Pjm generator exam 2024 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Pjm generator exam 2024? On this page you'll find 29 study documents about Pjm generator exam 2024.
Page 3 out of 29 results
Sort by
-
PJM Generation Operation Exam 2024 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass
- Exam (elaborations) • 15 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
PJM Generation Operation Exam 2024 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass 
Control center facilities must have a minimum of how many days of fuel for the backup generator? - 5 days 
If PJM ACE shows overgeneration, actual imports are: - Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? - Master Coordinator 
To correct for a slow or fast clock, system frequency schedules are offset by: - +/-.02 Hz 
What frequency would P...
-
PJM Generation Operation Exam 2024 Questions with Correct Answers
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
PJM Generation Operation Exam 2024 Questions with Correct Answers 
Control center facilities must have a minimum of how many days of fuel for the backup generator? - Correct Answer 5 days 
 
If PJM ACE shows overgeneration, actual imports are: - Correct Answer Less than scheduled 
 
Who should a generator contact at PJM to clear an outage ticket? - Correct Answer Master Coordinator 
 
To correct for a slow or fast clock, system frequency schedules are offset by: - Correct Answer +/-.02 Hz 
 
Wha...
-
PJM Practice Exam 2024 Questions and Answers
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Practice Exam 2024 Questions and Answers 
Real time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. 
D. off cost (out of merit). - Correct Answer ️️ -off cost (out of merit) 
What is the minimum size for a solar park to be required to have real and reactive 
power 
telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - Correct Answer ️️ -3 MW 
PJM calls for which of the following t...
-
PJM Generation Dispatcher Exam Practice Questions & Answers 2024
- Exam (elaborations) • 6 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
PJM Generation Dispatcher Exam Practice Questions & Answers 2024 
 
 
An EXCITER on a traditional generator does what? - ANSWER-Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - ANSWER-Limits 
 
When synchronizing to the interconnection, what needs to be synchronized? - ANSWER-Frequency, Voltage, and phase angle. 
 
GMD (GeoMagnetic Disturbance) procedure is implemented when? - ANSWER-10A or...
-
PJM Generation Operation Exam 2024 Questions and Answers
- Exam (elaborations) • 8 pages • 2024
-
- $12.49
- + learn more
Fear of missing out? Then don’t!
-
PJM Generator Exam | 61 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $9.49
- + learn more
PJM Generator Exam | 61 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass
-
PJM Generation Dispatcher Practice Exam Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass
- Exam (elaborations) • 12 pages • 2024
-
Available in package deal
-
- $10.49
- + learn more
PJM Generation Dispatcher Practice Exam Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass 
An EXCITER on a traditional generator does what? - Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - Limits 
When synchronizing to the interconnection, what needs to be synchronized? - Frequency, Voltage, and phase angle. 
GMD (GeoMagnetic Disturbance) procedure is implement...
-
PJM Generation Dispatcher Exam Practice | 65 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 6 pages • 2024
-
- $12.99
- + learn more
PJM Generation Dispatcher Exam Practice | 65 Questions with 100% Correct Answers | Verified | Latest Update 2024 
An EXCITER on a traditional generator does what? ANS-Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
 
ECO Min, ECO Max, and EMERG Max are genrator _________________. ANS-Limits 
 
When synchronizing to the interconnection, what needs to be synchronized? ANS-Frequency, Voltage, and phase angle. 
 
GMD (GeoMagnetic Disturbance) procedure is impl...
-
PJM Generator Exam | 60 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 6 pages • 2024
-
- $8.79
- + learn more
PJM Generator Exam | 60 Questions with 100% Correct 
Answers | Verified | Latest Update 2024 
The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line 
and at full output _________ - - immediately upon receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators 
should: - - Ensure all unit voltage regulators are in service 
PJM can issue the Deploy All Resources Action for________ - - the...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia