Pjm generation operation - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Pjm generation operation? On this page you'll find 50 study documents about Pjm generation operation.

Page 3 out of 50 results

Sort by

PJM Generation Operation Exam Questions with Complete Verified Solution 2024/2025
  • PJM Generation Operation Exam Questions with Complete Verified Solution 2024/2025

  • Exam (elaborations) • 5 pages • 2024
  • QUESTIONS AND ANSWERS
    (0)
  • $8.99
  • + learn more
PJM Generation Operation Exam | 65 Questions with 100% Correct Answers | Verified | Latest Update 2024
  • PJM Generation Operation Exam | 65 Questions with 100% Correct Answers | Verified | Latest Update 2024

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • Control center facilities must have a minimum of how many days of fuel for the backup generator? - 5 days If PJM ACE shows overgeneration, actual imports are: - Less than scheduled Who should a generator contact at PJM to clear an outage ticket? - Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: - +/-.02 Hz What frequency would PJM set to correct for fast-time error? - 59.98Hz What frequency would PJM set to correct for slow-time error? - 60...
    (0)
  • $7.99
  • + learn more
PJM Flash Card Transmission Questions  and Answers Already Passed
  • PJM Flash Card Transmission Questions and Answers Already Passed

  • Exam (elaborations) • 88 pages • 2024
  • Available in package deal
  • PJM Flash Card Transmission Questions and Answers Already Passed What would be an appropriate action for a transmission system operator to implement during a PJM issued cold weather alert? Man all combustion turbines Man all transmission facilities Defer or cancel facility maintenance and testing Open all SF6 circuit breakers Defer or cancel facility maintenance and testing During restoration situations, dynamic reserve generator load pick-up factors are defined as which of the f...
    (0)
  • $11.99
  • + learn more
PJM Sample Test Review 2024 Questions and Answers
  • PJM Sample Test Review 2024 Questions and Answers

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • PJM Sample Test Review 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer ️️ -off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer ️️ -Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - Correct Answer ️️ -PJM calls on synchronized reserves If not cancelled by...
    (0)
  • $12.49
  • + learn more
PJM Sample Test Review 2024 Questions and Answers
  • PJM Sample Test Review 2024 Questions and Answers

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • PJM Sample Test Review 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer ️️ -off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer ️️ -Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - Correct Answer ️️ -PJM calls on synchronized reserves If not cancelled by...
    (0)
  • $12.49
  • + learn more
PJM Generation Operation Exam 2023/2024 latest updated
  • PJM Generation Operation Exam 2023/2024 latest updated

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • PJM Generation Operation Exam 2023/2024 latest updated
    (0)
  • $7.99
  • + learn more
PJM Sample Test Review 150 Questions with 100% Verified Correct Answers
  • PJM Sample Test Review 150 Questions with 100% Verified Correct Answers

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • PJM Sample Test Review 150 Questions with 100% Verified Correct Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - Correct Answer PJM calls on synchronized reserves If not cancelled by...
    (0)
  • $11.99
  • + learn more
Generator operational requirements: PJM  Manual 14 Exam | Questions & 100% Correct  Answers (Verified) | Latest Update | Grade A+
  • Generator operational requirements: PJM Manual 14 Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • True or false? The interconnection coordination project manager coordinates the activities of PJM internal coordination and the generation owner to complete the generator markets and operations activities : True True or false? In the event that a local geography name has already been used in another part of PJM, a local landmark will be identified and used for the PJM naming convention : True True or false? A generation owner shall mean a member that owns or leases with right equiv...
    (0)
  • $10.49
  • + learn more
PJM Generation Dispatcher Sample Exam Questions and Answers
  • PJM Generation Dispatcher Sample Exam Questions and Answers

  • Exam (elaborations) • 12 pages • 2024
  • PJM Generation Dispatcher Sample Exam Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating : A. below 60 hertz B. on a new price curve C. on a new cost curve D. off cost ( out of merit) - Correct Answer ️️ -D. off cost ( out of merit ) Monitoring LMP may give insights into : A. system constraints B. system voltage C. system frefuency D. time error - Correct Answer ️️ -A. system constraints PJM calls for which o...
    (0)
  • $12.49
  • + learn more