latest 2023-2024 Graded A+
- Exam (elaborations) • 22 pages • 2023
- Available in package deal
-
- $16.49
- + learn more
NERC Prep Exam Questions and Answers Latest Graded A+. What Energy Alert Level would the following 
example be categorized as? 
"A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees, 
or is experiencing conditions where all available resources are committed to meet 
firm load, firm transactions, etc, and requests an Energy Emergency Alert." 
NERC Prep - Bal, Int, & Trans Exam Questions 
and Answers Graded A+ 
a. Energy Emergency Alert Level IV 
b. Energy Emergency Al...
-
SOS NERC Prep - Reliability Exam| 200Questions and Correct Answers.
- Exam (elaborations) • 54 pages • 2023
-
- $12.99
- + learn more
SOS NERC Prep - Reliability Exam| 200Questions and Correct Answers. 
The Reliability Coordinator just informed you of a slow time error correction which will 
begin at the top of the next hour. Your EMS system will not let you change your 
scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action 
should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
C) Decrease Net ...