Nicet leve - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nicet leve? On this page you'll find 680 study documents about Nicet leve.

Page 3 out of 680 results

Sort by

Nicet Level 1 Study Guide Questions | 150 Questions with 100% Correct Answers | Updated & Verified
  • Nicet Level 1 Study Guide Questions | 150 Questions with 100% Correct Answers | Updated & Verified

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • When testing a water level supervisory switch serving a pressure tank a signal shall indicate if the water level _____________from the required level (NFPA 72, Table 14.4.3.2 17 (j) (4) - ANS - rises or falls over 3 inches If combination audible/visible appliances are installed the location of the installed appliance shall be determined by the requirements of _______. (Nfpa 72 18.4.8.1) - ANS - the visible appliance What is the maximum number of 12 gauge THHN wires that can be installed in...
    (1)
  • $15.49
  • 2x sold
  • + learn more
NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024
  • NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024 Chapter 1 - Answer-Administration Chapter 2 - Answer-Referenced Publications (Other NFPA Standards) Chapter 3 - Answer-Definitions Chapter 4 - Answer-General Requirements (Owner's Chapter) Chapter 5 - Answer-Sprinkler Systems (Heads, Hangers, Waterflow Alarm Devices, AF Systems, Dry Pipe Systems) Chapter 6 - Answer-Standpipe & Hose Systems Chapter 7 - Answer-Hydra...
    (0)
  • $11.49
  • 1x sold
  • + learn more
NICET Level 1 ITM Of Water-Based Systems questions with correct answers
  • NICET Level 1 ITM Of Water-Based Systems questions with correct answers

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • Who is responsible for the inspection, testing, maintenance and impairment of a water based fire protection system? - Answer The Property owner or designated representative Who's responsibility is it to provide accessibility to components of a water based fire protection system? - Answer The property owner or designated representative Who shall correct or repair deficiencies or impairments found during the inspection, test and maintenance required by standard? - Answer The property ...
    (0)
  • $14.99
  • 1x sold
  • + learn more
Nicet level 1 Study Guide Questions and complete solutions
  • Nicet level 1 Study Guide Questions and complete solutions

  • Exam (elaborations) • 15 pages • 2023
  • When testing a water level supervisory switch serving a pressure tank a signal shall indicate if the water level _____________from the required level (NFPA 72, Table 14.4.3.2 17 (j) (4) - rises or falls over 3 inches If combination audible/visible appliances are installed the location of the installed appliance shall be determined by the requirements of _______. (Nfpa 72 18.4.8.1) - the visible appliance What is the maximum number of 12 gauge THHN wires that can be installed in 1...
    (0)
  • $10.49
  • 1x sold
  • + learn more
Nicet Level 1 AND 2 TESTS
  • Nicet Level 1 AND 2 TESTS

  • Exam (elaborations) • 22 pages • 2024
  • Nicet Level 1 AND 2 TESTS When a device is inaccessible due to excessive height, such as an atrium, what it the maximum interval for testing? - CORRECT ANSWER 18 months When installing a wall-mounted fire telephone appliance to the public, what is the acceptable maximum mounting height from the floor? - CORRECT ANSWER 66 inches Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the center-line of the door? - CORRECT ANSWER 21 feet At minimum, when w...
    (0)
  • $22.49
  • + learn more
NICET Level III Hydraulics questions with correct answers
  • NICET Level III Hydraulics questions with correct answers

  • Exam (elaborations) • 2 pages • 2023
  • Available in package deal
  • 7.48 - Answer How many gallons of water in 1 cubic foot? 62.4 lbs/ft^3 - Answer Weight of water? Pressure = Force / Area - Answer Formula for pressure? Water works supply - Answer What type of water supply is preferred? The size of the system riser - Answer For a pipe schedule design, the underground supply must be a minimum of? Hose stream demands - Answer If pumps serve only sprinklers, they are permitted to be sized to provide the flow needed for the sprinkler syste...
    (0)
  • $7.99
  • 1x sold
  • + learn more
NICET LEVEL 2 FULL EXAM
  • NICET LEVEL 2 FULL EXAM

  • Exam (elaborations) • 36 pages • 2024
  • You are inspecting a construction site and notice that the soil appears to be a fine-grained, cohesive material with good bearing capacity. What type of soil is this likely to be? a. Clay b. Sand c. Gravel d. Loam - Answer-a. Clay You are inspecting the clearing and grubbing of a construction site and notice that a large tree has been removed within the limits of disturbance. What should you do? a. Notify the project manager and request that a replacement tree be planted b. Document...
    (0)
  • $14.99
  • + learn more
NICET Level 1 Fire Alarms ( 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)
  • NICET Level 1 Fire Alarms ( 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)

  • Exam (elaborations) • 23 pages • 2024
  • NICET Level 1 Fire Alarms (Update) Qs & As| 100% Correct| Grade A (Verified Answers) Q: At which height must cables be physically protected when being installed within an exposed ceiling? Answer: 7 feet Q: When shall smoke detectors be installed during the construction process? Answer: After the final cleanup of all trades Q: Where structural members are provided, intermediate metal conduit shall be secured within which maximum distance from an outlet box" ...
    (0)
  • $10.99
  • + learn more
NICET Level 1 Water-Based Systems (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)
  • NICET Level 1 Water-Based Systems (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)

  • Exam (elaborations) • 38 pages • 2024
  • NICET Level 1 Water-Based Systems (Latest Update) Qs & As| 100% Correct| Grade A (Verified Answers) Q: What type of valve is designed for the purpose of reducing downstream water pressure under both residual and static conditions Answer: Pressure reducing valve Q: PIV and OS&Y shall be backed a __________ turn from the fully open position to prevent jamming. Answer: 1/4 Q: Gauges not accurate to within _______ percent of the full scale shall be recalibrated or repl...
    (0)
  • $10.99
  • + learn more
 NICET LEVEL 1 - WATER BASED LAYOUT PRACTICE QUESTIONS AND ANSWERS AGRADENICET LEVEL 1 - WATER BASED LAYOUT PRACTICE QUESTIONS AND ANSWERS AGRADE.
  • NICET LEVEL 1 - WATER BASED LAYOUT PRACTICE QUESTIONS AND ANSWERS AGRADENICET LEVEL 1 - WATER BASED LAYOUT PRACTICE QUESTIONS AND ANSWERS AGRADE.

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • NICET LEVEL 1 - WATER BASED LAYOUT PRACTICE QUESTIONS AND ANSWERS AGRADENICET LEVEL 1 - WATER BASED LAYOUT PRACTICE QUESTIONS AND ANSWERS AGRADE.
    (1)
  • $13.99
  • + learn more