Overhead crane - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Overhead crane? On this page you'll find 578 study documents about Overhead crane.
Page 3 out of 578 results
Sort by
-
NCCCO Overhead Crane Questions and 100%Correct Answers.
- Exam (elaborations) • 8 pages • 2024
-
- $12.99
- + learn more
NCCCO Overhead Crane Questions and 100%Correct Answers. 
Overhead cranes with more than one hoisting unit shall have? correct answers Its rated load 
marked on it. 
How often does O.S.H.A. require a written wire rope inspection? correct answers Once a month 
What is the purpose of the "E" (Emergency) stop on an overhead crane? correct answers 
Removes power to entire crane. 
Most loads should be rigged to within how many degrees of level? correct answers 5 
According to ASME B30.2, what is the...
-
Overhead Crane Test Questions and Answers Fully Solved 100%
- Exam (elaborations) • 7 pages • 2024
-
- $7.99
- + learn more
According to OSHA, how many wraps must be left on the hoist drum of an overhead 
crane with the hook at its lowest position? - Answer-3 wraps 
Before leaving an overhead crane unattended, attached loads should be? - Answerlowered to the floor 
A floor weight limitation is posted at 700 pounds per square foot maximum. Before 
lowering a load down onto this floor that is calculated at 900 pounds per square foot, 
what must be done? - Answer-install cribbing to increase surface bearing area 
An obj...
-
NCCCO Overhead Crane Questions and 100%Correct Answers.
- Exam (elaborations) • 8 pages • 2024
-
- $12.99
- + learn more
NCCCO Overhead Crane Questions and 100%Correct Answers. 
Overhead cranes with more than one hoisting unit shall have? correct answers Its rated load 
marked on it. 
How often does O.S.H.A. require a written wire rope inspection? correct answers Once a month 
What is the purpose of the "E" (Emergency) stop on an overhead crane? correct answers 
Removes power to entire crane. 
Most loads should be rigged to within how many degrees of level? correct answers 5 
According to ASME B30.2, what is the...
-
NCCCO OVERHEAD CRANE REAL EXAM ALL 100 QUESTIONS AND WELL ELABORATED ANSWERS TOP RATED VERSION FOR 2024-2025 ALREADY A GRADED WITH EXPERT FEEDBACK|NEW!!{REVISED}
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $17.99
- + learn more
NCCCO OVERHEAD CRANE REAL EXAM ALL 
100 QUESTIONS AND WELL ELABORATED 
ANSWERS TOP RATED VERSION FOR 
ALREADY A GRADED WITH EXPERT 
FEEDBACK|NEW!!{REVISED}
-
Overhead Crane Test Prep (New 2023/ 2024 Update) Questions and Verified Answers| 100% Correct
- Exam (elaborations) • 20 pages • 2023
-
Available in package deal
-
- $10.49
- + learn more
Overhead Crane Test Prep (New 2023/ 2024 
Update) Questions and Verified Answers| 
100% Correct 
 
QUESTION 
 what components shall be provided for outdoor bridge cranes? 
 
 
Answer: 
rail clamps and wind indicator 
 
 
 
QUESTION 
 what type of fire extinguisher should NOT be used? 
 
 
Answer: 
carbon tetrachloride 
 
 
 
QUESTION 
 what procedures are used when the load approaches near or over personel? 
 
 
Answer: 
A warning signal shall be sounded 
 
 
 
QUESTION 
 what is a hoist...
And that's how you make extra money
-
Overhead Crane Test Exam Questions And Answers
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
Overhead Crane Test Exam Questions And Answers 
 
 
its rated load marked on it - ANS Overhead cranes with more than one hoisting unit shall have what? 
 
removes power to entire crane - ANS What is the purpose of the "E" (Emergency) stop on an overhead crane? 
 
once a month - ANS How often does O.S.H.A. require a written wire rope inspection? 
 
five - ANS Most loads should be rigged to within how many degrees of level? 
 
5 to 1 - ANS According to ASME B30.2, what is the saf...
-
NCCCO Overhead Crane questions well answered to pass
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
NCCCO Overhead Crane questions well answered to pass
-
NCCCO Overhead Crane Questions and answers with 100% correct solutions | A+ Grade
- Exam (elaborations) • 12 pages • 2024
-
- $8.99
- + learn more
Overhead cranes with more than one hoisting unit shall have? Its rated load marked on it. 
How often does O.S.H.A. require a written wire rope inspection? Once a month 
What is the purpose of the "E" (Emergency) stop on an overhead crane? Removes power to entire 
crane. 
Most loads should be rigged to within how many degrees of level? 5 
According to ASME B30.2, what is the safety factor for rigging? 5 to 1 
According to O.S.H.A. frequent inspections shall be performed? Daily to monthly 
Accor...
-
VA Contractors: VA Advanced (Class A) Questions & Answers
- Exam (elaborations) • 4 pages • 2024 Popular
- Available in package deal
-
- $9.99
- 3x sold
- + learn more
A lump sum contract on a project has a total contract price of $160,000. Retainage has been held back at 10%. The contractor has received progress payments for 75% of the project. The contractor submits a request for final payment for the new completed project. The final payment amount should be for... - ANSWER-More than $50,000 
 
What is the total value of current assets for an accrual basis company that has the following? Checking account cash balance is $4,800; materials inventory for work-i...
-
NCCCO Overhead Crane-with 100% verified solutions 2024-2025
- Exam (elaborations) • 16 pages • 2024
-
- $12.49
- + learn more
NCCCO Overhead Crane-with 100% verified solutions
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia